Impact Protected Downpipe Building Codes & Rules


- Protect downpipes from impact and ensure compliance with stormwater NCC standards. Tools™ simplifies NCC guidelines for cost-effective, efficient solutions.


Fall

Eaves Gutter - RCC Requirement

  • ≥ 150mm Half Round profile
  • ≤ 600mm Bracket spacing

Fall

Downpipe Protection - RCC Requirement

  • Circular steel DP
  • Cleat fixed to structure

Downpipes - RCC Requirement

  • 2mm thk & 114.3mm OD
  • Stainless steel
  • Straight, turn down into Outlets
  • ≥ 2hr Hydrostatic Test

Clear of

Flashing

AS/NZS 3500.3:2021, 4.7.2.3

Lap JointsAS/NZS 3500.3:2021, 4.7.2.3

  • ≤ 40mm fixing spacing
  • Lap in direction of flow

HB 39:2015, 5.6 (i)

HB 39:2015, 5.6 (a)

Storm Protection

HB 39:2015, 5.7.6 (h)

≥ 1:25HB 39:2015, 5.7.6 (h)

HB 39:2015, 5.6 (k) (iii)

HB 39:2015, 2.9

HB 39:2015, 2.9

Downpipe Connection

Eaves Gutter

Downpipe

Plumbing Overview

Downpipes


  • Clear of Window & Door operation & other clearances[1]
  • Protect from damage[2]
  • ≥ 100mm clear of Electrical or Gas Line[3]
  • ≥ 50mm clear of any other service[4]


Downpipe & Accessory MATERIALS


NCC 2022 V4


All Building Classes


NCC 2022 F1P3, F1D3 [2019 FP1.3, F1.1]


May 2023



NCC 2022 HP, 3.3.5

AS/NZS 3500.3:2021, 1

AS/NZS 2179.1:2014, 2.6.1

AS/NZS 2179.1:2014, 2.3.2

AS/NZS 2179.1:2014, 2.3.4 (d)

Informative

  • Stormwater Drainage installed to NCC & AS/NZS 3500.3NCC 2022 HP, 3.3.5AS/NZS 3500.3:2021, 1
  • Rainwater Drainage Systems must convey Rainwater to an Outfall
  • 5% Annual Exceedence ProbabilityAS/NZS 2179.1:2014, 2.6.1
  • Percentage chance of a specific rainfall amount (intensity or depth) occurring in a year
  • Stainless SteelAS/NZS 2179.1:2014, 2.3.2
  • 301, 302 or 304 Grade in Mild to Moderate Environments
  • 316 Grade in Severe Industrial, Very Severe Environments
  • 305 Stainless or 400 Alloy Fasteners
  • Aluminium/Zinc alloy coated steelAS/NZS 2179.1:2014, 2.3.4 (d)
  • ≥ AZ150 coating class to AS 1397, or
  • Prepainted to AS/NZS 2728
  • Grade to Manufacturer's Recommendations to suit environmental exposure
  • Class 3 Fasteners
  • Zinc-coatedInformative
  • ≥ Z275 coating class to AS 1397, or
  • Class 3 Fasteners

Bluescope Colorbond GRADES


NCC 2022 V1


AS/NZS 3500.3:2021, 4.5.6 (a) (vi)

AS/NZS 3500.3:2021, 4.5.6 (a) (v)

AS/NZS 3500.3:2021, 4.5.6 (a) (i)

AS/NZS 3500.3:2021, 4.5.6 (a) (iv)

Spreaders


  • ≥ 1.8m beyond spreader[1][2]
  • Seal side laps to corrugated Roof Sheets
  • Fully sark Tiled Roofs
  • Extend foot of DP to keep clear of Flashing[3]
  • 1/2 Cap Ends for cleaning[4]


Spreader RULES


NCC 2022 V2


All Building Classes


NCC 2022 3.3.5, F1P3, F1D3 [2019 3.1.3.5, FP1.3, F1.1]


May 2023



HB 39:2015, 5.7.7

HB 39:2015, 5.7.7

HB 39:2015, 5.7.7

HB 39:2015, 5.7.7 (g)

