NCC 2022 to 2025 Changes Building Codes & Rules


- Stay ahead of the NCC 2025 changes with Tools™. Simplify building codes, improve compliance, and ensure high-quality construction with updated guidelines.


Waterproofing


  • Part F3 (External Roof & Wall Cladding) merged into F1 (Surface Water Management, Rising Damp & External Waterproofing)
  • Grades, Setdowns, Hobs & Membranes to external concrete structures


External Waterproofing & Drainage


NCC 2025 V1


NCC 2025 Vol 1, F1D4 (1)

NCC 2025 Vol 1, F1D4 (2)

NCC 2025 Vol 1, F1D5 (2)

NCC 2025 Vol 1, F1D5 (1)

NCC 2025 Vol 1, F1D6

NCC 2025 Vol 1, F1D4

NCC 2025 Vol 1, F1D10

  • ≥ 1:80 grade to Drainage Point in the Structural Substrate to a concrete Roof, Balcony etcNCC 2025 Vol 1, F1D4 (1)
  • The Drainage Point must be connected to Stormwater
  • The membrane must be applied to the structural substrate
  • Planter boxes may still use screeds to achieve localised fallsNCC 2025 Vol 1, F1D4 (2)
  • ≥ 70mm Setdown from internal floor & Integral Hob to the perimeter of a concrete Roof, Balcony, Podium etcNCC 2025 Vol 1, F1D5 (2)
  • The Structural Substrate to any Roof, Balcony, Podium etc must be
  • Concrete, or Fibrecement SheetNCC 2025 Vol 1, F1D5 (1), &
  • Smooth & clean to accept a MembraneNCC 2025 Vol 1, F1D6
  • Exposed Joints in concrete structures must beNCC 2025 Vol 1, F1D4
  • Located at high points &
  • ≥ 50mm Hob to both sides of Joint
  • Surface finishes must be free draining or directly fixed to the MembraneNCC 2025 Vol 1, F1D10
  • Part F3 (External Roof & Wall Cladding) merged into F1 (Surface Water Management, Rising Damp & External Waterproofing)
  • Grades, Setdowns, Hobs & Membranes to external concrete structures

Fire


  • Carparks to have open deck & other concessions removed
  • Exit Lighting to Include Hybrid type photoluminescent exit signs[1]
  • Fire Hazard Property improvements to allow assessment of a similar tested product[2]
  • Fire Isolated Exits with clearer re-entry into building


Fire Sprinklers in Carparks


NCC 2025 V1


NCC 2025 Vol 1, E1D9

NCC 2025 Vol 1, S5C19

NCC 2025 Vol 1, S5C22

NCC 2025 Vol 1, S5C19

D3D27 Re-entry from Fire Isolated Exits


NCC 2025 V1


NCC 2025 Vol 1, D3D27

  • In any Storey ≥ 25m Effective Height, re-entry to all floors must be allowedNCC 2025 Vol 1, D3D27
  • Building Class 2, 3, 6, 7a & 9
  • All doors require a Fail-safe unlock when Fire Alarm activated
  • Every ≥ 4 Floors must always be unlocked
  • Signage & or Intercommunication / alarm system to doors on at least every 2nd Storey & must guide a person to the unlocked door from within the enclosure

NCC 2025 Vol 1, E4D8 (a)

NCC 2025 Vol 1, A5G6

  • Carparks to have open deck & other concessions removed
  • Exit Lighting to Include Hybrid type photoluminescent exit signsNCC 2025 Vol 1, E4D8 (a)
  • Fire Hazard Property improvements to allow assessment of a similar tested productNCC 2025 Vol 1, A5G6
  • Fire Isolated Exits with clearer re-entry into building

Comfort


  • Condensation
  • Climate zone-specific revisions to Membrane permeability
  • Drained & Ventilated Cavities to Zones 6 -8
  • Energy Efficiency
  • Building Class 2 & 4 DTS solution for Centralised Hot Water[1]
  • Thermal
  • Updated Thermal requirements


HP 10.8.3 & 4 Roof Ventilation


NCC 2025 V1


NCC 2025 HP, 10.8.3 (1)

NCC 2025 HP, 10.8.4

NCC 2025 Vol 1, F8D5 (1)

NCC 2025 Vol 1, F8D6

HP 13.2.3 & 13.2.5 - Thermal Breaks


NCC 2025 V1


NCC 2025 HP, 13.2.5 (6)

NCC 2025 HP, 13.2.5 (5)

J4 Building Fabric


NCC 2025 V1


NCC 2025 Vol 1, J4D4 (1)

NCC 2025 Vol 1, J4D4 (2)

NCC 2025 Vol 1, J4D4 (3)

NCC 2025 Vol 1, J4D3 (1)

HP 10.8.1 External Walls


NCC 2025 V1


NCC 2025 HP, 10.8.1 (2)

NCC 2025 HP, 10.8.1 (2)

AS 4200.1:2017, 5.3.4

NCC 2025 Vol 1, F8D3

NCC 2025 Vol 1, F8D3

NCC 2025 Vol 1, J3D14 (4)

  • Condensation
  • Climate zone-specific revisions to Membrane permeability
  • Drained & Ventilated Cavities to Zones 6 -8
  • Energy Efficiency
  • Building Class 2 & 4 DTS solution for Centralised Hot WaterNCC 2025 Vol 1, J3D14 (4)
  • Thermal
  • Updated Thermal requirements

Informative

Informative NoteInformative

  • This Tool is a summary of the NCC 2025 Public Comment Draft, as such
  • Tools™ has focused on DTS updates
  • Performance Requirements & Verification Methods are not included

Access


  • Referenced Document Updated to AS 1428.1:2021


  • Referenced Document Updated to AS 1428.1:2021

Services


  • Electrical switchboard & EV provision - Class 1
  • Additional capacity
  • Energy
  • Encourages conversion from Gas to Electric
  • Mandatory on-site energy generation
  • Cost-effective DTS updates
  • Additional Facilities for Women
  • Plumbing
  • Updates to Cross-connection Control Provisions[1]
  • Updates to Rainwater Storage & Contamination Control[2][3][4][5]


J9D4 & J9D5 Energy Efficiency Class 2 - 9


NCC 2025 V1


  • EV charging
  • Updated power wiring, distribution & capacity to serve a percentage of spaces
  • Solar PV & Batteries
  • 100% PV coverage of practical Roof Area
  • Minimum PV output (W / m²) for conditioned spaces

HP 13.7.10 & 11 - Electrical Supply


NCC 2025 V1


NCC 2025 HP, 13.7.10

NCC 2025 HP, 13.7.11

  • ≥ 8 empty single phase Circuit Breaker Slots provided if Gas is used for any servicesNCC 2025 HP, 13.7.10
  • ≥ 4 if Electric Space Heating, Hot Water or Cooker uses 1 or more of the above minimum
  • ≥ 32 A supply from Main Switchboard if in a secondary Switchboard
  • ≥ 1 off 32 A single phase circuit to 1 car spaceNCC 2025 HP, 13.7.11
  • ≥ 6mm² cross sectional area Active Conductor
  • ≥ 15 A socket or EV Charger installed

F4D4 Bathroom Facilities


NCC 2025 V1


NCC 2025 Vol 1, F4D4 (6)

NCC 2025 Vol 1, F4D4

NCC 2025 Vol 1, B5D7

NCC 2025 Vol 3, B7D4

NCC 2025 Vol 3, B7D5

NCC 2025 Vol 3, B7D6

NCC 2025 Vol 3, B7D7