Property Boundary (Fire Separation) Building Codes & Rules


- Class 1 Fire Separation Tools™ simplifies the National Construction Code (NCC) with interactive graphics, including deemed to comply & best practices.


Building on Same Allotment

NCC 2022 HP, 9.2.3 (2) (a)

60/60/60 FRLNCC 2022 HP, 9.2.3 (2) (a)

NCC 2022 HP, 9.2.3 (3) (a)

-/60/-

FRLNCC 2022 HP, 9.2.3 (3) (a)

NCC 2022 HP, 9.2.1 (a)

≥ 900NCC 2022 HP, 9.2.1 (a)

Class

NCC 2022 HP, 9.2.2

≥ 90°NCC 2022 HP, 9.2.2

Class

NCC 2022 HP, 9.2.5

SetbackNCC 2022 HP, 9.2.5

NCC 2022 HP, 9.2.5

SeparationNCC 2022 HP, 9.2.5

NCC 2022 HP, 9.2.10

Combustible Roof LightsNCC 2022 HP, 9.2.10

  • ≥ 900mm from Property Boundary
  • ≤ 20% Area of Roof required to be non-combustible

NCC 2022 HP, 9.2.5

Protection of External WallsNCC 2022 HP, 9.2.5

  • ≥ 900mm maintained distance to
  • Setback, or
  • Separation, or
  • 60/60/60 FRL Construction to
  • [A] Setback, or
  • [B] Class 10a Wall, or
  • [C] Class 1 Wall

NCC 2022 HP, 9.2.3 (1) (a)

NCC 2022 HP, 9.2.3 (2)

NCC 2022 HP, 9.2.3 (3) (b)

NCC 2022 HP, 9.2.3 (3) (a)

Fire Resisting Wall Construction < 900mm

NCC 2022 HP, 9.2.9 (4)

EncroachmentsNCC 2022 HP, 9.2.9 (4)

  • Combustible
  • Fascia
  • Non-combustible
  • Gutter, Downpipe

NCC 2022 HP, 9.2.9 (3)

Fire Resisting Roof Construction < 900mmNCC 2022 HP, 9.2.9 (3)

  • Non-combustible Eaves lining & Roof cover

NCC 2022 HP, 9.2.9 (3)

NCC 2022 HP, 9.2.9 (4)

NCC 2022 HP, 9.2.9 (3) (d)

Allowable Encroachments

Property Boundary

A

B

C

Property Boundary

NCC 2022 HP, 9.2.3 (4)

Window FRL exemption ≥ 600mm from BoundaryNCC 2022 HP, 9.2.3 (4)

  • ≤ 1.2m² Bathroom, Laundry or WC
  • ≤ 0.54m² Non-openable rooms
  • Steel framed, Wired Glass, or
  • Hollow Glass Blocks

10a

1

NCC 2022 HP, 9.2.9 (4)

≥ 450NCC 2022 HP, 9.2.9 (4)

Fire Separation Carports


  • ≥ 2 Open Sides[1]
  • ≥ 2/3 Open Perimeter


Fire Separation Carport RULES


NCC 2022 V1


All Building Classes


NCC 2022 HP 9.2.8 [2019: 3.7.2.6]


May 2023



NCC 2022 HP, 9.2.8

NCC 2022 HP, 9.2.8 (b)

NCC 2022 HP, 9.2.8 (f)

NCC 2022 HP, 9.2.8 (f) (i)

NCC 2022 HP, 9.2.8 (f) (ii)

NCC 2022 HP, 9.2.8 (c)

NCC 2022 HP, 9.2.8 (c)

NCC 2022 HP, 9.2.8 (a)