Waffle Raft Slab Building Codes & Rules


- Learn how to build efficient concrete slabs on poor-quality soils with these expert tips on reinforcement, drainage, and slab joints, all simplified with Tools™


Pier

Waffle Pod

AS 2870:2011, 3.4.1

≤ 1.09mAS 2870:2011, 3.4.1

Vapour Barrier

Sand Blinding

Edge Rebate

Edge Beam

Finished Concrete Floor Level

Timber Frame

Waffle Pod

Waffle Pod

AS 2870:2011, 3.4.1

20AS 2870:2011, 3.4.1

Masonry Veneer

Loadbearing Wall

Full Sarking

Clad Frame

Flashing

Soil

- copy

AS 2870:2011, 3.4.2

110AS 2870:2011, 3.4.2

Soil

Loadbearing Wall

AS 2870:2011, 3.4.1

≤ 1.09mAS 2870:2011, 3.4.1

AS 2870:2011, 3.4.1

85AS 2870:2011, 3.4.1

Industry Recommendation

≥ 450Industry Recommendation

AS 2870:2011, 3.4.2

150AS 2870:2011, 3.4.2

AS 2870:2011, 3.4.2

110AS 2870:2011, 3.4.2

Masonry Veneer

AS 2870:2011, 3.4.1

DAS 2870:2011, 3.4.1

AS 2870:2011, 3.4.1

≥ 300AS 2870:2011, 3.4.1

AS 3660.1:2014, 4.4

≥ 75AS 3660.1:2014, 4.4

Concrete Benchmark

Concrete Mix


  • N20 Grade to AS 1379[1]
  • ≥ 20 Mpa strength at 28 days[2]
  • ≤ 20mm aggregate size[3]
  • 100mm slump[4]
  • Properly compacted[5]


Concrete Mix RULES


NCC 2022 V4


All Building Classes


NCC 2022, 4.2.10 [2019 3.2.3.1]



May 2023



NCC 2022 HP, 4.2.10

  • Concrete to comply with NCCNCC 2022 HP, 4.2.10
  • Mixing & Delivery
  • ≤ 1 ½ hrs complete discharge from Concrete truck upon Cement hydration unless a retarder is used
  • Compaction by vibration
  • To remove air pockets
  • Improve contact with Reinforcement & Formwork
  • Enhance durability
  • Avoid over-vibrating
  • Slab Edges
  • Proper finishing & curing of edges improves resistance to moisture damage
  • Chemical Curing
  • Determine if surface finish adhesive to be used is compatible with chemical curing methods

NCC 2022 HP, 4.2.10 (a) (i)

NCC 2022 HP, 4.2.10 (a) (ii)

NCC 2022 HP, 4.2.10 (a) (iii)

NCC 2022 HP, 4.2.10 (c)

AS 2870:2011, 5.3.1

Termite Management


  • Termite control required for Ground Level floor junctions
  • ≥ 75mm slab exposure above the external finished floor level to allow easy detection of termites[1]


Durable Notice RULES


NCC 2022 V1


All Building Classes


NCC 2022, 3.4.3


May 2023



NCC 2022 HP, 3.4.3

NCC 2022 HP, 3.4.3

NCC 2022 HP, 3.4.3 (a)

NCC 2022 HP, 3.4.3 (b)

NCC 2022 HP, 3.4.3 (c)

NCC 2022 HP, 3.4.3 (d)

Termite RISK


NCC 2022 V3


Class 1 & 10


NCC 2022, H1D3 & HP3.4.1 [2019 3.1.4.2]


May 2023



NCC 2022 HP, 3.4.1(2)

NCC 2022 HP, 3.4.1 (1) (b)

NCC 2022 HP, 3.4.1

  • Termite Management System Required ifNCC 2022 HP, 3.4.1(2)
  • Location is identified at Risk of Attack, &
  • Any Primary Building Element is susceptible
  • Primary Building Elements areNCC 2022 HP, 3.4.1 (1) (b)
  • Any member designed to take Loads
  • Wall, Roof, Ceiling, Floor, Ramp or Stair Framing
  • Any bracing or other framing members
  • Materials not susceptible to attackNCC 2022 HP, 3.4.1
  • Metals
  • Concrete
  • Masonry
  • Fibre-reinforced Concrete
  • Naturally resistant Timber
  • Preservative-treated Timber

