Installation & Storage
- Avoid indoor storage, even for Cylinders not in use
- Protect from physical impact
Cylinder Storage RULES
NCC 2022 V1
- Avoid indoor storage, even for Cylinders not in use
- Protect from physical impact
NCC 2022 HP, 9.2.9 (4)
AS/NZS 1596:2014, 4.4.5 (c)
AS/NZS 5601.1:2013, J5
AS/NZS 1596:2014, 4.4.5
AS/NZS 5601.1:2013, J5
AS/NZS 5601.1:2013, J5
AS/NZS 1596:2014, 4.4.5
Building Wall Perimeter
- copy
AS/NZS 1596:2014, 4.4.5
Property Line or Other Building
NCC 2022 HP, 9.2.9 (4)
AS/NZS 1596:2014, 4.4.8 (b)
AS/NZS 1596:2014, 4.4.5 (c)
AS/NZS 1596:2014, 4.4.5
AS/NZS 1596:2014, 4.4.8 (a)
Cylinder in Enclosure or Recess
- ≥ 0.2m² ventilation area per cylinder[1][2]
- Away from heat source
Cylinders in Enclosure or Recess RULES
NCC 2022 V1
All Building Classes
State Legislation (various States & Territories)
May 2023
AS/NZS 5601.1:2013, J3.4
AS/NZS 1596:2014, 4.4.9
- LP Gas Cylinder installation to AS/NZS 1596AS/NZS 5601.1:2013, J3.4
- Gasfitting work must comply with AS/NZS 5601.1AS/NZS 1596:2014, 4.4.9
- To shelter Cylinders & related equipment only
- Placed on an elevated non-combustible Base
- Prevent accumulation of water
- Not placed directly on soil
- Impervious & Non Combustible Enclosures
- Unobstructed ventilation area at the top and bottom of Enclosure
- ≥ 0.2m² for each opening, per cylinder
AS/NZS 1596:2014, 4.4.9
AS/NZS 5601.1:2013, J3.4
LP Gas Cylinder
- Raised non-combustible solid base[1]
- Does not accumulate water
In Situ Cylinder RULES
NCC 2022 V1
All Building Classes
State Legislation (various States & Territories)
May 2023
AS/NZS 1596:2014, 4.2.3
AS/NZS 1596:2014, 4.2.3
AS/NZS 5601.1:2013, J1
Exchange-fill Cylinder RULES
NCC 2022 V1
All Building Classes
State Legislation (various States & Territories)
May 2023
AS/NZS 5601.1:2013, J1
AS/NZS 1596:2014, 4.2.2
AS/NZS 1596:2014, 4.2.2
Cylinder Regulator RULES
NCC 2022 V1
All Building Classes
State Legislation (various States & Territories)
May 2023
AS/NZS 1596:2014, 4.3.1 (b) (ii)
AS/NZS 1596:2014, 4.3.1
AS/NZS 1596:2014, 4.3.1
AS/NZS 1596:2014, 4.3.1 (ii)
AS/NZS 1596:2014, 4.3.1 (iii)
AS/NZS 1596:2014, 4.3.1 (i)
AS/NZS 5601.1:2013, J3
- LP Gas Cylinder installation to AS/NZS 1596AS/NZS 1596:2014, 4.3.1 (b) (ii)
- Gasfitting work must comply with AS/NZS 5601.1AS/NZS 1596:2014, 4.3.1
- Observe varying legislations within states & territories
- Located to allow gas to return into the cylinder
- PositioningAS/NZS 1596:2014, 4.3.1
- If cylinder is independent of support
- Fix regulator to sturdy support
- Diaphragm positioned vertically
- Vent pointing downwards, or
- If connected directly to valve outlet
- Attach as close as practicable
- For ≥ 400L cylindersAS/NZS 1596:2014, 4.3.1 (ii) with lockable domes
- Discharge
- Arranged to reduce vapour accumulation in Drains, Gutters, and DownpipesAS/NZS 1596:2014, 4.3.1 (iii)
- ≥ 0.5m from any building openingAS/NZS 1596:2014, 4.3.1 (i)
- Vent terminal to prohibit entry of rain and insects
