Excavated Basement Building Codes & Rules


- Excavated Basement Tools™ simplifies the National Construction Code (NCC) with interactive graphics, including deemed to comply & best practices.


Floor system

Sand Blinding

Sock

Vapour Barrier

FW

Free draining backfill

Filter Fabric

Drainage Cell

Free draining bed

AS/NZS 3500.3:2021, L

Agg DrainAS/NZS 3500.3:2021, L

  • Slotted PVC preferred
  • Clean out at high points
  • No lower than base of footing
  • Gravity connection to stormwater or sub-floor drainage / pump out sump
  • Separate from roof or other stormwater systems

Agg Drain

Fall

AS/NZS 2890.1:2004, 2.4.6.2

1 : 200AS/NZS 2890.1:2004, 2.4.6.2

Stormwater Pit

  • Heel guard type if subject to foot traffic

1 : 300

Reinforced Wall

Fall to Pit

Cover Angle (optional)

Lining a Habitable Room

  • H3 Timber Battens where in contact with wall
  • Insulation that won't hold moisture
  • Foam or Rigid board type
  • Fibre-cement lining to resist flood damage

M

M

Membrane

Protection Board

Cavity Closer

DPC / Flashing

Fall

M

50

Industry Recommendation, -

100Industry Recommendation, -

Gravel

Water Bar

1 : 100

1 : 100

Fall

Finished Ground


  • ≥ 150mm[1] to earth
  • ≥ 75mm[2] to hardstand
  • ≥ 50mm[3] to sheltered hardstand


DPC Ground CLEARANCE


NCC 2022 V2


All Building Classes


NCC 2022 HP 5.7.4 [2019: 3.3.5.8]


May 2023



NCC 2022 HP, 5.7.4 (2) (d) (i)

NCC 2022 HP, 5.7.4 (2) (d) (ii)

NCC 2022 HP, 5.7.4 (2) (a)

NCC 2022 HP, 5.7.4 (2) (b)

NCC 2022 HP, 5.7.4 (2) (c)

NCC 2022 HP, 5.7.4 (2) (a)

NCC 2022 HP, 5.7.4 (2) (b)

NCC 2022 HP, 5.7.4 (2) (c)

Finished External Surface Fall



Surface Water Drainage RULES


NCC 2022 V1


Class 1 & 10


NCC 2022 HP 3.3.3 (a)


May 2023



NCC 2022 HP, 3.3.3 (a)

NCC 2022 Vol 2, H2P1

NCC 2022 Vol 2, H2D2

  • Rainwater Management & Drainage to the NCC requirementsNCC 2022 HP, 3.3.3 (a)NCC 2022 Vol 2, H2P1
  • Slope of the Ground Adjacent to the BuildingNCC 2022 Vol 2, H2D2
  • Low rainfall areas or Impermeable surfaces (e.g. concrete or paved)
  • ≥ 25mm fall over the first 1m
  • General requirement for all Other Cases
  • ≥ 50mm fall over the first 1m

Slab Edge Rebate


  • 50mm set down
  • Internal drainage
  • Gravel guard


Perimeter WATERPROOFING


NCC 2022 V1


  • 50mm set down
  • Internal drainage
  • Gravel guard

Excavation


  • Unretained embankment to Slope Ratio table with ≤ 2m[1] depth or height limitation
  • Cut or fill must be within site allotment[2]


Earthworks & Retaining


NCC 2022 V2


Class 1 & 10


NCC 2022 3.1 [2019 3.1]


May 2023



NCC 2022 HP, 3.2.1 (1) (c)

NCC 2022 HP, 3.2.1 (1) (a)