Termite MANAGEMENT


NCC 2022 V5


Class 1 & 10


NCC 2022 H1D3 & HP3.4.2 [2019 3.1.4.3]


May 2023



NCC 2022 HP, 3.4.2

AS 3660.1:2014, 4.4

NCC 2022 Vol 2, H1D3

  • Termite Management compliant to the NCCNCC 2022 HP, 3.4.2
  • Inspection ZoneAS 3660.1:2014, 4.4NCC 2022 Vol 2, H1D3
  • ≥ 75mm exposed Concrete Face
  • Smooth surface, free of Ripples or Honeycombing
  • Tiling, Render, Vapour Barrier, Flashings, Structures & the like, not allowed to bridge this Zone

AS 3660.1:2014, 4.4

  • Termite control required for Ground Level floor junctions
  • ≥ 75mm slab exposure above the external finished floor level to allow easy detection of termitesAS 3660.1:2014, 4.4

Concrete Cover


  • ≥ 30mm over membrane[1]
  • ≥ 40mm unprotected ground[2]
  • ≥ 20mm internal surface[3]
  • ≥ 40mm external exposure[4]


Concrete COVER


NCC 2022 V5


All Building Classes


NCC 2022 4.2.11 [2019 3.2.3.2]


May 2023



AS 3600:2018, 4.10.3.2

AS 3600:2018, 4.3.1 (c)

NCC 2022 HP, 4.2.11

NCC 2022 HP, 4.2.11 (5) (b)

NCC 2022 HP, 4.2.11 (5) (a)

NCC 2022 HP, 4.2.11 (5) (c)

NCC 2022 HP, 4.2.11 (5) (d)

Reinforcement


  • ≤ 800mm Bar Chair spacing[1]
  • Top & bottom Bars of equal size & specification[2]
  • Fix Ties to prevent movement[3]


Waffle Raft Reinforcement RULES


NCC 2022 V4


All Building Classes


NCC 2022 4.2 [2019 3.2]


May 2023



AS 2870:2011, 3.4.3

AS 2870:2011, 3.4.3

  • Construction of Footings & Slabs to comply with NCC
  • Top & bottom Bars of the same size & specificationAS 2870:2011, 3.4.3
  • Waffle Raft Beams with
  • > 150mm Stem Width, to add Reinforcement according to Table below (Additional Reinforcement)AS 2870:2011, 3.4.3

Chair RULES


NCC 2022 V3


All Building Classes


NCC 2022, 4.2.11 [2019:3.2.3.2]


May 2023



NCC 2022 HP, 4.2.11 (7) (e)

NCC 2022 HP, 4.2.11 (7) (a)

NCC 2022 HP, 4.2.11 (7) (b)

NCC 2022 HP, 4.2.11 (7) (b)

NCC 2022 HP, 4.2.11

NCC 2022 HP, 4.2.11 (7) (e)

NCC 2022 HP, 4.2.11 (7) (a)

AS 2870:2011, 3.4.3

Vapour Barrier


  • Continuous under Beams & Pods[1]
  • Turn up to Ground Level at Slab Edges[2]
  • Protect from & repair any punctures[3]


Moisture Control


NCC 2022 V1


All Building Classes


NCC 2022, F1D7 & Part 4.2.8 [2019 F1.10, 3.2.2.6]


May 2023



AS 2870:2011, 5.3.3.2 (a)

AS 2870:2011, 5.3.3.2 (a) (i)

AS 2870:2011, 5.3.3.2 (a) (ii)

AS 2870:2011, 5.3.3.4 (b)

AS 2870:2011, 5.3.3.4 (a)

AS 2870:2011, 5.3.3.4 (c)

NCC 2022 HP, 4.2.8

NCC 2022 Vol 1, F1D7

AS 2870:2011, 5.3.3.4 (a)

AS 2870:2011, 5.3.3.4 (a)

AS 2870:2011, 5.3.3.3 (c)

Pier


  • For M or H Sites[1]
  • Each 3rd internal Beam intersection[2]


Pier RULES


NCC 2022 V3


All Building Classes


NCC 2022 H1D4 & 4.2 [2019 3.2]


May 2023



AS 2870:2011, 3.4.5

AS 2870:2011, 3.4.5 (a)

AS 2870:2011, 3.4.5 (b)

AS 2870:2011, 3.4.5 (b)

NCC 2022 Vol 2, H1D4

AS 2870:2011, 3.4.5 (a)

AS 2870:2011, 3.4.5