Pavers on Pedestal Supports Building Codes & Rules
- Pavers on Pedestal Supports: Tools™ simplifies the National Construction Code (NCC) with interactive graphics, including deemed to comply & best practices.
Door or Window Sill
M
Fillet
Floor System
M
Pedestal
Support
Acoustic / Underlay
Fall
Angle
Facade Building Interfaces
Façade Engineers to be engaged to review ALL building envelope interfaces
Facade Interface REQUIREMENTS
NCC 2022 V1
Façade Engineers are to be engaged to review ALL interfaces within a building envelope
Some interfaces within a residential façade (e.g. curtain wall/window wall/cladding) will be the ultimate responsibility of the sub contractor, but
the Façade engineer is still required to peer review the interface details within each system
Façade Engineer is to highlight unique interfaces of a building enclosure in their FP1.4 Report and either
regulate the design themselves (e.g. NSW D&BP approach), or
determine a pathway on who will document or certify the weatherproofing of the unique interface
Façade Engineers to be engaged to review ALL building envelope interfaces
Height sufficient to prevent wind-driven water entry[1]
Membrane Height INTERPRETATION
NCC 2022 V1
NCC 2022 Vol 1, F1D5
AS 4654.2:2012, 2.8.1.1
AS 4654.2:2012, 2.8.3 (b)
The following Tools™ interpretation should be confirmed as DtS or Performance Solution
A roof, balcony, podium or similar horizontal surface part of a building must be provided with a waterproofing membrane to AS 4654.1 & 2NCC 2022 Vol 1, F1D5
AS 4654.2-2012, 2.8.1.1 states Membrane height above finished surface is sufficient to prevent wind-driven water entering the buildingAS 4654.2:2012, 2.8.1.1
Termination heights are given in the Standard as a guide only, so
The heights given are not mandatory
The "finished surface level" is implied as a solid non-draining surface
AS 4654.2-2012, 2.8.3 (b) states where the floor finishes do not allow an upturn, the membrane must terminate into the stormwater system, this is backed up by a Zero Threshold diagramAS 4654.2:2012, 2.8.3 (b)
Pavers on pedestals are a similar solution
The free draining pavers are the grate
The membraned balcony with falls is the drain to stormwater
The membrane termination height is provided above the "water holding surface" which is also protected from wind driven rain by the pavers
Membrane Vertical Termination CERTIFICATION
NCC 2022 V1
Confirm with Waterproofing Consultant to confirm installation is considered DtS or Performance Solution
Mirvac's current position is considered DtS with Vertical Termination measured from Overflow Level
If horizontally discharged, taken vertically from the invert of the Overflow, or
If vertically discharged, taken vertically from the top of the Overflow
Membrane Height RULES
NCC 2022 V1
All Building Classes
NCC 2022 F1D5 [2019 Table F1.4]
May 2023
NCC 2022 Vol 1, F1D5
AS 4654.2:2012, 2.8.1.1
AS 4654.2:2012, A
A roof, balcony, podium or similar horizontal surface part of a building must be provided with a waterproofing membraneNCC 2022 Vol 1, F1D5
To AS 4654.1 & AS 4654.2
Unless is a deck or perforated or directly above ground