NCC 2022 Vol 1, G3D2
NCC 2022 Vol 1, Glossary
Definition of an AtriumNCC 2022 Vol 1, Glossary
- ≥ 2 storeys connected within a clear building space with
- > 50% enclosure by a Roof or Floor above of the area of any Storey within
- Includes any adjacent non-fire separated areas
- Excludes shafts, stairwells, or ramp wells
NCC 2022 Vol 1, G3D3
NCC 2022 Vol 1, G3D5
NCC 2022 Vol 1, G3D2
NCC 2022 Vol 1, G3D5
NCC 2022 Vol 1, S31C7
NCC 2022 Vol 1, S31C15
NCC 2022 Vol 1, S31C19 (a)
NCC 2022 Vol 1, G3D8
Fire and Smoke Protection
NCC 2022 Vol 1, G3D7
NCC 2022 Vol 1, G3D3
Atrium SeparationNCC 2022 Vol 1, G3D3
- ≤ 3 Storeys (consecutive) allowed to have Bounding Wall setback > 3.5m if one of those Storeys has direct access to Open Space or Road
NCC 2022 Vol 1, G3D3
NCC 2022 Vol 1, S31C4
Atrium FloorNCC 2022 Vol 1, S31C4
- Protected by quick response sidewall & overhead sprinklers as required to provide full coverage
Area & Volume Measurement
- Area = all Floors measured from the internal finished face of the Bounding Construction or any external walls[1]
- Storeys with Balcony Width ≤ 3.5m to Bounding Wall excluded[2]
- Volume = total space measured from the internal finished face of the Bounding Construction or any external walls[3]
- Excludes the space within an Atrium Well above the Atrium Floor[4]
Compartmentation Area & Volume RULES
NCC 2022 V1
Class 2 to 9
NCC 2022, G3D3 & C3D3
May 2023
NCC 2022 Vol 1, C3D4
NCC 2022 Vol 1, C3D6
NCC 2022 Vol 1, C3D3
NCC 2022 Vol 1, Glossary
NCC 2022 Vol 1, Glossary
NCC 2022 Vol 1, G3D3
NCC 2022 Vol 1, C3D3 (3)
Atrium Cover
- Roof or Floor of Storey Above
- FRL as per table, or
- Sprinklered[1]
Atrium Fire Sprinkler RULES
NCC 2022 V1
Class 2 to 9
NCC 2022, S31C3, S31C4
May 2023
NCC 2022 Vol 1, S31C4
NCC 2022 Vol 1, S31C3 (2)
NCC 2022 Vol 1, S31C3 (1)
NCC 2022 Vol 1, S31C3 (1)
- Roof protected by Sprinklers if not FRL protected, butNCC 2022 Vol 1, S31C4
- Exempt from being Sprinklered if distance above the Atrium Floor or any Storey with > 3.5m Bounding Wall setback isNCC 2022 Vol 1, S31C3 (2)
- < 12m in Class 2, 3, 5 or 9 part of a building
- < 20m in Class 6, 7 or 8 part of a building
- 79 to 100°C temperature rated Roof SprinklersNCC 2022 Vol 1, S31C3 (1)
- Floor of Atrium protected by quick response sidewall & overhead sprinklers as required to provide full coverageNCC 2022 Vol 1, S31C3 (1)
Atrium Roof FRL RULES
NCC 2022 V1
Class 2 to 9
NCC 2022, G3D6
May 2023
NCC 2022 Vol 1, G3D6 (a)
NCC 2022 Vol 1, G3D6 (b)
NCC 2022 Vol 1, S31C3 (1)
NCC 2022 Vol 1, G3D4 (a)
NCC 2022 Vol 1, G3D4 (a) (ii)
NCC 2022 Vol 1, G3D4 (b)
Bounding Walls
- ≥ 60/60/60 FRL WallNCC 2022 Vol 1, G3D4 (a)
- Unless higher requirement due to Type of Construction
- From Floor to underside of Roof or Floor above
- -/60/30 FRL Automatic or Self-closing Fire DoorsNCC 2022 Vol 1, G3D4 (a) (ii)
- Fixed Safety Glass or Wired Safety GlassNCC 2022 Vol 1, G3D4 (b)
- Automatic or Self-closing Smoke Doors
- ≥ -/60/30 FRL Wall in ceiling space
- Wall Wetting Sprinklers to NCC 2022 Specification 31
Type A Construction
Compartmentation & Separation

Redirecting... (5)
Please wait while we redirect you to the correct page.