Stone Threshold Building Codes & Rules


- Stone Threshold Tools™ simplifies the National Construction Code (NCC) with interactive graphics, including deemed to comply & best practices.


Internal Waterproofing Overview

AS 3740:2021, 4.10

Sealant BeadAS 3740:2021, 4.10

Industry Recommendation

Waterstop AngleIndustry Recommendation

  • Preferred alignment to center of Door Leaf

Tools™ Best Practice

Jambs & ArchitravesTools™ Best Practice

  • Never embed in Tiles
  • Prime cut ends
  • Seal under ends to Tiles

AS 3740:2021, 4.2

NCC 2022 HP, 10.2.21

Sealer MembraneAS 3740:2021, 4.2NCC 2022 HP, 10.2.21

Stone Threshold

Bedding

Sealant

Stone Threshold - RCC Requirement

  • Sized to suit Threshold
  • Set into Door Rebate & extend across Door Opening as per site specific requirements

Sealant

Floor finish

Fall to Drain

Top of Membrane

Topping if Required

Substrate

Fall

NCC 2022 Vol 1, F2D4 (2)

NCC 2022 HP, 10.2.12 (a)

1 : 80 to 1 : 50NCC 2022 Vol 1, F2D4 (2)NCC 2022 HP, 10.2.12 (a)

AS 3740:2021, 4.9.2 (b)

≥ 2AS 3740:2021, 4.9.2 (b)

AS 1428.1:2009, 7.2 (a)

≤ 3AS 1428.1:2009, 7.2 (a)

AS 3740:2021, 2.3.1

AS 3740:2021, 2.3.5

≥ 1 : 100AS 3740:2021, 2.3.1 / 1 : 80AS 3740:2021, 2.3.5

Stone Threshold - Taylor Requirement

  • Sized to suit Threshold
  • Set into Door Rebate & extend across Door Opening as per site specific requirements

Stone Threshold

  • Sized to suit Threshold
  • Set into Door Rebate & extend across Door Opening as per site specific requirements

3

3 - 6

3 - 6

AS 3740:2021, 4.9.1 (c) (ii)

≥ 25AS 3740:2021, 4.9.1 (c) (ii)

Sealant

3 - 6

3

Split Jamb

Foam Expansion Joint

Split Jamb

M

M

M

Sealant over anchor screws

AS 3740:2021, 4.2

NCC 2022 HP, 10.2.21

MembraneAS 3740:2021, 4.2NCC 2022 HP, 10.2.21

AS 3740:2021, 4.10

FilletAS 3740:2021, 4.10

AS 3740:2021, 4.10

Sealant /

AdhesiveAS 3740:2021, 4.10

Finished Floor Level

Membrane Above Screed

Wall Lining

Anti-fungal Sealant

Wet area level

M

Screed

M

Top of Tile

Floor Tile

Adhesive

Wall Finish (Tiles)

Cavity Sliding Door

M

Show Waterstop Angle

Swing Door

Show Membrane

Typical Threshold

Floor Finish


  • Tile selection
  • P3 or R10 Slip Rating[1]
  • Movement Joints[2]
  • ≤ 4.5m CTS
  • Align with Structural movement or Control Joints
  • Above load bearing Beams or Walls


Tile TOLERANCE


NCC 2022 V2


All Building Classes


NCC 2022 F2D2, S26C3 [2019 F1.7]

NCC 2022 HP10.2.12


May 2023



NCC 2022 Vol 1, F2D4 (2)

AS 3740:2021, 2.3.1

AS 3740:2021, 2.3.5

NSW 2017 Guide to Standards & Tolerances, 12.6

AS 3958.1:2007, 5.4.6 (c)

AS 3958.1:2007, 5.4.6 (a)

NCC 2022 HP, 10.2.12

Slip RATING


NCC 2022 V2


All Building Classes


NCC 2022 D1P2


May 2023



NCC 2022 Vol 1, D1P2

NCC 2022 Vol 1, D3D15

HB 198:2014, 4.3.2 (Table 3A)

HB 198:2014, 5.2 (Table 3B)

HB 198:2014, 5.1

AS 3958.1:2007, 5.4.5.2

Membrane


  • Turn the Membrane down into the Leak Control Flange[1]
  • Compatible to suit Substrate & bedding / finishes[2]
  • Test & protect from damage[3]


Membrane AUDIT


NCC 2022 V2


All Building Classes


NCC 2022 F2D2, S26C3, 10.2.26 [2019 F1.7]


May 2023



AS 3740:2021, 4.5.4 (a)

AS 3740:2021, 4.5.4 (b)

AS 3740:2021, 4.5.4 (c)

AS 3740:2021, 4.5.2

  • Building elements in Wet Areas to be Waterproof or Water Resistant to NCC Specification 26, Part 10.2, & AS 3740
  • Curing & protectionAS 3740:2021, 4.5.4 (a)
  • Fully cured to manufacturers' recommendations
  • Protect from physical & chemical damage until covered by finishes
  • Flood testingAS 3740:2021, 4.5.4 (b)
  • If any leaks occur, these shall be repaired following the system design & retested
  • Electronic leak detectionAS 3740:2021, 4.5.4 (c)
  • If any discontinuities occur, these shall be repaired & retested only on the repaired areas
  • Seam probe testingAS 3740:2021, 4.5.2
  • If any seam failures occur, these shall be repaired & retested

Membrane Curing & Inspection RULES


NCC 2022 V2


All Building Classes


NCC 2022 F2D2, S26C3, 10.2.28 [2019 F1.7]



May 2023



AS 3740:2021, 4.5.2

AS 3740:2021, 4.5.3

  • Building elements in Wet Areas to be Waterproof or Water Resistant to NCC Specification 26, Part 10.2, & AS 3740
  • Fully cure prior to any testingAS 3740:2021, 4.5.2
  • Visual inspection conducted prior to application of overlay finishesAS 3740:2021, 4.5.3

AS 3740:2021, 4.3.1 (a)

AS 3740:2021, 3.2

AS 3740:2021, 4.17 (b)

Membrane Substrate


  • ≥ 1 : 100 fall required towards the Floor Waste[1]
  • ≥ 1 : 80 fall required to entire room where Shower unscreened[2]
  • Form falls in Structural Floor or Screed[3]
  • Smooth, clean, dry & dust free surface[4]


Substrate PREPARATION


NCC 2022 V4


All Building Classes


NCC 2022 F2D2, S26C3, & HP10.2.9 [2019 F1.7]


May 2023



AS 3740:2021, 4.4.1

  • Building elements in Wet Areas to be Waterproof or Water Resistant to the NCC
  • All surfaces to be prepared for Waterproofing System adhesionAS 3740:2021, 4.4.1
  • Smooth, dust-free, clean & dry surface
  • Fill voids
  • Grind smooth any protrusions
  • Free of formwork deformity
  • Prime substrate to prohibit pin-holing during the membrane curing process
  • Moisture test & apply primer as per Manufacturer's Recommendations

Substrate PREPARATION


NCC 2022 V1


AS 3740:2021, 2.3

AS 3740:2021, 4.4.1

AS 3740:2021, 2.3.1

AS 3740:2021, 2.3.5