Valley (Gutters) Building Codes & Rules


- Learn the best practices for installing valley gutters to prevent common mistakes and ensure long-lasting roof performance.


4th rib if corrugated

Tools™ Best Practice

NotchingTools™ Best Practice

  • ≤ 3mm gap
  • Tight to rib

NCC 2022 HP, 7.4.4 (4) (c)

≥ 15NCC 2022 HP, 7.4.4 (4) (c)

W

NCC 2022 HP, 7.4.4 (4) (b)

≥ 150NCC 2022 HP, 7.4.4 (4) (b)

HB 39:2015, 5.3.2 (o)

Tools™ Best Practice

Sarking

Upturn Freeboard

D

Overhang

Blanket Insulation

Sarking

Purlins

Purlins

Roof Structure

NCC 2022 HP, 7.4.4 (4) (a)

≥ 12.5°NCC 2022 HP, 7.4.4 (4) (a)

HB 39:2015, 5.3.2 (o)

≥ 25HB 39:2015, 5.3.2 (o)

Overhang

- copy

Eaves Gutter

Pitch

Roof Structure

End of Valley turn down

Valley Board

Fall

HB 39:2015, 3.10

Blanket InsulationHB 39:2015, 3.10

  • Cut back insulation at fascia / sheet end
  • Profiled foam filler strip or end cap to roof sheet

HB 39:2015, 5.4 (d)

FasteningHB 39:2015, 5.4 (d)

  • Galvanised nail, or
  • fixing cleats bent down at 500mm CTS

HB 39:2015, 5.4 (f)

≥ 150HB 39:2015, 5.4 (f)

NCC 2022 HP, 7.4.4 (4) (b)

≥ 12.5°NCC 2022 HP, 7.4.4 (4) (b)

HB 39:2015, 8.2 (b)

≥ 300HB 39:2015, 8.2 (b)

Discharge Width

Roof Sheet

- copy - copy

Lap Joint

HB 39:2015, B4.1.3

Ridge CappingHB 39:2015, B4.1.3

  • ≥ 150mm cover > 5° roof pitch
  • ≥ 200mm cover < 5° roof pitch

Catchment Area

Tools™ Best Practice

≥ 15Tools™ Best Practice

HB 39:2015, 5.4 (e)

≥ 25HB 39:2015, 5.4 (e)

HB 39:2015, 5.4 (k)

≥ 20m2HB 39:2015, 5.4 (k)

HB 39:2015, 5.4 (h)

≥ 19HB 39:2015, 5.4 (h)

NCC 2022 HP, 7.4.4 (4) (b)

≥ 150NCC 2022 HP, 7.4.4 (4) (b)

Tools™ Best Practice

Metal Roof SheetTools™ Best Practice

  • Spans & fixings to manufacturer's profile specification
  • Profile to suit pitch & rainfall intensities
  • Install hail guard angle above all box guttering

Valley Gutter


  • Width (W) & Depth (D) designed according to intensity of rainfall[1]
  • < 12.5° Pitch must be designed as a Box Gutter[2]


Valley Gutter Dimensions


NCC 2022 V5


All Building Classes


NCC 2022, 7.4.4


May 2023



NCC 2022 Vol 1, F1D3

NCC 2022 Vol 2, H2D2

NCC 2022 HP, 3.3

NCC 2022 HP, 7.4.4 (4) (b)

HB 39:2015, 5.4 (i)

Roof Sheeting Weather Fold



Roof Sheeting RULES


NCC 2022 V4


All Building Classes


NCC 2022 F3, H2D6, J4D4, & HP7 [2019 3.5.1-3.5.5, J1.3, 3.5]


May 2023



NCC 2022 Vol 2, H2D2

NCC 2022 Vol 1, F1D2

NCC 2022 HP, 7.2

Tools™ Best Practice

Downpipe


  • Locate close to Valley Gutter[1]


Downpipe INSTALLATION


NCC 2022 V1


  • Spreader required if above lower roof
  • Allow easy removal of base for maintenance
  • Brackets
  • 2m spacing vertical
  • 1m spacing if sloped
  • Expansion
  • 6m PVC
  • Charged
  • Overflow required

Valley Gutter Catchment Area RULES


NCC 2022 V1


Class 2 to 9


NCC 2022 F1D3, H2D2, Parts 3.3.5, & 7.4

[2019 F1.1, 3.1.3.0-3.1.3.1, 3.1.3.5, 3.5.3]


May 2023



HB 39:2015, 5.4 (k)

NCC 2022 Vol 1, F1D3

NCC 2022 Vol 2, H2D2

NCC 2022 HP, 7.4.5 (b)