Travel Distance (Egress) Building Codes & Rules


- Discover the key to safe building design with Tools™. We transform the NCC into interactive graphics, ensuring egress rules are easily understood and followed.


Compartmentation & Separation

Travel Width (Egress)

NCC 2022 Vol 1, D2D5 (1) (b)

≤ 20mNCC 2022 Vol 1, D2D5 (1) (b)

NCC 2022 Vol 1, D2D12 (3)

≤ 6mNCC 2022 Vol 1, D2D12 (3)

Fire-isolated Exit

NCC 2022 Vol 1, D2D3 (2) (b) (ii)

NCC 2022 Vol 1, D2D5 (1) (a) (ii)

Storey with Direct Egress in Class 2 & 3

Sole Occupancy Unit

Top Riser or Ramp

Point of

Choice

NCC 2022 Vol 1, D2D5 (1) (b)

≤ 20mNCC 2022 Vol 1, D2D5 (1) (b)

NCC 2022 Vol 1, D2D5 (1) (b)

≤ 20mNCC 2022 Vol 1, D2D5 (1) (b)

NCC 2022 Vol 1, D2D5 (1) (b)

≤ 20mNCC 2022 Vol 1, D2D5 (1) (b)

NCC 2022 Vol 1, D2D6 (d)

Alternative Paths

NCC 2022 Vol 1, D3D4 (b)

NCC 2022 Vol 1, D3D4 (c) (i)

Non-fire-isolated Stair or Ramp

NCC 2022 Vol 1, D3D5

Separation of FlightsNCC 2022 Vol 1, D3D5

  • Non-combustible & smoke proof
  • Separation of rising & descending Egress Stairs

NCC 2022 Vol 1, D2D5 (1) (b)

≤ 20mNCC 2022 Vol 1, D2D5 (1) (b)

NCC 2022 Vol 1, D2D5 (1) (b)

≤ 20mNCC 2022 Vol 1, D2D5 (1) (b)

NCC 2022 Vol 1, D2D5 (1) (a) (ii)

≤ 20mNCC 2022 Vol 1, D2D5 (1) (a) (ii)

NCC 2022 Vol 1, D2D12 (3) (b)

≥ 3mNCC 2022 Vol 1, D2D12 (3) (b)

NCC 2022 Vol 1, D2D12 (3) (b)

≥ 3mNCC 2022 Vol 1, D2D12 (3) (b)

NCC 2022 Vol 1, D2D12 (3) (a) (i)

60/60/60 FRLNCC 2022 Vol 1, D2D12 (3) (a) (i)

NCC 2022 Vol 1, D2D5 (1) (a) (i)

≤ 6mNCC 2022 Vol 1, D2D5 (1) (a) (i)

NCC 2022 Vol 1, D2D5 (1) (a) (i)

≤ 6mNCC 2022 Vol 1, D2D5 (1) (a) (i)

Point of

Choice

NCC 2022 Vol 1, D2D12 (1)

NCC 2022 Vol 1, D3D9 (1)

Fire-isolated Exits

  • Doors that may open into a Fire-isolated StairNCC 2022 Vol 1, D2D12 (1)
  • Public Corridor or Lobby
  • Sole-occupancy Unit if occupying the entire Storey
  • Sanitary compartment or Airlock
  • Space under must not be enclosed to form a cupboard or similar enclosed spaceNCC 2022 Vol 1, D3D9 (1)

Level of Egress

Basement

Above Egress Storey

Discharge to Open Space

NCC 2022 Vol 1, D2D15 (1)

BarrierNCC 2022 Vol 1, D2D15 (1)

  • Prevents blockage
  • Bollard in Carparks

Discharge to Open Space

Non-combustible & Smoke Proof Wall

Descending Flight

Rising Flight

Other than Sole

Occupancy Unit

Sole Occupancy Unit

NCC 2022 Vol 1, D3D9 (2)

