Roofing
Assembly[1] Non-combustible materials Fully sarked, junctions sealed Vents fitted with ember guards Guttering RULES NCC 2022 V2 All Building Classes
NCC 2022 G5D1 & H7D4 [2019 G5.0, 3.10.5]
May 2023
NCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 AS 3959:2018, 5.6.7 Skylight RULES NCC 2022 V3 All Building Classes
NCC 2022 G5D1 & H7D4 [2019 G5.0, 3.10.5]
May 2023
NCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 AS 3959:2018, 5.6.5 Building elements within Bushfire-Prone Areas to be Bushfire Attack Resistant to the NCCNCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 SkylightAS 3959:2018, 5.6.5 Sealed / fully flashed with non-combustible material Grade A safety glass to AS 1288 Polymer skylight allowed with Grade A safety glass diffuser below glazing Insulated glazing unit requires ≥ 4mm thick Grade A toughened safety glass to outer panel Eaves & Fascia RULES NCC 2022 V2 All Building Classes
NCC 2022 G5D1 & H7D4 [2019 G5.0, 3.10.5]
May 2023
AS 3959:2018, 5.6.6 NCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 Building elements within Bushfire-Prone Areas to be Bushfire Attack Resistant to the NCCAS 3959:2018, 5.6.6 NCC 2022 Vol 1, G5D1 Roof ComponentsNCC 2022 Vol 2, H7D4 Gables constructed as per wall requirements Fit openings for ventilation of eaves, with ember guards & protect with screens Seals to be of corrosion-resistant aluminium, bronze, or steel Seal joints with timber storm moulds or plastic joining strips Roofing RULES NCC 2022 V3 All Building Classes
NCC 2022 G5D1 & H7D4 [2019 G5.0, 3.10.5]
May 2023
NCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 AS 3959:2018, 5.6.1 Building elements within Bushfire-Prone Areas to be Bushfire Attack Resistant to the NCCNCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 RoofingAS 3959:2018, 5.6.1 Non-combustible cover Seal Roof/Roof & Roof/Wall junctions, or Backed with a breathable sarking or mesh Fit roof ventilation openings with non-combustible ember guards, or screens Evaporative coolers AS/NZS 60335.2.98 compliant If with an internal damper preventing ember entry, does not require external screening Screen RULES NCC 2022 V2 All Building Classes
NCC 2022 G5D1 & H7D4 [2019 G5, 3.10.5]
May 2023
NCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 AS 3959:2018, 3.6.1 Penetration RULES NCC 2022 V2 All Building Classes
NCC 2022 G5D1 & H7D4 [2019 G5.0, 3.10.5]
May 2023
NCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 AS 3959:2018, 5.6.5 Building elements within Bushfire-Prone Areas to be Bushfire Attack Resistant to the NCC NCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 Roof PenetrationAS 3959:2018, 5.6.5 Sealed with non-combustible material Openings screened ≥ 4mm toughened Grade A safety glass for overhead glazing PVC vent pipes allowed Fit evaporative coolers with non-combustible butterfly closers, or Non-combustible covers with screens Metal Sheet Roof RULES NCC 2022 V2 All Building Classes
NCC 2022 G5D1 & H7D4 [2019 G5.0, 3.10.5]
May 2023
NCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 AS 3959:2018, 5.6.3 Building elements within Bushfire-Prone Areas to be Bushfire Attack Resistant to the NCCNCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 Sheet RoofsAS 3959:2018, 5.6.3 Fully sarked over battens Seal gaps along fascia, ridges , hips, & wall lines by any of the following Mesh or perforated screen Mineral wool Non-combustible material Tiled Roof RULES NCC 2022 V2 All Building Classes
NCC 2022 G5D1 & H7D4 [2019 G5, 3.10.5]
May 2023
NCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 AS 3959:2018, 5.6.2 Building elements within Bushfire-Prone Areas to be Bushfire Attack Resistant to the NCCNCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 Tiled RoofsAS 3959:2018, 5.6.2 Cover roof framing is completely with sarking, battens may be installed on top of it Apply sarking over the hips and ridges, ensuring it continues into the gutters and valleys AS 3959:2018, 5.6.1 AssemblyAS 3959:2018, 5.6.1 Non-combustible materials Fully sarked, junctions sealed Vents fitted with ember guards Skylights
