NCC 2022 HP, 9.3.1 (4)
Masonry Veneer Exterior WallNCC 2022 HP, 9.3.1 (4)
- ≤ 50mm gap between separating wall & masonry veneer
- Fill gap with Fire-resistant materials for weatherproofing
NCC 2022 HP, 9.3.3 (a)
Class 10a Private Garage not associated with Dwelling 3
NCC 2022 HP, 9.3.3 (b)
NCC 2022 HP, 9.3.1 (1) (c) (ii)
NCC 2022 HP, 9.3.1 (1) (a) (i)
NCC 2022 HP, 9.3.1 (5)
Non-combustible PartitionNCC 2022 HP, 9.3.1 (5)
- Separation of two dwellings with common eaves or verandah space to have either
- [A] Partition installed on common eaves or verandah space or,
- [B] Partition in between the Class 1 dwelling & the common eaves or verandah space
- Installed on one side of roof support
NCC 2022 HP, 9.3.4 (1)
NCC 2022 HP, 9.3.4 (2)
Horizontal Projection
- 1.8m Fire Resistance Area on each side of Separating WallNCC 2022 HP, 9.3.4 (1)
- ≥ 60 minutes Fire Resistance duration of Floor, Soffit or Ceiling
- ≥ 30/30/30 FRL
- Extended part of Separating Wall must haveNCC 2022 HP, 9.3.4 (2)
- Fire-resistant material between gaps of wall base and soffit or floor
- ≤ 75 x 50mm Timber framing, or
- Sarking
Smoke Alarm
NCC 2022 HP, 9.3.4 (1)
NCC 2022 HP, 9.4.1
NCC 2022 HP, 9.4.2
Class 10a Private Garage Requirements
- Wall Fire SeparationNCC 2022 HP, 9.4.1
- ≥ 60/60/60 FRL
- ≥ 90mm Masonry Construction
- From Footing or Ground Slab
- Extend to underside of Separating Floor
- Floor Fire SeparationNCC 2022 HP, 9.4.2
- ≥ 30/30/30 FRL
- ≥ 60 minutes Fire Resistance duration
- If floor is combustible or metal, provide Fire-protective covering to underside of the floor & beams
Wall extension for Combustible Roof Covering
Non-combustible Roof Cover
Firestopping Penetrations
Fire Separating Walls
- Wall separation between Class 1 dwellings & Class 10a[1]
Fire Separating Wall Construction
NCC 2022 V1
Building Classes 1 & 10
NCC 2022 HP 9.3.1
May 2023
NCC 2022 HP, 9.3.1 (3)
NCC 2022 HP, 9.3.1 (1) (c) (ii)
NCC 2022 HP, 9.3.1 (1)
- Wall construction requirementsNCC 2022 HP, 9.3.1 (3)
- ≥ 60/60/60 FRL
- ≥ 90mm thk Masonry
- Wall to Footings or Ground Slab except for horizontal projections
- If building has Fire-resistant roof coverNCC 2022 HP, 9.3.1 (1) (c) (ii)
- Avoid large timber roof framing & other combustible materials
- ≤ 75 x 50mm Roof battens, or
- Roof Sarking
- Fill gaps with mineral fibre or other Fire-resisting Material between wall top & underside of Roof Cover
- If building has combustible Roof CoverNCC 2022 HP, 9.3.1 (1)
- ≥ 450mm extension of Separating Wall above Roof
NCC 2022 HP, 9.3.1 (1)