Non-fire-isolated StairNCC 2022 Vol 1, D3D9 (2)

  • Space under (including external Stairway) may be enclosed with
  • 60/60/60 FRL Walls & ceiling
  • -/60/30 FRL self-closing Fire Door

NCC 2022 Vol 1, D2D3 (3)

BasementsNCC 2022 Vol 1, D2D3 (3)

  • ≥ 2 Exits if
  • > 1.5m Rise to Egress point
  • ≥ 1 Exit allowed if
  • ≤ 50m² Floor Area, &
  • ≤ 20m Travel Distance

Point of Egress

NCC 2022 Vol 1, D2D14 (2) (b)

NCC 2022 Vol 1, D2D14 (2) (a)

NCC 2022 Vol 1, D2D14 (4) (a)

NCC 2022 Vol 1, D2D14 (4) (b)

Travel by Non-fire-isolated Stair or Ramp

NCC 2022 Vol 1, C4D10

NCC 2022 Vol 1, C1P2 (1)

Avoiding Spread of Fire

  • Installation of appropriate Fire-stopping solutions - NCC 2022 Vol 1, C4D10
  • To Exits,
  • To Sole-occupancy units & Public Corridors,
  • In Between Buildings, &
  • In a Building
  • No services other than the following may penetrate fire-isolated exitsNCC 2022 Vol 1, C1P2 (1)
  • Electrical wiring in compliance with NCC,
  • ≥ -/120/60 FRL Wall penetrated by Pressurisation System Ducting, or
  • For Fire Services, Water Supply & Test Drain Pipes

NCC 2022 Vol 1, D2D6

Alternative ExitsNCC 2022 Vol 1, D2D6

  • ≥ 9m to ≤ 45m apart for Class 2 or 3
  • ≥ 9m to ≤ 60m apart for Class 4
  • Uniformly distributed

Class 9



Required

Non Fire-isolated Exit

Fire-stopping Penetrations

Path of Travel Near Subject Building


  • ≤ 6m past same building's wall[1]
  • 60/60/60 FRL[2]
  • 3m above & below level of Path of Travel[3]
  • Openings protected internally[4]


Protection of Openings


NCC 2022 V1


Class 2 to 9


NCC 2022 C4D5, S12 [2019 C3.4, S3.4]


1 May 2023



NCC 2022 Vol 1, C4D5 (1) (a) (ii)

NCC 2022 Vol 1, C4D5 (1) (a) (i)

NCC 2022 Vol 1, C4D5 (1) (b) (ii)

NCC 2022 Vol 1, C4D5 (1) (b) (iii)

NCC 2022 Vol 1, C4D5 (1) (c) (ii)

NCC 2022 Vol 1, D2D12 (3)

NCC 2022 Vol 1, D2D12 (3) (a) (i)

NCC 2022 Vol 1, C4D5

NCC 2022 Vol 1, D2D12 (3) (b)

Number of Exits


  • ≥ 2 Exits each Storey if[1]
  • > 25m Effective Height


Number of EXITS


NCC 2022 V2


Class 2 to 9


NCC 2022 D2D3 [2019, D1.2]


01 May 2023



NCC 2022 Vol 1, D2D3 (1)

NCC 2022 Vol 1, D2D3 (2) (a) (i)

NCC 2022 Vol 1, D2D3 (2) (a) (i)

NCC 2022 Vol 1, D2D3 (4) (a) (i)

NCC 2022 Vol 1, D2D3 (4) (a) (v)

NCC 2022 Vol 1, D2D3 (4) (a) (iii)

NCC 2022 Vol 1, D2D3 (4) (a) (iv)

NCC 2022 Vol 1, D2D3 (3)

NCC 2022 Vol 1, D2D3 (3)

NCC 2022 Vol 1, D2D4 (2)

NCC 2022 Vol 1, D2D3 (2) (a) (i)

Redirecting... (5)
Please wait while we redirect you to the correct page.