NCC 2022 Vol 3, B2D5 (a)
NCC 2022 Vol 3, B2D5 (b)
AS/NZS 3500.4:2021, 8.2.2
InsulationAS/NZS 3500.4:2021, 8.2.2
- Thermal Insulation to AS 3500.4
- ≥ 500mm from Inlets, Outlets & Valves of Storage Tank
- Hot Water Piping continuously to Kitchen Sink & any buried or Concrete encased Pipes
AS/NZS 3500.4:2021, 3.3 (a)
AS/NZS 3500.4:2021, 3.3 (g) (ii)
AS/NZS 5601.1:2022, 5.1.2
AS/NZS 3500.4:2021, 5.3.2 (d)
Pressure & Temperature
Relief Valve
AS/NZS 3500.4:2021, 4.3.2.2
AS/NZS 3500.4:2021, 5.3.2 (d)
AS/NZS 3500.4:2021, 4.3.2.2
AS/NZS 3500.4:2021, 5.3.1
LocationAS/NZS 3500.4:2021, 5.3.1
- As close as possible to the most frequently used outlet
- Consider routing of Flues, Vent Pipes, drainage points
AS/NZS 3500.4:2021, 1.11.2 (a)
AS/NZS 3500.4:2021, 5.3.2 (e)
AS/NZS 3500.4:2021, 5.3.2 (e)
AS/NZS 3500.4:2021, 5.3.2 (a)
Service Access & Clearances
Thermostatic Mixing Valve
Cold Water Expansion Valve
AS/NZS 3500.4:2021, 8.2.2
AS/NZS 3500.4:2021, 8.2.2
Safety Tray
(Internal Installation)
AS/NZS 3500.4:2021, 5.3.3
- VentilationAS/NZS 3500.4:2021, 5.3.3
- Gas models flued if internally located, or
- Located away from openable Windows
- Heat Pump models to Manufacturer's Specifications
Installation
- Follow Manufacturer's installation instructions
- Specific details of model being installed
- Working pressure
- Specific Valve type & configuration
- Ventilation requirements & clearances
- Anode type dependent on water supply
- If a heat trap needs to be installed
AS 3660.3:2014, 3.2.1
AS/NZS 3500.4:2021, 5.4.4.3 (a)
AS/NZS 3500.4:2021, 5.11.3 (g)
AS/NZS 3500.4:2021, 5.4.4.3 (d) (ii)
AS/NZS 3500.4:2021, 5.4.5
AS/NZS 3500.4:2021, 5.5.3 (b) (ii)
AS/NZS 3500.4:2021, 5.5.3 (b) (i)
Protection from Damage
- Install impact barriers if at risk from vehicle movements
Plumbing Overview