Sealed & of Grade A safety glass[1] Skylight RULES NCC 2022 V3 All Building Classes
NCC 2022 G5D1 & H7D4 [2019 G5.0, 3.10.5]
May 2023
NCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 AS 3959:2018, 5.6.5 Building elements within Bushfire-Prone Areas to be Bushfire Attack Resistant to the NCCNCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 SkylightAS 3959:2018, 5.6.5 Sealed / fully flashed with non-combustible material Grade A safety glass to AS 1288 Polymer skylight allowed with Grade A safety glass diffuser below glazing Insulated glazing unit requires ≥ 4mm thick Grade A toughened safety glass to outer panel AS 3959:2018, 5.6.5 Garage Doors
Non-combustible materials[1] Seals all round[2] Ventilation slots if any, screened[3] Garage Doors RULES NCC 2022 V2 All Building Classes
NCC 2022 G5D1 & H7D4 [2019 G5.0, 3.10.5]
May 2023
NCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 AS 3959:2018, 5.5.6 AS 3959:2018, 5.5.6 (b) AS 3959:2018, 5.5.6 (c) Bushfire-resisting Timber BAL-12.5 NCC 2022 V3 All Building Classes
NCC 2022 G5D1 & H7D4 [2019 G5, 3.10.5]
May 2023
NCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 AS 3959:2018, F4 AS 3959:2018, E1 AS 3959:2018, 1.5.5 Screen RULES NCC 2022 V2 All Building Classes
NCC 2022 G5D1 & H7D4 [2019 G5, 3.10.5]
May 2023
NCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 AS 3959:2018, 3.6.1 AS 3959:2018, 5.5.6 AS 3959:2018, 5.5.6 (b) AS 3959:2018, 5.5.6 (c) Doors, Frames, Sidelights
Doors with seals all round[1] Leaf non-combustible or ≥ 35mm solid core[2] Frames to be, metal, bushfire resisting timber, allowed timber species, or metal reinforced uPVC[3] ≥ 4mm Grade A safety glass[4] Door RULES NCC 2022 V2 All Building Classes
NCC 2022 G5D1 & H7D4 [2019 G5.0, 3.10.5]
May 2023
NCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 AS 3959:2018, 5.5.4 (c) (ii) AS 3959:2018, 5.5.4 (c) (iv) AS 3959:2018, 5.5.4 (c) (i) AS 3959:2018, 5.5.4 (c) (v) AS 3959:2018, 5.5.4 (c) (vii) AS 3959:2018, 5.5.4 (a) AS 3959:2018, 5.5.4 (b) Building elements within Bushfire-Prone Areas to be Bushfire Attack Resistant to the NCC NCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 Door Assembly Install seals & weather stripsAS 3959:2018, 5.5.4 (c) (ii) Tight-fitting to door frame and abutting doorAS 3959:2018, 5.5.4 (c) (iv) Door LeafAS 3959:2018, 5.5.4 (c) (i) ≥ 35mm thk reconstituted, laminated, or solid timber for first 400mm above threshold, orHollow core, or reconstituted timber, with non-combustible kickplate for first 400mm above threshold If without kickplate, must be externally protected by screens Glazed door panels with full framing made of metal, bushfire-resisting timber, uPVC, or allowed timber species FramesAS 3959:2018, 5.5.4 (c) (v) Metal, bushfire-resisting timber, allowed timber species, or metal-reinforced uPVC Metal reinforcement to be of aluminium, stainless steel, or corrosion-resistant steel GlazingAS 3959:2018, 5.5.4 (c) (vii) ≥ 4mm Grade A safety glassNo requirements on door if Protected by a bushfire shutter, orAS 3959:2018, 5.5.4 (a) Protected by screensAS 3959:2018, 5.5.4 (b) Bushfire-resisting Timber BAL-12.5 NCC 2022 V3 All Building Classes
NCC 2022 G5D1 & H7D4 [2019 G5, 3.10.5]
May 2023
NCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 AS 3959:2018, F4 AS 3959:2018, E1 AS 3959:2018, 1.5.5 AS 3959:2018, 5.5.4 (c) (i) AS 3959:2018, 5.5.4 (c) (ii) AS 3959:2018, 5.5.4 (c) (iv) AS 3959:2018, 5.5.4 (c) (v) Decks & Landing
Fully enclosing a sub-floor will provide protection[1] Non-combustible material[2] Bushfire-resisting Timber BAL-12.5 NCC 2022 V3 All Building Classes
NCC 2022 G5D1 & H7D4 [2019 G5, 3.10.5]
