Perimeter Drainage Building Codes & Rules


- Perimeter Drainage Tools™ simplifies the National Construction Code (NCC) with interactive graphics, including deemed to comply & best practices.


Foam Joint

Fall

- copy

Fall

- copy

AS 4654.2:2012, 2.1

Floor Waste

  • Sump, Inlet Pit, Grate or Cage installed to minimise debris blockageAS 4654.2:2012, 2.1
  • Install level or below finished floor level

Fulgo Drain

Intermediate Floor Slab

Sleeved Dowel to Engineer's Detail

Fall

Spoon Drain

AS/NZS 3500.3:2021, M.12 (a) (i)

1:60AS/NZS 3500.3:2021, M.12 (a) (i)

AS/NZS 3500.3:2021, M.12 (a) (i)

1:60AS/NZS 3500.3:2021, M.12 (a) (i)

Basement Perimeter Wall

Sealant with Backing Rod

Drain Pipe

AS/NZS 3500.3:2021, 6.3.4

≥ 1:100AS/NZS 3500.3:2021, 6.3.4

Drip Groove

Downpipes


  • Compatible materials[1]
  • Securely attached[2]
  • Spacing depending on material[3]
  • As close as possible to supporting structure[4]
  • Clearance from any electrical, gas pipes & pipeworks[5]
  • Access provided[6]
  • Clear of any structural elements[7]


Downpipes INSTALLATION


NCC 2022 V2


All Building Classes


NCC 2022 F1D3, H2D2, H2D6, & Part 7.4

[2019 F1.1, 3.1.3.0 - 3.1.3.1, 3.5.1 - 3.5.5]


May 2023



NCC 2022 Vol 1, F1D3

NCC 2022 Vol 2, H2D2

NCC 2022 Vol 2, H2D6

NCC 2022 HP, 7.4

AS/NZS 3500.3:2021, 4.5.6 (a)

AS/NZS 3500.3:2021, 4.5.6 (b)

Water & Air TESTING


NCC 2022 V3


All Building Classes


NCC 2022 F1D3, H2D2, H2D6, & Part 7.4

[2019 F1.1, 3.1.3.0 - 3.1.3.1, 3.5.1 - 3.5.5]


May 2023



AS/NZS 3500.3:2021, 9.4.1

AS/NZS 3500.3:2021, 9.4.2

NCC 2022 Vol 1, F1D3

NCC 2022 Vol 2, H2D2

NCC 2022 Vol 2, H2D6

NCC 2022 HP, 7.4

Water testNCC 2022 Vol 2, H2D6

  • Head of water ≤ 3m
  • Seal all openings except the top
  • Fill with water to the highest level of the section
  • Maintain water at level
  • 10 minutes for clay drains
  • 5 minutes for other materials

Air testNCC 2022 HP, 7.4

  • 30KPa pressure to the drain for 3 minutes
  • Measure the time it takes for the pressure to drop from 25KPa to 20KPa

Metal or PVC Pipes PROS & CONS


NCC 2022 V1


  • Metal pipes
  • Durable but can corrode over time
  • UV resistant
  • Heavy weight
  • Expensive
  • PVC Pipes
  • Light weight
  • Easier to work with and replaceable
  • Non-durable since they deform permanently with extreme weather changes
  • Less costly

Metal or PVC Pipes PROS & CONS


NCC 2022 V1


  • Metal pipes
  • Durable but can corrode over time
  • UV resistant
  • Heavy weight
  • Expensive
  • PVC Pipes
  • Light weight
  • Easier to work with and replaceable
  • Non-durable since they deform permanently with extreme weather changes
  • Less costly


Metal or PVC Pipes PROS & CONS


NCC 2022 V2


  • Metal pipes
  • Durable but can corrode over time
  • UV resistant
  • Heavy weight
  • Expensive
  • PVC Pipes
  • Light weight
  • Easier to work with and replaceable
  • Non-durable since they deform permanently with extreme weather changes
  • Less costly

Downpipes SUPPORT


NCC 2022 V3


All Building Classes


NCC 2022 F1D3, H2D2, H2D6, & Part 7.4

[2019 F1.1, 3.1.3.0 - 3.1.3.1, 3.5.1 - 3.5.5]


May 2023



AS/NZS 3500.3:2021, 4.9.6.2

AS/NZS 3500.3:2021, 4.9.2

NCC 2022 Vol 1, F1D3

NCC 2022 Vol 2, H2D2

NCC 2022 Vol 2, H2D6

NCC 2022 HP, 7.4

AS/NZS 3500.3:2021, 2.2

AS/NZS 3500.3:2021, 4.9.2 (b)

AS/NZS 3500.3:2021, 4.9.6.2

AS/NZS 3500.3:2021, 4.5.6 (a) (iii)

AS/NZS 3500.3:2021, 4.5.6 (b) (iii) (A)

AS/NZS 3500.3:2021, 4.5.6 (d)

AS/NZS 3500.3:2021, 6.2.6

Substrate


  • Smooth, clean, dry & dust free surface[1]


Substrate PREPARATION


NCC 2022 V3


All Building Classes


NCC 2022 F2D2, S26C3, & HP10.2.9 [2019 F1.7]


May 2023



AS 3740:2021, 4.4.1

NCC 2022 Vol 1, F2D2

NCC 2022 Vol 1, S26C3 (1)

NCC 2022 HP, 10.2.9

  • Building elements in Wet Areas to be Waterproof or Water Resistant to the NCCAS 3740:2021, 4.4.1NCC 2022 Vol 1, F2D2NCC 2022 Vol 1, S26C3 (1)
  • All surfaces to be prepared for Waterproofing System adhesionNCC 2022 HP, 10.2.9
  • Smooth, dust-free, clean & dry surface
  • Fill voids
  • Grind smooth any protrusions
  • Free of formwork deformity
  • Prime substrate to prohibit pin-holing during the membrane curing process
  • Moisture test & apply primer as per Manufacturer's Recommendations

Substrate PREPARATION


NCC 2022 V1


  • Falls formed in the substrate directing water towards FW
  • ≥ 1 : 80 fall to shower area
  • Class 2 concrete finish
  • Well compacted
  • Rounded / arrised / filleted edges
  • No sharp edges, no back of the shovel finish, no un-vibrated areas

Substrate FALLS


NCC 2022 V2


All Building Classes


NCC 2022 F2D2, S26C3, 10.2.9, & 10.2.12 [2019 F1.7]


May 2023



AS 3740:2021, 2.3.1

AS 3740:2021, 2.3.5

NCC 2022 Vol 1, F2D2

NCC 2022 Vol 1, S26C3 (1)

NCC 2022 HP, 10.2.12

Substrate PREPARATION


NCC 2022 V1


Substrate PREPARATION


NCC 2022 V1


  • Falls formed in the substrate directing water towards FW
  • ≥ 1 : 80 fall to shower area
  • Class 2 concrete finish
  • Well compacted
  • Rounded / arrised / filleted edges
  • No sharp edges, no back of the shovel finish, no un-vibrated areas

AS 4654.2:2012, 2.5.3.1

Redirecting... (5)
Please wait while we redirect you to the correct page.