Box (Gutters) Building Codes & Rules


- Learn how to install box gutters and rain heads with the weir design for optimal drainage and protection. Follow key steps for a reliable, flood-free solution.


Sump

Nozzle

Downpipe

Rain Water Head

Lap joint

Class 1

Roofing

Drip Edge

50

min

25

50

min

20

Capping

Overflow

HB 39:2015, 5.3.1

≥ 50HB 39:2015, 5.3.1

HB 39:2015, 3.10

Blanket InsulationHB 39:2015, 3.10

  • Cut back Insulation at Fascia / sheet end
  • Profiled foam filler strip or end cap to Roof Sheet

Fall

Support

Class 2 to 9

> 5°

Maximum length between Expansion Joints

HB 39:2015, 2.0

MaterialHB 39:2015, 2.0

  • To be compatible to avoid galvanic reaction
  • Stainless steel in coastal or industrial environments
  • Joints soldered or sealed

AS/NZS 3500.3:2021, 4.5.4 (b)

HB 39:2015, 5.3.2 (k)

25AS/NZS 3500.3:2021, 4.5.4 (b)HB 39:2015, 5.3.2 (k)

HB 39:2015, 5.3.2 (f)

≥ 50HB 39:2015, 5.3.2 (f)

AS/NZS 3500.3:2021, 4.5.4 (b)

HB 39:2015, 5.3.2 (k)

AS/NZS 3500.3:2021, 4.7.2.3

Lap Joints

HB 39:2015, 5.3.1

≥ 25HB 39:2015, 5.3.1

Informative

CappingsInformative

  • Fall towards gutter
  • Avoid fixing through top
  • Drip edge to avoid wall staining

AS/NZS 3500.3:2021, 4.5.4

HB 39:2015, 5.3.2 (j)

Weather Folded SidesAS/NZS 3500.3:2021, 4.5.4

HB 39:2015, 5.3.2 (b)

≥ 50HB 39:2015, 5.3.2 (b)

Tools™ Best Practice

AS/NZS 3500.3:2021, 4.9.4 (b)

AS/NZS 3500.3:2021, 4.9.4

AS/NZS 3500.3:2021, 4.9

Informative

Informative

SupportAS/NZS 3500.3:2021, 4.9.4 (b)

Tools™ Best Practice

Colour-matched SealantTools™ Best Practice

Tools™ Best Practice

SealantTools™ Best Practice

  • Neutral cure silicone
  • "Stitch" over end joints to improve watertightness

HB 39:2015, 5.3.3

≥ Ø DPHB 39:2015, 5.3.3

HB 39:2015, 5.3.1

≥ 50HB 39:2015, 5.3.1

Base of Overflow

below Gutter level

NCC 2022 Vol 2, H2D6 (1) (a)

NCC 2022 Vol 2, H2D6 (3) (b)

Compliance

NCC 2022 HP, 7.5.8 (b)

≥ 5°NCC 2022 HP, 7.5.8 (b)

NCC 2022 HP, 7.5.8 (a) (ii)

≥ 50NCC 2022 HP, 7.5.8 (a) (ii)

AS/NZS 3500.3:2021, 4.3.2 (c)

AS/NZS 3500.3:2021, 4.4

HB 39:2015, 5.7

DownpipeAS/NZS 3500.3:2021, 4.3.2 (c)

HB 39:2015, 5.3.2 (o)

≥ 25HB 39:2015, 5.3.2 (o)

HB 39:2015, 5.3.2 (i)

Fall ≥ 1:200HB 39:2015, 5.3.2 (i)

Tools™ Best Practice

Colour-matched SealantTools™ Best Practice

HB 39:2015, 5.3.2 (g)

75HB 39:2015, 5.3.2 (g)

HB 39:2015, 6.3

HB 39:2015, 5.3.2 (o)

Sarking

HB 39:2015, 5.3.2 (g)

200HB 39:2015, 5.3.2 (g)

HB 39:2015, 5.3.2 (g)

300HB 39:2015, 5.3.2 (g)

Tools™ Best Practice

Paintable

SealantTools™ Best Practice

Tools™ Best Practice

Colour-matched SealantTools™ Best Practice

Tools™ Best Practice

Colour-matched SealantTools™ Best Practice

Downturn & Seal

Roofing Durability

Tools™ Best Practice

75Tools™ Best Practice

Sump


  • Sizing to AS 3500.3, Appendix H[1]
  • ≥ 150mm deep (if high capacity overflow)[2]
  • 400mm or ≥ 2 x Ø DP long[3]


Hail Guard BEST PRACTICE


NCC 2022 V1


Sump RULES


NCC 2022 V3


All Building Classes


NCC 2022 F1D3 [2019 F1.1]


May 2023



AS/NZS 3500.3:2021, 3.7.6 (g)

