Insulation Building Codes & Rules


- Enhance building comfort with Tools™! View thermal insulation rules with NCC compliance, including climate zone R-values, and more, for efficient construction.


Windows


  • Must be sealed to restrict air infiltrations[1]


Window SEALING


NCC 2022 V2


Class 1 & 10a


NCC 2022 Part 13.4.4 [2019: 3.12.3.3]


May 2023



NCC 2022 HP, 13.4.4 (1) (a)

NCC 2022 HP, 13.4.4 (1) (b)

NCC 2022 HP, 13.4.4 (2) (a)

NCC 2022 HP, 13.4.4 (2) (b)

NCC 2022 HP, 13.4.4 (3)

NCC 2022 HP, 13.4.4 (2)

NCC 2022 HP, 13.2.5 NT (2) (c) (ii)

≥ 15°NCC 2022 HP, 13.2.5 NT (2) (c) (ii)

NCC 2022 HP, 13.2.5 NT (2) (d) (iii)

NT - Fully Shaded Wall

NCC 2022 HP, 13.2.2 (1) (b)

Bulkheads

Attached Garage


null


null

Roof


  • Lighter colour require less insulation[1]
  • Thermal Break
  • R ≥ 0.2 in between Metal parts[2]
  • Climate Zones 1 to 5
  • ≤ 0.64 Solar Absorptance[3]


Roof Reflective Insulation RULES


NCC 2022 V1


Class 1 & 10a


NCC 2022 Part 13.2.3 [2019: 3.12.1.2]


May 2023



NCC 2022 HP, 13.2.3 (2) (a)

NCC 2022 HP, 13.2.3 (2) (b)

NCC 2022 HP, 13.2.3 (2) (c)

NCC 2022 HP, 13.2.3 (8)

NCC 2022 HP, 13.2.3 (1)

Metal-Framed Roof Thermal Bridging Methods


NCC 2022 V1


Class 1 & 10a


NCC 2022 HP Part 13.2.3 [2019: 3.12.1.2]


May 2023



NCC 2022 HP, 13.2.3 (8)

NCC 2022 HP, 13.2.3 (3) (a)

NCC 2022 HP, 13.2.3 (3) (b)

  • Pitched Roof with Horizontal CeilingNCC 2022 HP, 13.2.3 (8)
  • Achieve Total R-Value, or
  • R 0.5 additional Insulation between Frames from Roof & Ceiling Insulation ≥ R-Value, or
  • ≥ R 0.13 add Continuous Insulation Layer above or below the Ceiling Joists or Truss Bottom Chords, or
  • R 0.5 top layer should be positioned to cover the Metal parts when stacking Insulation
  • Flat, Skillion, or Cathedral RoofNCC 2022 HP, 13.2.3 (3) (a)
  • Achieve Total R-Value, or
  • Comply with Thermal Bridging Mitigation
  • Rules above does not apply to Roofs constructed using insulated sandwich panelsNCC 2022 HP, 13.2.3 (3) (b)

Bulk Insulation RULES


NCC 2022 V1


Class 1 & 10a


NCC 2022 HP 13.2.2 [2019: 3.12.1.1]


May 2023



NCC 2022 HP, 13.2.2 (3) (a)

NCC 2022 HP, 13.2.2 (3) (b)

Reducing Roof & Ceiling Insulation Near External Walls


NCC 2022 V1


Class 1 & 10a


NCC 2022 HP Part 13.2.3 [2019:3.12.1.2]


May 2023



NCC 2022 HP, 13.2.3 (8)

NCC 2022 HP, 13.2.3 (6)

NCC 2022 HP, 13.2.3 (1)

NCC 2022 HP, 13.2.3 (2)

NCC 2022 HP, 13.2.3 (3)

NCC 2022 HP, 13.2.3 (4)

NCC 2022 HP, 13.2.3 (5)

Compensating for Reduced Ceiling Insulation RULES


NCC 2022 V1


Class 1 & 10a


NCC 2022 HP Part 13.2.3 [2019: 3.12.1.2]


May 2023



NCC 2022 HP, 13.2.3 (5)

NCC 2022 HP, 13.2.3 (8)

  • Compensate when a Ceiling insulation is reduced due to functional elements or safety concerns using Adjusted Ceiling Insulation R-ValueNCC 2022 HP, 13.2.3 (5)
  • Rules above does not apply to Roofs constructed using insulated sandwich panelsNCC 2022 HP, 13.2.3 (8)