May 2023
NCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 AS 3959:2018, F4 AS 3959:2018, E1 AS 3959:2018, 1.5.5 Deck and Landing RULES NCC 2022 V2 All Building Classes
NCC 2022 G5D1 & H7D4 [2019 G5, 3.10.5]
May 2023
NCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 AS 3959:2018, 5.7.2.1 AS 3959:2018, 5.7.2.4 AS 3959:2018, 5.7.1 NSW RFS 2019 PBP, 7.5.2 Building elements within Bushfire-Prone Areas to be Bushfire Attack Resistant to the NCCNCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 Decking may be spacedAS 3959:2018, 5.7.2.1 & has no requirements unless < 300mm horizontally & < 400mm vertically from a glazed Window or Door AS 3959:2018, 5.7.2.4 , then must be Non-combustible material Bushfire-resisting Timber Allowed Timber Species uPVC If Enclosing Walls are constructed & ≤ 400mm from ground AS 3959:2018, 5.7.1 they must be constructed as per BAL-12.5 Wall RulesNSW Enhanced RULES NSW RFS 2019 PBP, 7.5.2
Decks, Landings & Stairs must be constructed to BAL-29 requirements All elements must be Non-combustible material, or Bushfire-resisting Timber AS 3959:2018, 5.7.2 AS 3959:2018, 5.7.2.4 Windows & Glazed Doors
Frame to be of bushfire-resistant timber, allowed timber species, metal, or metal-reinforced uPVC[1] ≥ 4mm Grade A safety glass[2] Openable screens[3] Window RULES NCC 2022 V3 All Building Classes
NCC 2022 G5D1 & H7D4 [2019 G5.0, 3.10.5]
May 2023
NCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 AS 3959:2018, 5.5.3 (a) AS 3959:2018, 5.5.3 (b) AS 3959:2018, 5.5.3 (c) (i) AS 3959:2018, 5.5.3 (c) (v) AS 3959:2018, 5.5.3 (c) (iii) Building elements within Bushfire-Prone Areas to be Bushfire Attack Resistant to the NCCNCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 WindowsAS 3959:2018, 5.5.3 (a) ≥ 4mm Grade A safety glass for glazing < 400mm above a deck, ground, or other ember-holding surfacesFramesAS 3959:2018, 5.5.3 (b) Frames to be metal, bushfire-resisting timber, allowed timber species, or metal-reinforced uPVC Metal reinforcement to be of aluminium, stainless steel, or corrosion-resistant steel ScreensAS 3959:2018, 5.5.3 (c) (i) Screen to openable panels Metal, bushfire-resisting timber, or allowed timber species No requirements on window if Protected by a bushfire shutter, orAS 3959:2018, 5.5.3 (c) (v) Protected by screensAS 3959:2018, 5.5.3 (c) (iii) Ember Holding Surface NCC 2022 V2 Tools™ Best Practice RememberTools™ Best Practice Embers can blow & accumulate against a vertical building element causing it to ignite Any surface including ground, deck, or roof can hold embers if < 18° slope & if > 110mm width Bushfire-resisting Timber BAL-12.5 NCC 2022 V3 All Building Classes
NCC 2022 G5D1 & H7D4 [2019 G5, 3.10.5]
May 2023
NCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 AS 3959:2018, F4 AS 3959:2018, E1 AS 3959:2018, 1.5.5 Screen RULES NCC 2022 V2 All Building Classes
NCC 2022 G5D1 & H7D4 [2019 G5, 3.10.5]
May 2023
NCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 AS 3959:2018, 3.6.1 AS 3959:2018, 5.5.3 (c) (i) AS 3959:2018, 5.5.3 (c) (iii) AS 3959:2018, 5.5.3 (c) (v) Bushfire Shutter
Non-combustible materials[1] Optional & removes window & door requirements[2] ≤ 2mm aperture gaps, slots, or screen[3] Bushfire Shutter MATERIALS NCC 2022 V2 All Building Classes
NCC 2022 G5D1 & H7D4 [2019 G5.0, 3.10.5]
May 2023
NCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 AS 3959:2018, 5.5.1 Bushfire Shutter RULES NCC 2022 V2 All Building Classes
NCC 2022 G5D1 & H7D4 [2019 G5.0, 3.10.5]
May 2023
NCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 AS 3959:2018, 3.7 AS 3959:2018, 5.5.3 AS 3959:2018, 6.5.3 AS 3959:2018, 7.5.3 AS 3959:2018, 8.5.3 AS 3959:2018, 9.5.3 Building elements within Bushfire-Prone Areas to be Bushfire Attack Resistant to the NCCNCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 OptionalAS 3959:2018, 3.7 AS 3959:2018, 5.5.3 AS 3959:2018, 6.5.3 AS 3959:2018, 7.5.3 AS 3959:2018, 8.5.3 If not installed, window & door assemblies shall comply with corresponding BAL requirements Bushfire ShutterAS 3959:2018, 9.5.3 ≥ 1 to be openable from inside to allow escapeMust cover the entire window or door assembly Able to be closed manually in case of power failure ≤ 2mm gap to wall, frame, & sill≤ 20% perforated area, uniformly distributed, with ≤ 2mm apertures Bushfire-resisting Timber BAL-12.5 NCC 2022 V3 All Building Classes
NCC 2022 G5D1 & H7D4 [2019 G5, 3.10.5]
May 2023
NCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 AS 3959:2018, F4 AS 3959:2018, E1 AS 3959:2018, 1.5.5 AS 3959:2018, 3.7 AS 3959:2018, 5.5.3 AS 3959:2018, 5.5.1 Floor & Balcony
Fully enclosing the sub-floor will provide protection[1] Non-combustible materials when unenclosed[2] Fully-enclosed Sub-floor RULES NCC 2022 V2 All Building Classes
NCC 2022 G5D1 & H7D4 [2019 G5, 3.10.5]
May 2023
NCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 AS 3959:2018, 5.3.2.1 Unenclosed Sub-floor RULES NCC 2022 V3 All Building Classes
NCC 2022 G5D1 & H7D4 [2019 G5, 3.10.5]
May 2023
NCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 AS 3959:2018, 5.3.2.2 AS 3959:2018, 5.3.2.2 AS 3959:2018, 5.2 Building elements within Bushfire-Prone Areas to be Bushfire Attack Resistant to the NCCNCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 Bearers, Joists, & Flooring < 400mm from ground to be ofAS 3959:2018, 5.3.2.2 Non-combustible material, or Bushfire-resisting timber FlooringAS 3959:2018, 5.3.2.2 Non-combustible, or Bushfire-resisting timber, or Timber, particleboard, or plywood, with underside covered by sarking or mineral wool, or AS 1530.8.1 compliant systemSub-floor spaceAS 3959:2018, 5.2 Do not store any combustible material under a building Keep free of leaf litter Wall Construction RULES NCC 2022 V1 All Building Classes
NCC 2022 G5D1 & H7D4 [2019 G5, 3.10.5]
May 2023
NCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 AS 3959:2018, 5.4.1 Building elements within Bushfire-Prone Areas to be Bushfire Attack Resistant to the NCCNCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 External WallAS 3959:2018, 5.4.1 Wall must be fully sarked Composed of any of the following Non-combustible masonry or masonry veneer wall ≥ 90mm thk timber logs with ≥ 680 kg/m³ density at 12% moisture content Leaf of clay, blockwork, stone, concrete (incl aerated), or earth ≥ 6mm fibre cementBushfire resisting timber Allowed timber species Steel sheet Bushfire-resisting Timber BAL-12.5 NCC 2022 V3 All Building Classes
NCC 2022 G5D1 & H7D4 [2019 G5, 3.10.5]
May 2023
NCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 AS 3959:2018, F4 AS 3959:2018, E1 AS 3959:2018, 1.5.5 Sub-floor Support RULES NCC 2022 V2 All Building Classes
NCC 2022 G5D1 & H7D4 [2019 G5, 3.10.5]
May 2023
NCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 AS 3959:2018, 5.2 AS 3959:2018, 5.2 Screen RULES NCC 2022 V2 All Building Classes
NCC 2022 G5D1 & H7D4 [2019 G5, 3.10.5]
May 2023
NCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 AS 3959:2018, 3.6.1 AS 3959:2018, 5.2 AS 3959:2018, 5.3.2.2 Eaves & Fascia
Roof Components[1] Gables shall follow same rules as per Fire Wall Eaves penetrations screened Joints sealed Eaves & Fascia RULES NCC 2022 V2 All Building Classes
NCC 2022 G5D1 & H7D4 [2019 G5.0, 3.10.5]
May 2023
AS 3959:2018, 5.6.6 NCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 Building elements within Bushfire-Prone Areas to be Bushfire Attack Resistant to the NCCAS 3959:2018, 5.6.6 NCC 2022 Vol 1, G5D1 Roof ComponentsNCC 2022 Vol 2, H7D4 Gables constructed as per wall requirements Fit openings for ventilation of eaves, with ember guards & protect with screens Seals to be of corrosion-resistant aluminium, bronze, or steel Seal joints with timber storm moulds or plastic joining strips Screen RULES NCC 2022 V2 All Building Classes
