- Optimise cladding construction compliance with Tools™ : Rules for weatherboard and sheet cladding, profiled and splayed timber, flashing and more.


Cavity

Closer

Head

Flashing

Storm Mould

Soffit Trimmer

Corner

Flashing

Sill Flashing

Tools™ Best Practice

150Tools™ Best Practice

Cladding

Framing Overview

Tools™ Best Practice

100Tools™ Best Practice

Trim

Under-Sill

Flashing

Fully

Sarked

Top Plate

Masonry

NCC 2022 HP, 7.5.6 (d)

WNCC 2022 HP, 7.5.6 (d)

Overlap

Tools™ Best Practice

≥ 75Tools™ Best Practice

NCC 2022 HP, 7.5.6 (d)

HNCC 2022 HP, 7.5.6 (d)

Jamb Flashing

Fully Sarked

Cavity to help prevent

condensation

NCC 2022 HP, 7.5.6 (a) (i)

≥ 110NCC 2022 HP, 7.5.6 (a) (i)

Tools™ Best Practice

10Tools™ Best Practice

Overlap

NCC 2022 HP, 7.5.2 (3) (c) (i) (A)

≥150NCC 2022 HP, 7.5.2 (3) (c) (i) (A)

Masonry Veneer

Junction with Masonry


  • Allow for movement
  • Close off junction to protect from weather or pest entry


Masonry JUNCTION


NCC 2022 V1


  • Junction of Masonry to the following
  • ≥ 65mm flashing angle to depth to suit to close off Cavity
  • ≥ 30mm cladding tucked behind masonry
  • Cladding installed prior to masonry
  • Sealant to ends of cladding over bond breaker tape
  • Optional trim to close off the junction
  • Allow for movement
  • Close off junction to protect from weather or pest entry

Eaves Lining


  • 4.5mm or 6mm FC board[1]
  • Trimmer spacing determined by wind class & manufacturer recommendations[2]


Eaves & Soffit FIXINGS


NCC 2022 V3


All Building Classes


NCC 2022 7.5.3 [2019 3.5.4.3]


May 2023



NCC 2022 HP, 7.5.5 (b) (ii)

NCC 2022 HP, 7.5.5 (b) (i)

NCC 2022 HP, 7.5.5 (b) (ii)

NCC 2022 HP, 7.5.5 (b) (iii)

NCC 2022 HP, 7.5.5 (b)

NCC 2022 HP, 7.5.5

Sheet Cladding


  • 6mm Fibre-cement[1]
  • 9.5mm Hardboard[2]
  • ≥ 6.5mm Structural Plywood[3]


Sheet Cladding INSTALLATION


NCC 2022 V4


All Building Classes


NCC 2022 7.5.4 [2019 3.5.4.4]


May 2023



NCC 2022 HP, 7.5.4 (1)

NCC 2022 HP, 7.5.4 (2)

NCC 2022 HP, 7.5.4 (3)

  • Fibre cementNCC 2022 HP, 7.5.4 (1)
  • 6mm sheet with fixing centers as per table below
  • 2.8mm nails
  • ≥ 50mm fixings distance from corners edge
  • ≥ 30mm fasteners penetration into a timber frame
  • HardboardNCC 2022 HP, 7.5.4 (2)
  • 9.5mm sheet with fixing centers as per table below
  • 2.8mm galvanised clouts or flat head nails
  • ≥ 12mm fixings distance from sheet edges
  • ≥ 50mm fixings distance from corners edge
  • ≥ 30mm fasteners penetration into a timber frame
  • Structural plywoodNCC 2022 HP, 7.5.4 (3) 
  • ≥ 6.5mm sheet with fixing centers as per table below
  • 2.8mm or 3.5mm galvanised clouts or flat head nails
  • ≥ 12mm fixings distance from sheet edges
  • ≥ 50mm fixings distance from corners edge
  • ≥ 30mm fasteners penetration into a timber frame

NCC 2022 HP, 7.5.4 (1) (b)

NCC 2022 HP, 7.5.4 (2) (b)

NCC 2022 HP, 7.5.4 (3) (b)

Weatherboard Cladding


  • ≥ 7.5mm fibre cement[1]
  • ≥ 9.5mm hardboard[2]


