Bottom Fastener Fix Line (on studs)
Manufacturer's Requirement
Sheet Joint from edge of opening
Manufacturer's Requirement
Top Fastener Fix Line (on studs)
Plasterboard Overview
Manufacturer's Requirement
Manufacturer's Requirement
Joint Screw FixingManufacturer's Requirement
- Equally space screws starting from Sheet Center working outwards
- Lined-up or staggered screw fixings are both allowed
Manufacturer's Requirement
Manufacturer's Requirement
Manufacturer's Requirement
Manufacturer's Requirement
NoggingManufacturer's Requirement (if required)
- Supports & prevents twisting of studs
- Aids in satisfying Fire-resistance & Structural Requirements
Wall Lining Installation (FRL)
Manufacturer's Requirement
Manufacturer's Requirement
Manufacturer's Requirement
Manufacturer's Requirement
Manufacturer's Requirement
Manufacturer's Requirement
Manufacturer's Requirement
Manufacturer's Requirement
Manufacturer's Requirement
Manufacturer's Requirement
Manufacturer's Requirement
Manufacturer's Requirement
Manufacturer's Requirement
Manufacturer's Requirement
Manufacturer's Requirement
Manufacturer's Requirement
Manufacturer's Requirement
Manufacturer's Requirement
Manufacturer's Requirement
Manufacturer's Requirement
Manufacturer's Requirement
Manufacturer's Requirement
Control Joint
- 15 to 20mm[1] gap between studs
- Allows structural movement
Control Joint LOCATION
NCC 2022 V2
Manufacturer's Requirement
Manufacturer's Requirement
Manufacturer's Requirement
Manufacturer's Requirement

Redirecting... (5)
Please wait while we redirect you to the correct page.