Piled Basement Building Codes & Rules


- Piled Basement Tools™ simplifies the National Construction Code (NCC) with interactive graphics, including deemed to comply & best practices.


Slotted Outlet & Grate Cap


  • ≥ 10mm below FFL
  • Ø 100mm sewer grade Pipe


Drainage


NCC 2022 V1


  • ≥ 10mm below FFL
  • Ø 100mm sewer grade Pipe

Spoon Drain

Mesh fixed behind Starter Bars

Vapour Barrier

Reinforced Wall

  • Shotcrete
  • Cut rock face

Floor Slab on Ground

Fall

Dropper

  • Galvanised Standoff Brackets
  • Align between floors
  • Protect from all impact, including vehicular

Intermediate Floor Slab

Drip

Groove

≥ 1:100

Finished Floor Level

Foam Joint

Access Panel

Foam

Joint

Sand Blinding

Wall on Integral Hob

Optional Void

Gravel

Galvanised Starter Bars

Industry Recommendation, -

≥ 150Industry Recommendation, -

Industry Recommendation, -

≥ 70Industry Recommendation, -

Industry Recommendation, -

≥ 20Industry Recommendation, -

Industry Recommendation, -

600 x 600Industry Recommendation, -

Drained Cavity Wall (Optional)


  • Provide Access Panels as required


Cavity Wall


NCC 2022 V1


  • Provide Access Panels as required

Strip Drainage Cell


  • 200 x 400
  • Spacing to Engineer's detail


Drainage


NCC 2022 V1


  • 200 x 400
  • Spacing to Engineer's detail