NCC 2022 HP, 3.3.5

AS/NZS 3500.3:2021, 1

  • Stormwater Drainage installed to NCC & AS/NZS 3500.3HB 39:2015, 5.7.7HB 39:2015, 5.7.7
  • Catchment area of both upper & lower Roof must not exceed Manufacturer's Design Carrying Capacity for the lower Roof
  • Water to be discharged in direction of Roof FallHB 39:2015, 5.7.7
  • Extend Foot of Downpipe to ensure Spreader is clear of FlashingsHB 39:2015, 5.7.7 (g)
  • Must not discharge above ValleysNCC 2022 HP, 3.3.5
  • Corrugated Roof SheetsAS/NZS 3500.3:2021, 1
  • ≥ 1.8m each side from Spreader to be Sealed at Laps for full sheet length
  • Tiled Roof
  • ≥ 1.8m each side from Spreader to be Sarked & turned into the Gutter

HB 39:2015, 5.7.7 (a)

HB 39:2015, 5.7.7 (b)

HB 39:2015, 5.7.7

HB 39:2015, 5.7.7 (f)

HB 39:2015, 5.6

Eaves GutterHB 39:2015, 5.6

  • ≥ 1.2m Bracket spacing
  • ≤ 20m Expansion Joint spacing

HB 39:2015, 5.7.7 (b)

HB 39:2015, 5.7.7 (a)

≥ 1.8mHB 39:2015, 5.7.7 (b)HB 39:2015, 5.7.7 (a)

HB 39:2015, 5.7.6 (d)

≤ 2mHB 39:2015, 5.7.6 (d)

HB 39:2015, 5.7.7 (b)

HB 39:2015, 5.7.7 (a)

≥ 1.8mHB 39:2015, 5.7.7 (b)HB 39:2015, 5.7.7 (a)

HB 39:2015, 5.6 (f)

AS/NZS 3500.3:2021, 4.5.3 (a)

≥ 1:500HB 39:2015, 5.6 (f)AS/NZS 3500.3:2021, 4.5.3 (a)

HB 39:2015, 5.3.2 (k)

AS/NZS 3500.3:2018, 4.7.2.3

≥ 25HB 39:2015, 5.3.2 (k)AS/NZS 3500.3:2018, 4.7.2.3

Industry Recommendation

≥ 2.05mIndustry Recommendation

Stormwater Connection


  • Downpipe with Direct Connection[1]
  • ≥ 75mm unsealed slip joint
  • ≤ 2m from point of entry to Stormwater Drain
  • Open Connection[2]
  • ≥ 40mm clear above grate


Stormwater Connection TYPES


NCC 2022 V5


All Building Classes


NCC 2022 F1P3, F1D3 [2019 FP1.3, F1.1]


May 2023



NCC 2022 HP, 3.3.5

EFSG 2.0

EFSG 2.0

Informative

  • Stormwater Drainage installed to NCCNCC 2022 HP, 3.3.5
  • Rainwater Drainage Systems must convey Rainwater to an Outfall & avoid surface water damaging the BuildingEFSG 2.0
  • 5% AEPEFSG 2.0
  • Percentage chance of a specific rainfall amount (intensity or depth) occurring in a year
  • Surface water must not enter the Building
  • 1% AEP
  • Hardstand & Precast OutletInformative
  • EFSG (NSW Public School) compliant
  • 30° splayed end
  • 40mm clearance
  • Screw fixed Grate
  • Direct Connection
  • Residential / Cottage construction
  • Fall Finished Ground away from Building

Outlet SUPPLIERS


NCC 2022 V2


  • Suitable Products for this use (equal to's allowed)
  • Galvin Engineering Concrete Downpipe Sump Box
  • ≥ 150mm Ø Outlet
  • Screw fixed Grate
  • Others? Please send feedback

HB 39:2015, 5.7.6 (g)

EFSG 2.0

  • Downpipe with Direct ConnectionHB 39:2015, 5.7.6 (g)
  • ≥ 75mm unsealed slip joint
  • ≤ 2m from point of entry to Stormwater Drain
  • Open ConnectionEFSG 2.0
  • ≥ 40mm clear above grate
Redirecting... (5)
Please wait while we redirect you to the correct page.