- Stay ahead of the NCC 2025 changes with Tools™. Simplify building codes, improve compliance, and ensure high-quality construction with updated guidelines.
Waterproofing
Part F3 (External Roof & Wall Cladding) merged into F1 (Surface Water Management, Rising Damp & External Waterproofing)
Grades, Setdowns, Hobs & Membranes to external concrete structures
External Waterproofing & Drainage
NCC 2025 V1
NCC 2025 Vol 1, F1D4 (1)
NCC 2025 Vol 1, F1D4 (2)
NCC 2025 Vol 1, F1D5 (2)
NCC 2025 Vol 1, F1D5 (1)
NCC 2025 Vol 1, F1D6
NCC 2025 Vol 1, F1D4
NCC 2025 Vol 1, F1D10
≥ 1:80 grade to Drainage Point in the Structural Substrate to a concrete Roof, Balcony etcNCC 2025 Vol 1, F1D4 (1)
The Drainage Point must be connected to Stormwater
The membrane must be applied to the structural substrate
Sprinklered Carparks below another Building Class in Type A Construction buildingsNCC 2025 Vol 1, S5C19
D3D27 Re-entry from Fire Isolated Exits
NCC 2025 V1
NCC 2025 Vol 1, D3D27
In any Storey ≥ 25m Effective Height, re-entry to all floors must be allowedNCC 2025 Vol 1, D3D27
Building Class 2, 3, 6, 7a & 9
All doors require a Fail-safe unlock when Fire Alarm activated
Every ≥ 4 Floors must always be unlocked
Signage & or Intercommunication / alarm system to doors on at least every 2nd Storey & must guide a person to the unlocked door from within the enclosure
NCC 2025 Vol 1, E4D8 (a)
NCC 2025 Vol 1, A5G6
Carparks to have open deck & other concessions removed