Weatherboard Cladding INSTALLATION


NCC 2022 V4


All Building Classes


NCC 2022 7.5.3 [2019 3.5.4.3]


May 2023



NCC 2022 HP, 7.5.3 (a)

NCC 2022 HP, 7.5.3 (b)

NCC 2022 HP, 7.5.3 (d) (i)

NCC 2022 HP, 7.5.3 (d) (ii)

NCC 2022 HP, 7.5.3 (c) (i)

NCC 2022 HP, 7.5.3 (c) (ii)

NCC 2022 HP, 7.5.3 (c)

NCC 2022 HP, 7.5.3 (c)

NCC 2022 HP, 7.5.3 (c) (iii)

NCC 2022 HP, 7.5.3 (c) (iv)

NCC 2022 HP, 7.5.3

NCC 2022 HP, 7.5.3 (a)

NCC 2022 HP, 7.5.3 (b)

Head Flashing


  • ≥ 110mm extension beyond reveal[1]
  • Tuck under Sarking & over Jamb Flashing[2]


BEST PRACTICE


NCC 2022 V1


Head Flashing RULES


NCC 2022 V1


All Building Classes


NCC 2022 7.5.6 [2019 3.5.4.6]


May 2023



NCC 2022 HP, 7.5.6 (d)

NCC 2022 HP, 7.5.6 (a) (i)

NCC 2022 HP, 7.5.6 (b) (i)

NCC 2022 HP, 7.5.6 (b) (ii)

NCC 2022 HP, 7.5.6 (b) (iii)

NCC 2022 HP, 7.5.6 (e)

NCC 2022 HP, 7.5.6 (a) (i)

NCC 2022 HP, 7.5.6 (e)

Finished Ground


  • ≥ 100mm to well-drained areas[1]
  • ≥ 50mm to impermeable areas[2]
  • ≥ 150mm to any other areas[3]
  • ≥ 50mm extension below the bearer[4]


Cladding to Ground CLEARANCE


NCC 2022 V2


All Building Classes


NCC 2022 7.5.7 [2019 3.5.4.7]


May 2023



NCC 2022 HP, 7.5.7 (1)

NCC 2022 HP, 7.5.7 (2)

  • ClearanceNCC 2022 HP, 7.5.7 (1)
  • ≥ 100mm in well-drained areas
  • Low rainfall intensity areas or sandy
  • ≥ 50mm above impermeable areas that slope away from the building
  • ≥ 150mm in any other case
  • ExtensionNCC 2022 HP, 7.5.7 (2)
  • ≥ 50mm wall cladding extension below the bearer or lowest horizontal part of the suspended floor framing

NCC 2022 HP, 7.5.7 (1) (a)

NCC 2022 HP, 7.5.7 (1) (c)

NCC 2022 HP, 7.5.7 (1) (b)

NCC 2022 HP, 7.5.7 (2)

Splayed Timber


  • Overlaps
  • ≥ 30mm for hardwood, Cypress & treated pine[1]
  • ≥ 20mm for Western Red Cedar[2]
  • ≥ 25mm for Baltic Pine[3]
  • 1 fixing at each stud[4]


Splayed Timber INSTALLATION


NCC 2022 V2


All Building Classes


NCC 2022 7.5.2 [2019 3.5.4.2]


May 2023



NCC 2022 HP, 7.5.2 (2) (a)

NCC 2022 HP, 7.5.2 (2) (b)

NCC 2022 HP, 7.5.2 (2) (c)

NCC 2022 HP, 7.5.2 (4) (a)

Timber Cladding FIXINGS


NCC 2022 V1


All Building Classes


NCC 2022 7.5.2 [2019 3.5.4.2]


May 2023



NCC 2022 HP, 7.5.2 (5) (c)

NCC 2022 HP, 7.5.2 (5) (a)

NCC 2022 HP, 7.5.2 (5) (b)

NCC 2022 HP, 7.5.2 (5) (d)

NCC 2022 HP, 7.5.2 (4) (d)

