Timber Frame Metal Roof BAL-FZ Building Codes & Rules


- Comply with Bushfire Construction Requirements with Tools™: BAL-FZ requirements, fire danger insights, & detailed guidance for walls, roof, guttering & more!


AS 3959:2018, H3 (a)

≥ 300AS 3959:2018, H3 (a)

AS 3959:2018, H3 (j) (iii)

Framing AngleAS 3959:2018, H3 (j) (iii)

  • ≥ 35 x 35 x 0.70mm BMT
  • ≥ 600mm Fixing centres

AS 3959:2018, H3 (a)

≥ 10AS 3959:2018, H3 (a)

FR Sealant

Timber

FR Plasterboard

Fibre-cement

FR Plasterboard

Joint Strip

BAL-FZ Certified

Eave Vents

Cover Angle

Plywood

Roof Framing

Plywood

Plywood

Fully Sarked

Fire Resistant Sealant

AS 3959:2018, H3 (f)

Cover AngleAS 3959:2018, H3 (f)

  • ≥ 35 x 35 x 0.55mm BMT
  • ≥ 600mm Fixing centres

Sarking

Glasswool Insulation

Industry Recommendation

AS 3959:2018, H3 (d)

Roof Fixings to Roof EdgesIndustry Recommendation

  • Fascias, Bargeboards, Hips & Valleys
  • Every Corrugation
  • Optionally alternate fixings through Batten & Z FlashingAS 3959:2018, H3 (d)

AS 3959:2018, H3 (d)

Fixing intervals at every 2nd CorrugationAS 3959:2018, H3 (d)

AS 3959:2018, H3 (e)

InsulationAS 3959:2018, H3 (e)

  • Compress Oversized Mineral Wool Strips between Sheet Ends & under Ridge Cap
  • ≥ 115mm thk
  • ≥ 110mm (W)

AS 3959:2018, 9.6.1 (c)

Roof Mounted Evaporative Coolers

AS 3959:2018, H3 (c)

≥ R 1.8AS 3959:2018, H3 (c)

AS 3959:2018, 9.6.3 (a)

Flammability Index ≤ 5AS 3959:2018, 9.6.3 (a)

Tools™ Best Practice

Wider Gutter profile for easier cleaningTools™ Best Practice

AS 3959:2018, H3 (h)

FR SealantAS 3959:2018, H3 (h)

AS 3959:2018, H3 (j) (iii)

Framing AngleAS 3959:2018, H3 (j) (iii)

  • ≥ 35 x 35 x 0.70mm BMT
  • ≥ 600mm Fixing centres

Tools™ Best Practice

ExhaustTools™ Best Practice

  • Cooking & Bathroom exhausts to Duct externally through Wall or Eaves to minimise condensation

AS 3959:2018, H3 (d)

Fixings to every

2nd CorrugationAS 3959:2018, H3 (d)

Plywood


  • ≥ 15mm T&G Plywood[1]
  • Face Veneer perpendicular to Roof Structure


Plywood Membrane RULES


NCC 2022 V1


All Building Classes


NCC 2022 G5, H7D4, & S1

[2019 G5, 3.10.5, Sch 5]


May 2023



NCC 2022 Vol 1, G5

NCC 2022 Vol 2, H7D4

AS 3959:2018, H3 (a)

  • Building elements within Bushfire-prone Areas to be Bushfire Attack Resistant to the NCCNCC 2022 Vol 1, G5NCC 2022 Vol 2, H7D4
  • ≥ 15mm T&G Plywood Membrane continuously fixed over Timber or Steel Roof Structure atAS 3959:2018, H3 (a)
  • ≥ 150mm CTS at the Panel End, &
  • ≥ 300mm CTS at Trusses & Intermediate Rafter
  • ≥ 10mm from Panel Edge
  • Face Veneer perpendicular to Roof Structure

AS 3959:2018, H3 (a)

Roofing Durability

AS 3959:2018, H3 (e)

Industry Recommendation

InsulationAS 3959:2018, H3 (e)

  • Compressed Mineral Wool Strips
  • ≥ 115mm thk
  • ≥ 110mm (W)
  • Thickness may need to be reduced to be able to physically compress the Insulation under Roof Sheeting. Confirm acceptance with Certifying Authority prior to installationIndustry Recommendation

Wall & Floor BAL-FZ

AS 3959:2018, H3 (a)

≥ 150AS 3959:2018, H3 (a)

