Hot Water Service Building Codes & Rules


- Hot Water Service Tools™ simplifies the National Construction Code (NCC) with interactive graphics, including deemed to comply & best practices.


NCC 2022 Vol 3, B2D5 (a)

NCC 2022 Vol 3, B2D5 (b)

Tempered Hot Water

Hot Water

  • To Kitchens & Laundries

AS/NZS 3500.4:2021, 8.2.2

InsulationAS/NZS 3500.4:2021, 8.2.2

  • Thermal Insulation to AS 3500.4
  • ≥ 500mm from Inlets, Outlets & Valves of Storage Tank
  • Hot Water Piping continuously to Kitchen Sink & any buried or Concrete encased Pipes

Potable Water Supply

PLD

Isolation Valve

AS/NZS 3500.4:2021, 3.3 (a)

AS/NZS 3500.4:2021, 3.3 (g) (ii)

Water Supply Valves

AS/NZS 5601.1:2022, 5.1.2

Electrical Circuit

Gas Supply Pipework

  • To AS/NZS 5601.1

Line Strainer

Pressure Limiting Device

AS/NZS 3500.4:2021, 5.3.2 (d)

Pressure & Temperature

Relief Valve

AS/NZS 3500.4:2021, 4.3.2.2

≥ 25AS/NZS 3500.4:2021, 4.3.2.2

AS/NZS 3500.4:2021, 5.3.2 (d)

150AS/NZS 3500.4:2021, 5.3.2 (d)

clear

AS/NZS 3500.4:2021, 4.3.2.2

≥ 25AS/NZS 3500.4:2021, 4.3.2.2

AS/NZS 3500.4:2021, 5.3.1

LocationAS/NZS 3500.4:2021, 5.3.1

  • As close as possible to the most frequently used outlet
  • Consider routing of Flues, Vent Pipes, drainage points

AS/NZS 3500.4:2021, 1.11.2 (a)

Storage Temperature

AS/NZS 3500.4:2021, 5.3.2 (e)

AS/NZS 3500.4:2021, 5.3.2 (e)

AS/NZS 3500.4:2021, 5.3.2 (a)

Service Access & Clearances

Isolation Valve

Non-Return Valve

Line Strainer

Insulation

Non-Return Valve

Non-Return Valve

Isolation Valve

Thermostatic Mixing Valve

Isolation Switch

Isolation Valve

Cold Water Expansion Valve

Insulation

AS/NZS 3500.4:2021, 8.2.2

≥ 500AS/NZS 3500.4:2021, 8.2.2

AS/NZS 3500.4:2021, 8.2.2

≥ 500AS/NZS 3500.4:2021, 8.2.2

Safety Tray

(Internal Installation)

AS/NZS 3500.4:2021, 5.3.3

  • VentilationAS/NZS 3500.4:2021, 5.3.3
  • Gas models flued if internally located, or
  • Located away from openable Windows
  • Heat Pump models to Manufacturer's Specifications

Installation

  • Follow Manufacturer's installation instructions
  • Specific details of model being installed
  • Working pressure
  • Specific Valve type & configuration
  • Ventilation requirements & clearances
  • Anode type dependent on water supply
  • If a heat trap needs to be installed

AS 3660.3:2014, 3.2.1

AS/NZS 3500.4:2021, 5.4.4.3 (a)

AS/NZS 3500.4:2021, 5.11.3 (g)

AS/NZS 3500.4:2021, 5.4.4.3 (d) (ii)

Waste Water

AS/NZS 3500.4:2021, 5.4.5

AS/NZS 3500.4:2021, 5.5.3 (b) (ii)

AS/NZS 3500.4:2021, 5.5.3 (b) (i)

Support

Protection from Damage

  • Install impact barriers if at risk from vehicle movements

Plumbing Overview

Redirecting... (5)
Please wait while we redirect you to the correct page.