Stone Threshold Building Codes & Rules


- Stone Threshold Tools™ simplifies the National Construction Code (NCC) with interactive graphics, including deemed to comply & best practices.


Screed

M

Top of Tile

Floor Tile

Adhesive

Wall finish (tiles)

Cavity Sliding Door

M

Sealant / Adhesive

Wall Lining

Sealant bead

Anti-fungal Sealant

Wet area level

Sealer Membrane (Stone Finish only)

Stone Threshold

Bedding

Sealant

Stone Threshold - RCC Requirement

  • Sized to suit Threshold
  • Set into Door Rebate & extend across Door Opening as per site specific requirements

Sealant

Floor finish

Fall to Drain

Top of Membrane

Topping if Required

Jambs & Architraves

  • Never embed in Tiles
  • Prime cut ends
  • Seal under ends to Tiles

Substrate

Fall

Swing Door

Waterstop Angle

Membrane

NCC 2022 Vol 1, F2D4 (2)

NCC 2022 HP, 10.2.12 (a)

1 : 80 to 1 : 50NCC 2022 Vol 1, F2D4 (2)NCC 2022 HP, 10.2.12 (a)

AS 3740:2021, 4.9.2 (b)

≥ 2AS 3740:2021, 4.9.2 (b)

AS 1428.1:2009, 7.2 (a)

≤ 3AS 1428.1:2009, 7.2 (a)

AS 3740:2021, 2.3.1

AS 3740:2021, 2.3.5

≥ 1 : 100AS 3740:2021, 2.3.1 / 1 : 80AS 3740:2021, 2.3.5

Stone Threshold - Taylor Requirement

  • Sized to suit Threshold
  • Set into Door Rebate & extend across Door Opening as per site specific requirements

Stone Threshold

  • Sized to suit Threshold
  • Set into Door Rebate & extend across Door Opening as per site specific requirements

3

3 - 6

3 - 6

AS 3740:2021, 4.9.1 (c) (ii)

≥ 25AS 3740:2021, 4.9.1 (c) (ii)

Sealant

Typical Threshold

3 - 6

3

Membrane


  • Turn the Membrane down into the Leak Control Flange[1]
  • Compatible to suit Substrate & bedding / finishes[2]
  • Test & protect from damage[3]


Membrane AUDIT


NCC 2022 V2


All Building Classes


NCC 2022 F2D2, S26C3, 10.2.26 [2019 F1.7]


May 2023



AS 3740:2021, 4.5.4 (a)

AS 3740:2021, 4.5.4 (b)

AS 3740:2021, 4.5.4 (c)

AS 3740:2021, 4.5.2

  • Building elements in Wet Areas to be Waterproof or Water Resistant to NCC Specification 26, Part 10.2, & AS 3740
  • Curing & protectionAS 3740:2021, 4.5.4 (a)
  • Fully cured to manufacturers' recommendations
  • Protect from physical & chemical damage until covered by finishes
  • Flood testingAS 3740:2021, 4.5.4 (b)
  • If any leaks occur, these shall be repaired following the system design & retested
  • Electronic leak detectionAS 3740:2021, 4.5.4 (c)
  • If any discontinuities occur, these shall be repaired & retested only on the repaired areas
  • Seam probe testingAS 3740:2021, 4.5.2
  • If any seam failures occur, these shall be repaired & retested

Membrane Curing & Inspection RULES


NCC 2022 V2


All Building Classes


NCC 2022 F2D2, S26C3, 10.2.28 [2019 F1.7]



May 2023



AS 3740:2021, 4.5.2

AS 3740:2021, 4.5.3

  • Building elements in Wet Areas to be Waterproof or Water Resistant to NCC Specification 26, Part 10.2, & AS 3740
  • Fully cure prior to any testingAS 3740:2021, 4.5.2
  • Visual inspection conducted prior to application of overlay finishesAS 3740:2021, 4.5.3

AS 3740:2021, 4.3.1 (a)

AS 3740:2021, 3.2

AS 3740:2021, 4.17 (b)

Split Jamb

Floor Finish


  • Tile selection
  • P3 or R10 Slip Rating[1]
  • Movement Joints[2]
  • ≤ 4.5m CTS
  • Align with Structural movement or Control Joints
  • Above load bearing Beams or Walls


Tile TOLERANCE


NCC 2022 V2


All Building Classes


NCC 2022 F2D2, S26C3 [2019 F1.7]

NCC 2022 HP10.2.12


May 2023



NCC 2022 Vol 1, F2D4 (2)

AS 3740:2021, 2.3.1

AS 3740:2021, 2.3.5

NSW 2017 Guide to Standards & Tolerances, 12.6

AS 3958.1:2007, 5.4.6 (c)

AS 3958.1:2007, 5.4.6 (a)

NCC 2022 HP, 10.2.12

HB 198:2014, 5.1

AS 3958.1:2007, 5.4.5.2

Finished floor level

Foam Expansion Joint

M

Split Jamb

Membrane

Sealant fillet

M

M

Waterstop

Angle

M

Sealant over anchor screws

Membrane Substrate


  • ≥ 1 : 100 fall required towards the Floor Waste[1]
  • ≥ 1 : 80 fall required to entire room where Shower unscreened[2]
  • Form falls in Structural Floor or Screed[3]
  • Smooth, clean, dry & dust free surface[4]


Substrate PREPARATION


NCC 2022 V4


All Building Classes


NCC 2022 F2D2, S26C3, & HP10.2.9 [2019 F1.7]


May 2023



AS 3740:2021, 4.4.1

  • Building elements in Wet Areas to be Waterproof or Water Resistant to the NCC
  • All surfaces to be prepared for Waterproofing System adhesionAS 3740:2021, 4.4.1
  • Smooth, dust-free, clean & dry surface
  • Fill voids
  • Grind smooth any protrusions
  • Free of formwork deformity
  • Prime substrate to prohibit pin-holing during the membrane curing process
  • Moisture test & apply primer as per Manufacturer's Recommendations

Substrate PREPARATION


NCC 2022 V1


AS 3740:2021, 2.3

AS 3740:2021, 4.4.1

AS 3740:2021, 2.3.1

AS 3740:2021, 2.3.5

Redirecting... (5)
Please wait while we redirect you to the correct page.