Z Flashing

AS 3959:2018, H3 (e)

≥ 110AS 3959:2018, H3 (e)

AS 3959:2018, H3 (g)

Z FlashingAS 3959:2018, H3 (g)

  • 40 x 40 x 40 x 0.55mm BMT
  • ≥ 600mm Fixing centres along Eaves & into Plywood

Ridge Capping

Ventilation


  • Screen all vents & outlets[1]
  • High level ventilation at Gable Ends preferred [2]


Ventilation RULES


NCC 2022 V3


All Building Classes


NCC 2022 G5, H7D4, & S1

[2019 G5, 3.10.5, Sch 5]


May 2023



AS 3959:2018, 3.6.1

NCC 2022 Vol 1, G5

NCC 2022 Vol 2, H7D4

AS 3959:2018, 9.6.1

AS 3959:2018, 3.6.1

AS 3959:2018, 9.6.1 (b)

Roof Sheet


  • 0.42 to 0.6mm BMT[1]
  • Junctions fully sealed[2]
  • Non-combustible penetration sealed with Mineral Fibre[3]


Sheet Roof MATERIALS


NCC 2022 V4


All Building Classes


NCC 2022 G5, H7D4, & S1

[2019 G5, 3.10.5, Sch 5]


May 2023



AS 3959:2018, H3 (d)

NCC 2022 Vol 1, G5

NCC 2022 Vol 2, H7D4

  • Building elements within Bushfire-prone Areas to be Bushfire Attack Resistant to the NCCAS 3959:2018, H3 (d)NCC 2022 Vol 1, G5
  • 0.42 to 0.6mm BMTNCC 2022 Vol 2, H7D4
  • Hex Head Screw (Self-drilling) Fixing with EPDM seal & Shank Guard
  • On Battens, intervals at two corrugations
  • On Roof Edge, on all corrugations

Roofing RULES


NCC 2022 V4


All Building Classes


NCC 2022 G5, H7D4, & S1

[2019 G5, 3.10.5, Sch 5]


May 2023



AS 3959:2018, 3.6.1

AS 3959:2018, 9.6.1 (a)

AS 3959:2018, 9.6.1 (b)

NCC 2022 Vol 1, G5

NCC 2022 Vol 2, H7D4

  • Building elements within Bushfire-prone Areas to be Bushfire Attack Resistant to the NCCAS 3959:2018, 3.6.1AS 3959:2018, 9.6.1 (a)
  • Screen all gapsAS 3959:2018, 9.6.1 (b), & the Roof to Wall & Roof to Roof junction be sealed byNCC 2022 Vol 1, G5
  • Fascia & Eaves lining, or
  • Sealed on the junction between the top of the Wall & the Roof underside also between Rafters at the Wall line
  • Ventilation OpeningsNCC 2022 Vol 2, H7D4
  • Fitted with non-combustible Ember Guards, or
  • Protected by corrosion-resistant Mesh or Perforated Sheet

Penetration RULES


NCC 2022 V3


All Building Classes


NCC 2022 G5, H7D4, & S1

[2019 G5, 3.10.5, Sch 5]


May 2023



AS 3959:2018, 9.6.5

NCC 2022 Vol 1, G5

NCC 2022 Vol 2, H7D4

  • Building elements within Bushfire-prone Areas to be Bushfire Attack Resistant to the NCCAS 3959:2018, 9.6.5NCC 2022 Vol 1, G5
  • Seal openings with Fireproof Mineral Fiber, maintaining full function of penetrated elementsNCC 2022 Vol 2, H7D4
  • Use only non-combustible materials
  • Rooflights, Ventilators & Pipes or Conduit to be AS 1530.8.2 compliant

AS 3959:2018, H3 (d)

AS 2419.1:2005, H3 (d)

AS 3959:2018, 9.6.5 (a)

Insulation


  • ≥ 75mm Glasswool Blanket[1]
  • Foil face down


Glasswool Insulation RULES


NCC 2022 V3


All Building Classes


NCC 2022 G5, H7D4, & S1

[2019 G5, 3.10.5, Sch 5]


May 2023



AS 3959:2018, H3 (c)

NCC 2022 Vol 1, G5

NCC 2022 Vol 2, H7D4

  • Building elements within Bushfire-prone Areas to be Bushfire Attack Resistant to the NCCAS 3959:2018, H3 (c)NCC 2022 Vol 1, G5
  • Use Glasswool Blanket that strictly adhere to the followingNCC 2022 Vol 2, H7D4
  • ≥ 75mm thk BAL-FZ Certified compressed Glasswool blanket with
  • Reflective Foil facing downwards fills the entire space between the Plywood Membrane & Sheet Roof
  • ≥ 11kg/m³ Density
  • ≥ R 1.8 R-value

