Water Meter Building Codes & Rules


- Water Meter Tools™ simplifies the National Construction Code (NCC) with interactive graphics, including deemed to comply & best practices.


Backflow Prevention Device if required

Water Meter

Industry Recommendation

Location & OrientationIndustry Recommendation

  • Must be installed to the direction of flow

(Meter incapable of recording reverse flow)

  • Locate close to the water extraction point
  • Easily accessible for reading & maintenance
  • Consider garden level & fence location

Do not locate inside

  • The building
  • Garage
  • Ceiling space
  • A kitchen sink / cupboard

Side Boundary

Industry Recommendation

Impact ProtectionIndustry Recommendation

  • Tamper proof
  • Safety bollards where applicable
  • If in a cage or a pit
  • With trafficable cast iron or plastic lid
  • 500mm away from power pillar
  • Must be approved by the Water Authority
  • Located ≥ 600mm from any driveway

Industry Recommendation

InstallationIndustry Recommendation

  • Above or below ground depending on site conditions
  • Meter assembled horizontally
  • Not installed on a vertical or sloping pipe
  • Pipework, Valves, & Fittings of approved metallic material, colour & in accordance with AS/NZS 3500
  • Manufacturer’s serial number clearly visible
  • For multiple installations, each meter must be clearly identified with a durable label

Adaptor

Drinking Water Main Tap

Polyethylene Pipe

Adaptor

Ball

Valve

Recycled Water

Front Boundary

Finished Ground Level

Compacted

Pipe Overlay

Compacted Pipe Bedding

Haunch Support

To Water Main

Meter Stop

Right Angle Valve

To Building

Cover

Clearance

- copy

Copper Riser

Copper Riser

- copy

Clearance

Clearance

Industry Recommendation

Distance between unions to

Authority RequirementsIndustry Recommendation

Private Sub-Meter (Flow Meter)



Industry Recommendation

MaintenanceIndustry Recommendation

  • Keep safe access & free from
  • Grease, oil, fumes & hazardous materials
  • Overgrown vegetation
  • Dangerous equipment
  • Guarantee accuracy & clarity of the meter display

Industry Recommendation

≥ 300Industry Recommendation

Industry Recommendation

Mains ConnectionIndustry Recommendation

  • Excavation to Authority requirements

AS/NZS 3500.1:2021, 5.11

≥ 75AS/NZS 3500.1:2021, 5.11

AS/NZS 3500.1:2021, 5.10

CAS/NZS 3500.1:2021, 5.10

Industry Recommendation

Copper Riser PipeIndustry Recommendation

  • 6mm Clearance all round

AS/NZS 3500.1:2021, 5.11

≥ 75AS/NZS 3500.1:2021, 5.11

AS/NZS 3500.1:2021, 5.11

≥ 75AS/NZS 3500.1:2021, 5.11

AS/NZS 3500.1:2021, 5.11

≥ 75AS/NZS 3500.1:2021, 5.11

Industry Recommendation

≥ 1.2mIndustry Recommendation

Industry Recommendation

90°Industry Recommendation

Industry Recommendation

≥ 300Industry Recommendation

Industry Recommendation

300 to 600Industry Recommendation

Industry Recommendation

300 to 2mIndustry Recommendation

Industry Recommendation

150

to

300Industry Recommendation

Industry Recommendation

≥ 300Industry Recommendation

Proximity of Services


  • Ensure minimum distances between services[1]
  • Underground services to be identified accordingly with marker tape[2]


Underground Separation


NCC 2022 V2


All Building Classes


NCC 2022 Vol 3 Sec B


May 2023



NCC 2022 Vol 3, B1D1 (1)

AS/NZS 3500.1:2021, 15.3

Water Services installed to NCC Volume 3 Section B & AS/NZS 3500.1NCC 2022 Vol 3, B1D1 (1)AS/NZS 3500.1:2021, 15.3

AS/NZS 3500.1:2021, 5.3

AS/NZS 3500.1:2021, 5.3

Cover, Bedding & Backfill


  • Carefully position the pipes into proper alignment within trench[1]
  • Surround pipes with ≥ 75mm[2]
  • Compacted sand, or
  • Fine-grade soil


Backfill RULES


NCC 2022 V2


All Building Classes


NCC 2022 Vol 3 Sec B


May 2023



AS/NZS 3500.1:2021, 5.10

NCC 2022 Vol 3, B1D1 (1)

Bedding RULES


NCC 2022 V2


All Building Classes


NCC 2022 Vol 3 Sec C


May 2023



AS/NZS 3500.2:2021, 5.4.2

AS/NZS 3500.2:2021, 5.4.2 (d)

AS/NZS 3500.2:2021, 5.4.2 (c)

Filling Material for Drain Pipe to beAS/NZS 3500.2:2021, 5.4.2

  • 7 to 10mm gravel or crushed rocks, or
  • 1:4 (Portland cement : sand) workable Cement Mortar consistency, or
  • Cement Mortar Bedding with > 1:5 slope (for rock & shale bases)AS/NZS 3500.2:2021, 5.4.2 (d)
  • ≥ 50mm depth below barrel of pipe
  • ≥ 75mm wide
  • ≥ 20mm away from flexible joints
  • ≤ 1.5m CTS Pipe Supports prior to mortar bedding
  • Or sift sand through 2mm sieve without clay & organic materialsAS/NZS 3500.2:2021, 5.4.2 (c)