AS/NZS 3500.3:2021, 3.7.6

AS/NZS 3500.3:2021, 3.7.6 (e)

AS/NZS 3500.3:2021, H (c)

AS/NZS 3500.3:2021, H

Tools™ Best Practice

Paintable

SealantTools™ Best Practice

Tools™ Best Practice

Paintable

SealantTools™ Best Practice

Roof Sheeting


  • Spans & Fixings to manufacturer's specification[1]
  • Profile to suit pitch & rainfall intensities[2]
  • Install Hail Guard Angle above all Box Guttering[3]


Hail Guard BEST PRACTICE


NCC 2022 V1


Roof Sheeting INSTALLATION


NCC 2022 V1


Roof Sheeting RULES


NCC 2022 V3


All Building Classes


NCC 2022 F3, H2D6, J4D4, & HP7 [2019 3.5.1-3.5.5, J1.3, 3.5]


May 2023



HB 39:2015, 5.1

  • Roofing detailed and built to the NCC
  • Weathering fold on endsHB 39:2015, 5.1
  • Refer to detail below for roof ≤ 5°

AS 1562.1:2018, 2.2.1

AS 1562.1:2018, 3.3.1 (b)

Tools™ Best Practice

Side Overflow


  • Direct water away from building[1]
  • To surface stormwater within property[2]
  • Capacity no less than design flow of Downpipe[3]
  • Flange sealed to Wall and Overflow[4]
  • Drip edges to Cappings, Overflows & Rainheads[5]


Overflow RULES


NCC 2022 V3


All Building Classes


NCC 2022 F1D3 [2019 F1.1]

NCC 2022 H2D2 HP 3.3.5, & 7.4 [2019 3.1.3, 3.5.3]


May 2023



NCC 2022 Vol 1, F1D3

NCC 2022 Vol 2, H2D2

AS/NZS 3500.3:2021, 3.2 (a)

AS/NZS 3500.3:2021, 3.5.2

Overflow BEST PRACTICE


NCC 2022 V1


HB 39:2015, 5.3.1 (c)

HB 39:2015, 5.3.1

HB 39:2015, 5.3.1

HB 39:2015, 5.3.1

HB 39:2015, 5.3.1

Expansion


  • ≤ 20m CTS for 0.55 BMT steel[1]


Expansion Joint RULES


NCC 2022 V1


All Building Classes


NCC 2022 F1D3, H2D2, Parts 3.3.5, & 7.4

[2019 F1.1, 3.1.3.0-3.1.3.1, 3.1.3.5, 3.5.3]


May 2023



HB 39:2015, 5.3.2 (b)

Overflow Weir


  • Direct water away from building[1]
  • To surface stormwater within property[2]
  • Capacity no less than design flow of Downpipe[3]
  • Flange sealed to Wall and Overflow[4]
  • Drip edges to Cappings, Overflows & Rainheads[5]


Overflow RULES


NCC 2022 V3


All Building Classes


NCC 2022 F1D3 [2019 F1.1]

NCC 2022 H2D2 HP 3.3.5, & 7.4 [2019 3.1.3, 3.5.3]


May 2023



NCC 2022 Vol 1, F1D3

NCC 2022 Vol 2, H2D2

AS/NZS 3500.3:2021, 3.2 (a)

AS/NZS 3500.3:2021, 3.5.2

Overflow BEST PRACTICE


NCC 2022 V1


HB 39:2015, 5.3.1 (c)

HB 39:2015, 5.3.1

HB 39:2015, 5.3.1

HB 39:2015, 5.3.1

HB 39:2015, 5.3.1

Box Gutter


  • ≥ 300mm (W) x 75mm (H)[1]
  • ≥ 200mm (W) allowed for residential, ensure hand space for maintenance[2]
  • Straight, constant width + vertical sides[3]
  • Calculate minimum size or seek advice from Hydraulic Engineer[4]
  • Size must include for secondary roofs / spreader volumes


Box Gutter RULES


NCC 2022 V1


All Building Classes


NCC 2022 F1D3, H2D2, Parts 3.3.5, & 7.4

[2019 F1.1, 3.1.3.0-3.1.3.1, 3.1.3.5, 3.5.3]


May 2023



HB 39:2015, 5.6 (j)

HB 39:2015, 5.3.2 (g)

HB 39:2015, 5.3.2 (i)

HB 39:2015, 5.3.2 (m)

HB 39:2015, 5.3.2 (j)

HB 39:2015, 5.3.2 (m)

HB 39:2015, 5.3.2

NCC 2022 Vol 1, F1D3

NCC 2022 Vol 2, H2D2

AS/NZS 3500.3:2021, 3.7.6 (b)

HB 39:2015, 5.3.2 (g)

HB 39:2015, 5.3.2 (g)

HB 39:2015, 5.3.2 (l)

Downpipes