Roof & Ceiling Insulation RULES


NCC 2022 V3


Class 1 & 10a


NCC 2022 Part 13.2.3 [2019: 3.12.1.2]


May 2023



NCC 2022 HP, 13.2.3 (1)

  • Roof & Ceiling insulation to comply with a minimum R-ValueNCC 2022 HP, 13.2.3 (1)requirement according to type of construction, Climate Zone, Roof type & number of storey
  • Pitched Roof with Horizontal Ceiling
  • Flat, Skillon or Cathedral Roof
  • Metal-framed Pitched Roof

Metal Roof Thermal Break Requirement RULES


NCC 2022 V1


Class 1 & 10a


NCC 2022 HP Part 13.2.3 [2019:3.12.1.2]


May 2023



NCC 2022 HP, 13.2.3 (7)

NCC 2022 HP, 13.2.3 (7) (a)

NCC 2022 HP, 13.2.3 (7) (b)

NCC 2022 HP, 13.2.3 (8)

Roof Insulated Sandwich Panels RULES


NCC 2022 V1


Class 1 & 10a


NCC 2022 HP Part 13.2.3 [2019: 3.12.1.2]


May 2023



NCC 2022 HP, 13.2.3 (9)

  • Achieve minimum Total R-ValueNCC 2022 HP, 13.2.3 (9) for Roof constructed with Insullated Sandwich Panels according to the Table below

NSW 2023 BASIX, Energy

NCC 2022 HP, 13.2.3 (7) (b)

NCC 2022 HP, 13.2.3 (9)

Building Sealing

Concrete Slab



Insulation for Slab on Ground RULES


NCC 2022 V5


Class 1 & 10a


NCC 2022 HP 13.2.6 [2019: 3.12.1.5]


May 2023



NCC 2022 HP, 13.2.6 (5)

NCC 2022 HP, 13.2.6 (5) (a) (i)

NCC 2022 HP, 13.2.6 (5) (a) (ii)

NCC 2022 HP, 13.2.6 (5) (b) (i)

NCC 2022 HP, 13.2.6 (5) (b) (ii)

NCC 2022 HP, 13.2.6 (4)

NCC 2022 HP, 13.2.6 (6) (b) (i)

NCC 2022 HP, 13.2.6 (6) (b) (ii)

NCC 2022 HP, 13.2.6 (6) (a)

NCC 2022 HP, 13.2.6 (6) (b)

NCC 2022 HP, 13.2.6 (7)

Metal-Framed Floor Thermal Bridging Methods


NCC 2022 V1


Class 1 & 10a


NCC 2022 HP 13.2.6 [2019: 3.12.1.5]


May 2023



NCC 2022 HP, 13.2.6 (3) (a)

NCC 2022 HP, 13.2.6 (3) (b)

Floor Insulation RULES


NCC 2022 V1


Class 1 & 10a


NCC 2022 Part 13.2.6 [2019: 3.12.1.5]


May 2023



NCC 2022 HP, 13.2.6 (1)

  • Achieve minimum R-Value of Floor insulation where the Floor is over an Unenclosed Space according to type of Climate ZonesNCC 2022 HP, 13.2.6 (1)

Floor & Subfloor Wall Insulation Climate Zone 4, 5, 6, 7 & 8 RULES


NCC 2022 V3


Class 1 & 10a


NCC 2022 Part 13.2.6 [2019: 3.12.1.5]


May 2023



NCC 2022 HP, 13.2.6 (2)

NCC 2022 HP, 13.2.6 (2) (d)

NCC 2022 HP, 13.2.6 (2) (e)

NCC 2022 HP, 13.2.6 (2) (f)

NCC 2022 HP, 13.2.6 (2) (g)

NCC 2022 HP, 13.2.6 (2) (h)

Wall


  • Climate Zones 1 to 5
  • ≤ 0.7 Solar Absorptance[1]
  • Climate Zone 3
  • R ≥ 1.5[2]


Insulation for External Lighweight Construction Walls RULES


NCC 2022 V1


Class 1 & 10a


NCC 2022 Part 13.2.5 [2019: 3.12.1.4]


May 2023



NCC 2022 HP, 13.2.5 (2)

  • External Wall in Lightweight construction to have minimum R-ValueNCC 2022 HP, 13.2.5 (2) requirement according to Climate Zone, Solar Absorption, Overhang, Wall Height & number of Storeys