AS 3959:2018, H3 (c)

Gutter


  • Non-combustible materials[1]


Gutter & Downpipes RULES


NCC 2022 V6


All Building Classes


NCC 2022 G5, H7D4, & S1

[2019 G5, 3.10.5, Sch 5]


May 2023



AS 3959:2018, 9.6.7

NCC 2022 Vol 1, G5

NCC 2022 Vol 2, H7D4

  • Building elements within Bushfire-prone Areas to be Bushfire Attack Resistant to the NCCAS 3959:2018, 9.6.7NCC 2022 Vol 1, G5
  • Gutter & Downpipe installationNCC 2022 Vol 2, H7D4
  • Downpipe requirement not covered
  • Non-combustible Gutter, Box Gutter & Valley Leaf Guards
  • Box Gutter flashed at Roof junction with non-combustible materials

AS 3959:2018, 9.6.7

Battens


  • Timber or Steel Top Hat Battens with fixings as required by site location tie-down[1]


Battens RULES


NCC 2022 V3


All Building Classes


NCC 2022 G5, H7D4, & S1

[2019 G5, 3.10.5, Sch 5]


May 2023



AS 3959:2018, H3 (b)

NCC 2022 Vol 1, G5

NCC 2022 Vol 2, H7D4

  • Building elements within Bushfire-prone Areas to be Bushfire Attack Resistant to the NCCAS 3959:2018, H3 (b)NCC 2022 Vol 1, G5
  • Install Battens as mandated by the site location's tie-down requirementsNCC 2022 Vol 2, H7D4
  • Timber Batten
  • ≤ 45 x 90mm securely fastened to Plywood, adhering to AS 1684, or
  • Steel Top Hat Battens
  • 40mm (H) & 0.55mm thk securely fastened to Plywood to Roof Framing

AS 3959:2018, H3 (b)

  • Timber or Steel Top Hat Battens with fixings as required by site location tie-downAS 3959:2018, H3 (b)

Fascias


  • Construction of Fascia[1]
  • System to AS 1530.8.2
  • ≥ 15mm Plywood
  • ≥ 16mm Fire Rated Plasterboard
  • Timber Fascia


Fascias MATERIALS


NCC 2022 V4


All Building Classes


NCC 2022 G5, H7D4, & S1

[2019 G5, 3.10.5, Sch 5]


May 2023



AS 3959:2018, H3 (i) (i)

AS 3959:2018, H3 (i) (ii)

NCC 2022 Vol 1, G5

NCC 2022 Vol 2, H7D4

  • Building elements within Bushfire-prone Areas to be Bushfire Attack Resistant to the NCCAS 3959:2018, H3 (i) (i)AS 3959:2018, H3 (i) (ii)
  • Construct the Fascia using materials that strictly adhere to the followingNCC 2022 Vol 1, G5
  • ≥ 15mm Plywood Membrane installed on top of Timber, or Steel Truss Framing
  • ≥ 16mm Water & Fire-resistant Plasterboard fixed into Plywood with
  • 38mm x 6g Screws @ 150mm CTS per AS/NZS 2588
  • 6 to 10mm Joint spacing to fill with Fire-resistant Sealant
  • Stagger Plywood joints when creating Butt Joints in the Plasterboard
  • Timber Fascia fixed on Roof structure per AS 1684NCC 2022 Vol 2, H7D4

AS 3959:2018, H3 (i)

  • Construction of FasciaAS 3959:2018, H3 (i)
  • System to AS 1530.8.2
  • ≥ 15mm Plywood
  • ≥ 16mm Fire Rated Plasterboard
  • Timber Fascia

Eaves


  • -/30/30 FRL or system to AS 1580.8.2[1]
  • Construction Materials[2]
  • ≥ 15mm Plywood
  • ≥ 16mm Fire Rated Plasterboard
  • ≥ 4.5mm Fibre-cement Eave lining


Eaves RULES


NCC 2022 V2


All Building Classes


NCC 2022 G5, H7D4, & S1

[2019 G5, 3.10.5, Sch 5]


