Fire Hydrant Booster Assembly Building Codes & Rules


- Fire Hydrant Booster Assembly Tools™ simplifies the National Construction Code (NCC) with interactive graphics, including deemed to comply & best practices.


AS 2419.1:2021, 7.6.2

≥ 2mAS 2419.1:2021, 7.6.2

AS 2419.1:2021, 5.3.2.2 (a)

DN 150AS 2419.1:2021, 5.3.2.2 (a)

AS 2419.1:2021, 3.2.2.2 (c)

≥ 100 clearAS 2419.1:2021, 3.2.2.2 (c)

Fire Door

AS 2419.1:2021, 2.2.3 (d)

≥ 3mAS 2419.1:2021, 2.2.3 (d)

AS 2419.1:2021, 7.5.3 (d) (i)

750

to

1.2mAS 2419.1:2021, 7.5.3 (d) (i)

AS 2419.1:2021, 7.5.3 (d) (ii)

≥ 450AS 2419.1:2021, 7.5.3 (d) (ii)

AS 2419.1:2021, 7.3.3 (d)

FRNSW Fire Safety Guidelines 2012 -, -

FRNSW Fire Safety Guidelines 2012 -, -

FRNSW Fire Safety Guidelines 2012 -, -

Location

If in an External WallFRNSW Fire Safety Guidelines 2012 -, -

  • Within sight of main entrance
  • Protected from fire by a Fire-resistant Wall

If RemoteFRNSW Fire Safety Guidelines 2012 -, -

  • On site boundary adjacent to main driveway access
  • Within sight of main entrance
  • ≥ 10m from external wall of served building

Full Flow Non-return Valve

Full Direction Arrow

Pressure Gauge

AS 2419.1:2021, 7.5.3

Signage of Boost

Pressure & Test

ComplianceAS 2419.1:2021, 7.5.3

Fully wound-

out position

AS 2419.1:2021, 7.5.3

Fire Hydrant Valve

AS 2419.1:2021, 7.6.2

ProtectionAS 2419.1:2021, 7.6.2

  • FRL 90/90/90 separation to building
  • 3m above
  • 2m to sides of Assembly

AS 2419.1:2021, 7.5.3

Booster Inlets

AS 2419.1:2021, 7.5.3 (d) (v)

≥ 225AS 2419.1:2021, 7.5.3 (d) (v)

Thrust Block

(as required)

Standing Surface

AS 2419.1:2021, 7.5.3

Building

or Site

Block PlanAS 2419.1:2021, 7.5.3

AS 2419.1:2021, 9.4 (c) (iii)

DN 150AS 2419.1:2021, 9.4 (c) (iii)

AS 2419.1:2021, 7.6.2

≥ 2mAS 2419.1:2021, 7.6.2

Outside Screw & Yoke, Isolation or Approved Butterfly Valve

AS 2419.1:2021, 9.4 (c) (iii)

DN 150AS 2419.1:2021, 9.4 (c) (iii)

Fire Hose Reel