NCC 2022 G5D1 & H7D4 [2019 G5, 3.10.5]
May 2023
NCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 AS 3959:2018, 3.6.1 AS 3959:2018, 5.6.6 Roof ComponentsAS 3959:2018, 5.6.6 Gables shall follow same rules as per Fire Wall Eaves penetrations screened Joints sealed Verandah or Awning Roof
Relation to main roof[1] If part of main roof space, requirements as per main roof If separated, non-combustible cover Ancillary Roofing RULES NCC 2022 V2 All Building Classes
NCC 2022 G5D1 & H7D4 [2019 G5.0, 3.10.5]
May 2023
AS 3959:2018, 5.6.4 NCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 Building elements within Bushfire-Prone Areas to be Bushfire Attack Resistant to the NCCAS 3959:2018, 5.6.4 NCC 2022 Vol 1, G5D1 Carport, Overhead Awning, & Verandah RoofsNCC 2022 Vol 2, H7D4 If part of main roof, shall follow main roof requirements If separated from main roof, a non-combustible cover shall be used & shall follow wall requirements Post RULES NCC 2022 V2 All Building Classes
NCC 2022 G5D1 & H7D4 [2019 G5.0, 3.10.5]
May 2023
NCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 AS 3959:2018, 5.7.5 Building elements within Bushfire-Prone Areas to be Bushfire Attack Resistant to the NCC NCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 Verandah Posts may be ofAS 3959:2018, 5.7.5 Timber installed on galvanised mounting shoes or stirrups With a clearance ≥ 75mm above the surrounding ground level, or If < 400mm above deck or ground level, must be of either Non-combustible material, or Bushfire-resisting timber, or Allowed timber species Screen RULES NCC 2022 V2 All Building Classes
NCC 2022 G5D1 & H7D4 [2019 G5, 3.10.5]
May 2023
NCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 AS 3959:2018, 3.6.1 Metal Sheet Roof RULES NCC 2022 V2 All Building Classes
NCC 2022 G5D1 & H7D4 [2019 G5.0, 3.10.5]
May 2023
NCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 AS 3959:2018, 5.6.3 Building elements within Bushfire-Prone Areas to be Bushfire Attack Resistant to the NCCNCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 Sheet RoofsAS 3959:2018, 5.6.3 Fully sarked over battens Seal gaps along fascia, ridges , hips, & wall lines by any of the following Mesh or perforated screen Mineral wool Non-combustible material Tiled Roof RULES NCC 2022 V2 All Building Classes
NCC 2022 G5D1 & H7D4 [2019 G5, 3.10.5]
May 2023
NCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 AS 3959:2018, 5.6.2 Building elements within Bushfire-Prone Areas to be Bushfire Attack Resistant to the NCCNCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 Tiled RoofsAS 3959:2018, 5.6.2 Cover roof framing is completely with sarking, battens may be installed on top of it Apply sarking over the hips and ridges, ensuring it continues into the gutters and valleys AS 3959:2018, 5.6.4 Relation to main roofAS 3959:2018, 5.6.4 If part of main roof space, requirements as per main roof If separated, non-combustible cover Services
Metal plumbing externally[1] Electrical underground[2] Utility Service RULES NCC 2022 V2 All Building Classes
NCC 2022 G5D1 & H7D4 [2019 G5.0, 3.10.5]
May 2023
NCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 AS 3959:2018, 5.8 AS 3959:2018, 5.8 AS/NZS 3000:2018, 3.11 AS/NZS 1596:2014, 4.4.12 AS/NZS 3000:2018, 3.11 AS 3959:2018, 5.8 Fire-stopping Penetrations
Attached Structure
Same fire resisting construction, or[1] Main building protected by[2] -/60/60 FRL wall-/60/30 FRL self-closing fire door-/60/- FRL permanently closed windowAttached Structure RULES NCC 2022 V1 All Building Classes
NCC 2022 G5D1 & H7D4 [2019 G5.0, 3.10.5]
May 2023
NCC 2022 Vol 1, G5D1 NCC 2022 Vol 2, H7D4 AS 3959:2018, 3.2.1 (a) AS 3959:2018, 3.2.1 AS 3959:2018, 3.2.2 AS 3959:2018, 3.2.1 AS 3959:2018, 3.2.1 (a) Redirecting... (5)
Please wait while we redirect you to the correct page.