May 2023



NCC 2022 Vol 1, G5

NCC 2022 Vol 2, H7D4

AS 3959:2018, 9.6.6

  • Building elements within Bushfire-prone Areas to be Bushfire Attack Resistant to the NCCNCC 2022 Vol 1, G5NCC 2022 Vol 2, H7D4
  • Eaves Lining InstallationAS 3959:2018, 9.6.6
  • -/30/30 FRL or system to AS 1580.8.2
  • Penetrations protected with a non-combustible material
  • Ventilation openings fitted with Ember Guards
  • Seal the Joints using either Plastic Joining Strips or Timber Storm Moulds

Eaves RULES


NCC 2022 V4


All Building Classes


NCC 2022 G5, H7D4, & S1

[2019 G5, 3.10.5, Sch 5]


May 2023



AS 3959:2018, 9.6.6 (c) (i)

AS 3959:2018, 9.6.6 (d)

AS 3959:2018, 9.6.6 (e)

AS 3959:2018, 9.6.6 (f)

Eaves MATERIALS


NCC 2022 V4


All Building Classes


NCC 2022 G5, H7D4, & S1

[2019 G5, 3.10.5, Sch 5]


May 2023



AS 3959:2018, H3 (j) (i)

AS 3959:2018, H3 (j) (ii)

  • Building elements within Bushfire-prone Areas to be Bushfire Attack Resistant to NCC Specification 1, NCC Part G5, & AS 3959
  • ≥ 15mm Plywood installed on top of Timber, or Steel Truss Framing
  • ≥ 16mm Water & Fire-resistant Plasterboard fixed into Plywood withAS 3959:2018, H3 (j) (i)
  • 38mm x 6g Screws @ 150mm CTS per AS/NZS 2588
  • ≥ 4.5mm Fibre-cement Eaves to protect the PlasterboardAS 3959:2018, H3 (j) (ii)

Penetration RULES


NCC 2022 V3


All Building Classes


NCC 2022 G5, H7D4, & S1

[2019 G5, 3.10.5, Sch 5]


May 2023



AS 3959:2018, 9.6.5

NCC 2022 Vol 1, G5

NCC 2022 Vol 2, H7D4

  • Building elements within Bushfire-prone Areas to be Bushfire Attack Resistant to the NCCAS 3959:2018, 9.6.5NCC 2022 Vol 1, G5
  • Seal openings with Fireproof Mineral Fiber, maintaining full function of penetrated elementsNCC 2022 Vol 2, H7D4
  • Use only non-combustible materials
  • Rooflights, Ventilators & Pipes or Conduit to be AS 1530.8.2 compliant

Penetration RULES


NCC 2022 V4


All Building Classes


NCC 2022 G5, H7D4, & S1

[2019 G5, 3.10.5, Sch 5]


May 2023



AS 3959:2018, 9.6.5 (a)

AS 3959:2018, 9.6.5 (a)

AS 3959:2018, 9.6.5 (b)

  • Building elements within Bushfire-prone Areas to be Bushfire Attack Resistant to NCC Specification 1, NCC Part G5, & AS 3959
  • Seal openings with Fireproof Mineral Fiber, maintaining full function of penetrated elementsAS 3959:2018, 9.6.5 (a)
  • Use only non-combustible materialsAS 3959:2018, 9.6.5 (a)
  • Rooflights, Ventilators & Pipes or Conduit to be AS 1530.8.2 compliantAS 3959:2018, 9.6.5 (b)

Eaves MATERIALS


NCC 2022 V3


All Building Classes


NCC 2022 G5, H7D4, & S1

[2019 G5, 3.10.5, Sch 5]


May 2023



AS 3959:2018, H3 (j)

NCC 2022 Vol 1, G5

NCC 2022 Vol 2, H7D4

  • Building elements within Bushfire-prone Areas to be Bushfire Attack Resistant to the NCCAS 3959:2018, H3 (j)NCC 2022 Vol 1, G5
  • Eaves construction materialsNCC 2022 Vol 2, H7D4
  • ≥ 15mm Plywood installed on top of Timber, or Steel Truss Framing
  • ≥ 16mm Water & Fire-resistant Plasterboard fixed into Plywood with
  • 38mm x 6g Screws @ 150mm CTS per AS/NZS 2588
  • ≥ 4.5mm Fibre-cement Eaves to protect the Plasterboard

AS 3959:2018, 9.6.6 (c) (i)

AS 3959:2018, H3 (j)

Roof Construction BAL-FZ (Light Steel)

Redirecting... (5)