Fire-stopping Penetrations Overview Building Codes & Rules


- Protect lives! Learn fire-stopping for holes in fire barriers. Tools™ simplifies NCC with interactive graphics. Get expert tips for proper sealing & compliance


Bushfire Prone Development

Concrete Slab

Concrete Slab

Firestop Putty

Electrical Boxes

Fire Sleeves / Fire Coat

Metal Pipe System

Insulated Spandrel

NCC 2022 Vol 1, S13C6 (a) (ii)

Electrical Switch & Outlet Penetrations

Fire Barrier

Duct Wrap

Opposite Wall

Opening

Floor Fire Block

NCC 2022 Vol 1, S13C6 (a)

≥ 300NCC 2022 Vol 1, S13C6 (a)

Insulated Spandrel

Horizontal Cavity Barrier - Curtain Wall Gap

Insulated Spandrel

Multi-Service Transit Box

Mixed Services Firestopping

Vertical Perimeter Barrier Firestop

Head-of-Wall Firestop

Floor Movement Joint Firestop

Wall Movement Joint Firestop

NCC 2022 Vol 1, S13C6 (a)

≥ 600NCC 2022 Vol 1, S13C6 (a)

Wire & Cable Penetrations


  • Fire-stop between Service & the Wall, Floor, or Ceiling[1]


Wire & Cable Penetration RULES


NCC 2022 V7


Class 2 to 9


NCC 2022 S13C5, S13C7, C4D15(c)(iii)

[2019 C3.15.5, C3.15.7]


May 2023



NCC 2022 Vol 1, S13C5 (a)

NCC 2022 Vol 1, S13C5 (b)

  • ≥ 50mm Penetration distance to other Services NCC 2022 Vol 1, S13C5 (a)
  • Opening cross-sectional areaNCC 2022 Vol 1, S13C5 (b)
  • ≤ 2000mm² Single Cable Penetration with ≤ 15mm gap between Cable and Penetration edge
  • ≤ 500mm² any other case
  • Always refer to Manufacturer's Requirements for Fire-stopping Products

NCC 2022 Vol 1, S13C5

AAC Wall Penetrations

Concrete Floor Penetrations

Site Tools

Plumbing Overview

Sealant Joint

Masonry & Concrete Wall Penetrations

Adjoining Building

Fire Damper Installation

Type of Construction

Fire Compartmentation

Fire-stop


  • Must be Concrete, High-temperature Ceramic Fibre or another material that can withstand ≥ 1120°C[1]


Fire-stopping RULES


NCC 2022 V2


Class 2 to 9


NCC 2022 S13C7 [2019 SC3.15.7]


May 2023



NCC 2022 Vol 1, S13C7 (1)

NCC 2022 Vol 1, S13C7 (3)

  • MaterialNCC 2022 Vol 1, S13C7 (1)
  • Concrete, High-temperature Ceramic Fibre, or another material that can withstand ≥ 1120°C
  • Tested as per Standard, and
  • Passed the required FRL, or
  • Resist the incipient spread of fire
  • Hollow Wall ConstructionNCC 2022 Vol 1, S13C7 (3)
  • ≥ 25mm thk Fire-stop around Service Pipe Penetrations
  • Restrained from moving
  • Must not detach from linked surfaces of the service, wall, floor, or ceiling

NCC 2022 Vol 1, S13C7 (1)