Roofing (Glass) Building Codes & Rules


- Glass Roofing: Tools™ simplifies the National Construction Code (NCC) with interactive graphics, including deemed to comply & best practices.


Thermal Setting Block

Reglet Flashing

Flashing into Gutter

AS 1288:2021, 6.4.2 (b)

Fall

Insulation

  • ≥ 15° recommended to facilitate cleaning

Apron Flashing seal & fix to Glass Roof System

Fall

Glass

  • UV or film as specified
  • Laminated preferred
  • Arrised edges at exposed Eaves to limit hazards

Drip Edge

Structural support

Sarking

AS 1288:2021, 6.4.2

≥ 3°AS 1288:2021, 6.4.2

≥ 15°

Fall

Purlin

HB 39:2015, 8.1.4

≥ 50HB 39:2015, 8.1.4

≥ 50

HB 39:2015, 8.4

≥ 50HB 39:2015, 8.4

HB 39:2015, 8.1.4

≥ 50HB 39:2015, 8.1.4

Maintenance


  • Check base components every[1]
  • 12 months clean debris, wash coating
  • Access for maintenance to have Safety Label & not located at trafficable areas


Rooflight MAINTENANCE


NCC 2022 V1


All Building Classes


NCC 2022 S5C16, J4D5, J5D4, HP13.2.4, & HP13.4.3

[2019 Spec C1.1:3.6, J1.4, J3.3, 3.12.1.3, 3.12.3.2]


May 2023



AS 4285:2019, F

  • Rooflights to be energy-efficient, fire-resistant, sealed or capable of being sealed, and constructed to the NCC
  • Ensure Rooflight integrity through upkeep for safe & proper useAS 4285:2019, F
  • Do not use window cleaning fluid on polymers
  • Use scratch-proof cleaning materials
  • Clean glass / polymers with mild or natural detergent
  • Use warm water & rinse well
  • Base Components
  • Inspect periodically
  • Remove leaf & rubbish build-up
  • Glazing, Timber, & Mechanical Accessories
  • Check every 12 months
  • Lubricate mechanical parts

AS 4285:2019, F

  • Check base components everyAS 4285:2019, F
  • 12 months clean debris, wash coating
  • Access for maintenance to have Safety Label & not located at trafficable areas

Roof Sheeting


  • Weather Fold Ends
  • End of Ribs sealed & fastened, or[1][2][3]
  • End capped
  • Profiled Foam Filler Strip
  • Anti-capillary cut if required[4]


Roof Sheeting RULES


NCC 2022 V2


All Building Classes


NCC 2022 F3, H2D6, J4D4, & HP7 [2019 3.5.1-3.5.5, J1.3, 3.5]


May 2023



  • Roofing detailed and built to the NCC
  • Refer to detail below for roof ≤ 5°

HB 39:2015, 5.5 (d)

HB 39:2015, 8.6.2 (d)

HB 39:2015, 7.13

HB 39:2015, 7.14

Energy Efficiency


  • Required to be weatherproof & sealed[1]
  • Installed with ceiling diffusers[2]
  • Has a shutter system[3]


Thermal Performance (for NSW)


NCC 2022 V3


All Building Classes


NCC 2022 S5C16, J4D5, J5D4, HP13.2.4, & HP13.4.3

[2019 Spec C1.1:3.6, J1.4, J3.3, 3.12.1.3, 3.12.3.2]


May 2023



NSW 2023 BASIX, Energy

  • Rooflights to be energy-efficient, fire-resistant, sealed or capable of being sealed, and constructed to the NCC
  • DIY MethodNSW 2023 BASIX, Energy
  • ≤ 300m² conditioned floor area
  • Glazing to be 10 to 40% of conditioned floor area
  • ≤ 3m² cumulative area of Rooflights & Roof Windows
  • 1 to 2 storeys high for single dwellings
  • ≤ 25m² Open Mezzanine

Roof Light Building Sealing Energy Efficiency


NCC 2022 V1


Class 1 & 10a


NCC 2022 HP13.2.4 & 13.4.3 [2019: 3.12.1.3 & 3.12.3.2]


May 2023



NCC 2022 HP, 13.2.4 (a)

NCC 2022 HP, 13.2.4 (b) (ii)

NCC 2022 HP, 13.2.4 (b) (i)

NCC 2022 HP, 13.4.3 (1)

NCC 2022 HP, 13.4.3 (2) (a)

NCC 2022 HP, 13.4.3 (2) (c)

Overhead Glazing


  • Thermally broken frame[1]


Sloped Overhead Glazing RULES


NCC 2022 V1


All Building Classes


NCC 2022 F6D3, B1F2, S5C16, J4D5, J5D4, HP13.2.4, & HP13.4.3

[2019 F4.2, BF1.2 Spec C1.1:3.6, J1.4, J3.3, 3.12.1.3, 3.12.3.2]


May 2023



AS 1288:2021, 6.3 (b)

AS 1288:2021, 6.3 (a)

AS 1288:2021, 6.3 (a)

  • Rooflights to be energy-efficient, fire-resistant, sealed or capable of being sealed, and constructed to the NCC
  • Grade A Laminated Safety Glass
  • Grade A Toughened Safety Glass
  • ≤ 500mmAS 1288:2021, 6.3 (b) wide, if Glazing 3mAS 1288:2021, 6.3 (a) above finished floor
  • For outer pane of IGU, if ≥ 3mAS 1288:2021, 6.3 (a) above finished floor
  • Inner pane to be Laminated Glass

AS 1288:2021, 6.3

Bushfire Construction


  • Seal openings including gaps & vents[1]


Roof Penetration Bushfire CONSTRUCTION


NCC 2022 V1


All Building Classes


NCC 2022 G5 & H7D4 [2019 Part G5 & 3.10.5]


May 2023



  • Buildings located in Bushfire Prone Areas to address bushfire attack risks and be constructed to the NCC

NCC 2022 Vol 1, G5O1 (b)

Redirecting... (5)
Please wait while we redirect you to the correct page.