Metal-framed Wall Thermal Break Requirement RULES


NCC 2022 V1


Class 1 & 10a


NCC 2022 HP Part 13.2.5 [2019: 3.12.1.4]


May 2023



NCC 2022 HP, 13.2.5 (5)

NCC 2022 HP, 13.2.5 (5) (a)

NCC 2022 HP, 13.2.5 (5) (b)

NCC 2022 HP, 13.2.5 (5) (b)

NCC 2022 HP, 13.2.5 (5)

NCC 2022 HP, 13.2.5 (6)

Metal-Framed Wall Thermal Bridging Methods


NCC 2022 V3


Class 1 & 10a


NCC 2022 Part 13.2.5 [2019: 3.12.1.4]


May 2023



NCC 2022 HP, 13.2.5 (4) (b)

NCC 2022 HP, 13.2.5 (4)

  • Thermal Bridging in a Metal-framed wall to be achieved according to type of constructionNCC 2022 HP, 13.2.5 (4) (b)
  • Concrete Block Walls with Internal Lining
  • Lightweight Construction
  • Masonry Veneer, or
  • Choose one of the pre-defined solutions for External Wall for Thermal Bridging MitigationNCC 2022 HP, 13.2.5 (4)

Insulation for External Walls RULES


NCC 2022 V1


Class 1 & 10a


NCC 2022 HP 13.2.5 [2019: 3.12.1.4]


May 2023



NCC 2022 HP, 13.2.5 (1)

  • Wall insulation to comply with a minimum R-ValueNCC 2022 HP, 13.2.5 (1) requirement according to Climate Zone, Solar Absorption, Overhang, Wall Height & number of Storeys, excluding
  • External walls of sub-floor space
  • Lightweight Wall constructions

NCC 2022 HP, 13.2.5 (3)

NCC 2022 HP, 13.2.5 (1) (c)

Roof Light


  • ≤ 5% of served room Floor Area[1][2]
  • Light-transmitting elements
  • Total System Performance of SHGC[3][4]
  • ≤ U3.9 U-Value[5][6]


Roof Light Building Sealing Energy Efficiency RULES


NCC 2022 V4


All Building Classes


NCC 2022 HP 13.2.4 & J4D5 [2019: 3.12.1.3 & J1.3]


May 2023



NCC 2022 HP, 13.4.3 (1)

NCC 2022 HP, 13.2.4 (a)

NCC 2022 HP, 13.2.4 (b) (ii)

NCC 2022 HP, 13.2.4 (b) (i)

NCC 2022 Vol 1, J4D5 (a)

NCC 2022 Vol 1, J4D5 (b) (ii)

NCC 2022 Vol 1, J4D5 (b) (i)

NCC 2022 HP, 13.2.4 (a)

NCC 2022 HP, 13.2.4 (b) (i)

NCC 2022 HP, 13.2.4 (b) (ii)

NCC 2022 Vol 1, J4D5 (a)

NCC 2022 Vol 1, J4D5 (b) (i)

NCC 2022 Vol 1, J4D5 (b) (ii)

Subfloor


  • Climate Zone 1[1]
  • R ≥ 1.5
  • Climate Zone 2[2]
  • R 0.5 to 1.5 (Refer to table)
  • Climate Zone 3[3]
  • R ≥ 0.5


Subfloor Wall Insulation Climate Zone 1, 2 & 3 RULES


NCC 2022 V1


1 & 10a


NCC 2022 Part 13.2.6 [2019: 3.12.1.5]


May 2023



NCC 2022 HP, 13.2.6 (2) (a)

NCC 2022 HP, 13.2.6 (2) (b)

NCC 2022 HP, 13.2.6 (2) (c)

Floor & Subfloor Wall Insulation Climate Zone 4, 5, 6, 7 & 8 RULES


NCC 2022 V3


Class 1 & 10a


NCC 2022 Part 13.2.6 [2019: 3.12.1.5]


May 2023



NCC 2022 HP, 13.2.6 (2)

NCC 2022 HP, 13.2.6 (2) (d)

NCC 2022 HP, 13.2.6 (2) (e)

NCC 2022 HP, 13.2.6 (2) (f)

NCC 2022 HP, 13.2.6 (2) (g)

NCC 2022 HP, 13.2.6 (2) (h)

NCC 2022 HP, 13.2.6 (2) (a)

NCC 2022 HP, 13.2.6 (2) (b)

NCC 2022 HP, 13.2.6 (2) (c)

Redirecting... (5)
Please wait while we redirect you to the correct page.