- Away from fixed ignitionAS/NZS 5601.1:2013, J3
- 0.5m above
- 1m laterally
Cylinder Piping RULES
NCC 2022 V2
All Building Classes
State Legislation (various States & Territories)
May 2023
AS/NZS 1596:2014, 4.3.3
AS/NZS 5601.1:2013, J4
AS/NZS 1596:2014, 4.3.3 (a) (i) (B)
AS/NZS 1596:2014, 4.3.3 (a) (i) (C)
AS/NZS 1596:2014, 4.3.3 (a) (i) (C)
AS/NZS 1596:2014, 4.3.3 (a) (ii) (B)
AS/NZS 1596:2014, 4.3.3 (a) (ii) (C)
AS/NZS 1596:2014, 4.3.3 (a) (ii) (D)
- LP Gas Cylinder installation to AS/NZS 1596AS/NZS 1596:2014, 4.3.3
- Gasfitting work must comply with AS/NZS 5601.1AS/NZS 5601.1:2013, J4
- ≤ 1m length, as short as practicable
- Installed where liquid formed can freely return to the cylinder but not flow back to the regulator
- Material
- Annealed copper tube
- Copper Alloy 122 as per standardAS/NZS 1596:2014, 4.3.3 (a) (i) (B)
- ≥ 1.22mm thk WallAS/NZS 1596:2014, 4.3.3 (a) (i) (C)
- Ø 6 or 9mm for industrial or commercial useAS/NZS 1596:2014, 4.3.3 (a) (i) (C), or
- Flexible pigtail
- ≤ 600mm lengthAS/NZS 1596:2014, 4.3.3 (a) (ii) (B)
- Ø 6 or 9mm for industrial or commercial useAS/NZS 1596:2014, 4.3.3 (a) (ii) (C), or
- ≤ 6 years of usage from manufacturing date if non-metallic linedAS/NZS 1596:2014, 4.3.3 (a) (ii) (D)
AS/NZS 1596:2014, 4.4.11 (a)
Cylinder on Verandah
- ≤ 90kg LP gas cylinder[1]
- Open on 3 sides[2]
- Nominally at ground level[3]
Verandah Location RULES
NCC 2022 V1
All Building Classes
State Legislation (various States & Territories)
May 2023
AS/NZS 1596:2014, 4.4.7
AS/NZS 5601.1:2013, J3.3
AS/NZS 1596:2014, 4.4.7 (g)
AS/NZS 1596:2014, 4.4.7 (d)
AS/NZS 1596:2014, 4.4.7 (f)
AS/NZS 1596:2014, 4.4.7 (f)
AS/NZS 1596:2014, 4.4.7 (g)
AS/NZS 1596:2014, 4.4.7 (b)
AS/NZS 1596:2014, 4.4.7 (a)
Cylinder Under a Building
- Where building is supported by piers[1]
- Open on at least 3 sides
- On a solid base such as Concrete or Pavers
Cylinders Under a Building RULES
NCC 2022 V1
All Building Classes
State Legislation (various States & Territories)
May 2023
AS/NZS 5601.1:2013, J3.5
AS/NZS 1596:2014, 4.4.8
AS/NZS 1596:2014, 4.4.8 (c) (i)
AS/NZS 1596:2014, 4.4.8 (c) (ii)
AS/NZS 1596:2014, 4.4.8 (c) (iii)
AS/NZS 5601.1:2013, J3.5 (c) (i)
AS/NZS 5601.1:2013, J3.5 (c) (ii)
AS/NZS 5601.1:2013, J3.5 (c) (iii)
- LP Gas Cylinder installation to AS/NZS 1596AS/NZS 5601.1:2013, J3.5
- Gasfitting work must comply with AS/NZS 5601.1AS/NZS 1596:2014, 4.4.8
- Building supported by Piers
- Between Piers
- At least 3 sides open, orAS/NZS 1596:2014, 4.4.8 (c) (i)AS/NZS 1596:2014, 4.4.8 (c) (ii)
- Enclosure that allows cross-ventilationAS/NZS 1596:2014, 4.4.8 (c) (iii)AS/NZS 5601.1:2013, J3.5 (c) (i), or
- A combination of bothAS/NZS 5601.1:2013, J3.5 (c) (ii)AS/NZS 5601.1:2013, J3.5 (c) (iii)
- Guide discharge of Safety Relief Device away from the building
AS/NZS 1596:2014, 4.4.8
- Where building is supported by piersAS/NZS 1596:2014, 4.4.8
- Open on at least 3 sides
- On a solid base such as Concrete or Pavers