  • Should not penetrate the board beneathNCC 2022 HP, 7.5.2 (5) (c)
  • When fixings are punched or countersunk & filled prior to paintingNCC 2022 HP, 7.5.2 (5) (a)
  • Standard steel flat head nails or
  • Standard steel self-embedding head screws
  • Western red cedar timber requires suitable fixingsNCC 2022 HP, 7.5.2 (5) (b)
  • Silicon bronze, monel metal, stainless steel or hot-dipped galvanised
  • With a building located at ≤ 200m from a breaking surfNCC 2022 HP, 7.5.2 (5) (d)
  • Stainless steel fixings for timber frames, or
  • Hot-dipped galvanized fixings ≥ 600g/m2 for steel frames
  • In all other cases, hot-dipped galvanised fixingsNCC 2022 HP, 7.5.2 (4) (d)
  • Flat head nails ≥ 600g/m2
  • Self-embedding head or wafer head screws ≥ 600g/m2

NCC 2022 HP, 7.5.2 (2) (a)

NCC 2022 HP, 7.5.2 (2) (b)

NCC 2022 HP, 7.5.2 (2) (c)

NCC 2022 HP, 7.5.2 (4) (a)

Window Flashing


  • ≥ 150mm extension beyond reveal[1]
  • Sill flashing tucks under Jamb Flashing[2]


Window FLASHING


NCC 2022 V2


All Building Classes


NCC 2022 7.5.6 [2019 3.5.4.6]


May 2023



NCC 2022 HP, 7.5.6 (b)

NCC 2022 HP, 7.5.6 (e)

NCC 2022 HP, 7.5.6 (a) (iii)

NCC 2022 HP, 7.5.6 (a) (iii)

NCC 2022 HP, 7.5.6 (e)

Industry Recommendation

NCC 2022 HP, 7.5.6 (a) (i)

NCC 2022 HP, 7.5.6 (e)

Profiled Timber


  • Horizontal, vertical, or diagonal fixings[1]
  • Overlap & groove closely fitted[2]
  • 1 fixing at each stud for boards ≤ 130mm wide[3]
  • 2 fixing at each stud for boards > 130mm wide[4]


Profiled Timber INSTALLATION


NCC 2022 V3


All Building Classes


NCC 2022 7.5.2 [2019, 3.5.4.2]


May 2023



NCC 2022 HP, 7.5.2 (3)

NCC 2022 HP, 7.5.2 (3) (c) (i)

NCC 2022 HP, 7.5.2 (3) (c) (i) (A)

NCC 2022 HP, 7.5.2 (4) (b)

NCC 2022 HP, 7.5.2 (4) (c)

Timber Cladding FIXINGS


NCC 2022 V1


All Building Classes


NCC 2022 7.5.2 [2019 3.5.4.2]


May 2023



NCC 2022 HP, 7.5.2 (5) (c)

NCC 2022 HP, 7.5.2 (5) (a)

NCC 2022 HP, 7.5.2 (5) (b)

NCC 2022 HP, 7.5.2 (5) (d)

NCC 2022 HP, 7.5.2 (4) (d)

  • Should not penetrate the board beneathNCC 2022 HP, 7.5.2 (5) (c)
  • When fixings are punched or countersunk & filled prior to paintingNCC 2022 HP, 7.5.2 (5) (a)
  • Standard steel flat head nails or
  • Standard steel self-embedding head screws
  • Western red cedar timber requires suitable fixingsNCC 2022 HP, 7.5.2 (5) (b)
  • Silicon bronze, monel metal, stainless steel or hot-dipped galvanised
  • With a building located at ≤ 200m from a breaking surfNCC 2022 HP, 7.5.2 (5) (d)
  • Stainless steel fixings for timber frames, or
  • Hot-dipped galvanized fixings ≥ 600g/m2 for steel frames
  • In all other cases, hot-dipped galvanised fixingsNCC 2022 HP, 7.5.2 (4) (d)
  • Flat head nails ≥ 600g/m2
  • Self-embedding head or wafer head screws ≥ 600g/m2

NCC 2022 HP, 7.5.3 (c) (i)

NCC 2022 HP, 7.5.3 (c) (ii)

NCC 2022 HP, 7.5.2 (3) (a)

NCC 2022 HP, 7.5.2 (3) (a)

Bushfire Construction

Redirecting... (5)
Please wait while we redirect you to the correct page.