Roof Slab Penetrations Building Codes & Rules


- Roof Slab Penetrations Tools™ simplifies the National Construction Code (NCC) with interactive graphics, including deemed to comply & best practices.


≥ 100

Anchor Point


  • Fully waterproofed & fully sealed
  • Chemical anchor


Anchor Point


NCC 2022 V1


  • Fully waterproofed & fully sealed
  • Chemical anchor

M

Drainage Cell

Fillet

M

M

M

M

Ballast

Pipe

Install Fire Stopping / Collar if required

≥ 75mm embedment

to Chemical Anchor

or as Engineer requires

M

M

M

M

≥ 100

≥ 50

Geo-Filter Fabric

Reinforcement

- copy

Drainage Cell

≥ 100

Conduit

Slip Sheet

Fillet Around

Pipe

Fillet Around

Reinforcement

M

Fillet Around

Conduit

Stainless

Steel Anchor

Baseplate over neoprene Gasket

M

Fillet

Fillet Around

Reinforcement

Reinforcement

  • Avoid clashes with Services or Starter Bars
  • Locate Post Tensioned Tendons if applicable

M

M

M

M

M

M

M

Pipe Penetration


  • Space between pipes to facilitate installation of membrane ≥ 100mm
  • Membrane turn up pipe at plinth base ≥ 50mm
  • ≥ 75mm spacing from plinth edges


Pipe Penetration


NCC 2022 V1


  • Space between pipes to facilitate installation of membrane ≥ 100mm
  • Membrane turn up pipe at plinth base ≥ 50mm
  • ≥ 75mm spacing from plinth edges

Pipe Penetrations


  • ≥ 100mm clearance between pipes to assist membrane installation
  • ≥ 50mm Membrane turn up pipe at plinth base
  • ≥ 75mm from plinth edges for larger penetrations


Pipe Penetration


NCC 2022 V1


  • ≥ 50mm Waterproofing membrane and U.V. stable elastomeric coating returned up pipe
  • 316 grade stainless steel jubilee clip
  • Falls to top of Plinth to shed water
  • ≥ 100mm clearance between pipes to assist membrane installation
  • ≥ 50mm Membrane turn up pipe at plinth base
  • ≥ 75mm from plinth edges for larger penetrations

150

≥ 50

≥ 100

≥ 50

Conduit Penetrations


  • ≥ 100mm spacing between conduits
  • Membrane turn-up to Conduit
  • ≥ 25mm for Primed & Liquid Applied Membrane, or
  • ≥ 50mm for Stainless Steel clamped collar over either Liquid or Sheet type Membranes
  • ≥ 50mm from plinth edges


Conduit Penetrations


NCC 2022 V1


  • Plastic conduits cast into hob and turned down 180°
  • After cables are pulled through seal the end
  • ≥ 100mm spacing between conduits to assist installation of membrane
  • ≥ 25mm waterproofing membrane up conduit
  • Seal base of conduits
  • ≥ 50mm from plinth edges to prevent cracking
  • The base of conduit to be fully sealed
  • U.V. stable elastomeric coating to protect membrane
  • ≥ 100mm spacing between conduits
  • Membrane turn-up to Conduit
  • ≥ 25mm for Primed & Liquid Applied Membrane, or
  • ≥ 50mm for Stainless Steel clamped collar over either Liquid or Sheet type Membranes
  • ≥ 50mm from plinth edges

Anchor Point


  • Fully waterproofed & fully sealed
  • Chemical anchor


Anchor Point


NCC 2022 V1


  • Fully waterproofed & fully sealed
  • Chemical anchor

Anchor Point


  • Fully waterproofed & fully sealed
  • Chemical anchor


Anchor Point


NCC 2022 V1


  • Chemical anchor as specified by structural engineer
  • First membrane, installed before anchor point
  • Primary membrane, applied after installation of anchor point
  • Fully waterproofed & fully sealed
  • Chemical anchor

≥ 25

≥ 25

Ballast

Reinforcement

M

Fall

M

Slip Sheet

Post Supports

  • Hot dip gal corrosion protection
  • Membrane turn up post at plinth base ≥ 100mm
  • Dry pack under base plate

M

Concrete Plinth

≥ 50

Tools™ Best Practice

Membrane TerminationTools™ Best Practice

  • ≥ 50mm Membrane Upturn
  • Stainless Steel Clamped Collar

Conduit Penetration


  • ≥ 100mm spacing between conduits
  • Membrane turn up conduit at plinth base ≥ 25mm
  • ≥ 50mm spacing from plinth edges


Conduit Penetration


NCC 2022 V1


  • ≥ 100mm spacing between conduits
  • Membrane turn up conduit at plinth base ≥ 25mm
  • ≥ 50mm spacing from plinth edges

Tools™ Best Practice

Membrane TerminationTools™ Best Practice

  • ≥ 50mm Membrane Upturn
  • Stainless Steel Clamped Collar

Industry Recommendation, -

Industry Recommendation, -

150

≥ 50

Industry Recommendation, -

≥ 100

Conduit Penetration


  • ≥ 100mm spacing between conduits
  • Membrane turn up conduit at plinth base ≥ 25mm
  • ≥ 50mm spacing from plinth edges


Conduit Penetration


NCC 2022 V1


  • ≥ 100mm spacing between conduits
  • Membrane turn up conduit at plinth base ≥ 25mm
  • ≥ 50mm spacing from plinth edges

Industry Recommendation, -

Industry Recommendation, -

Industry Recommendation, -

Industry Recommendation, -

Industry Recommendation, -

Fixing

≥ 50

Pipe Penetration


  • Space between pipes to facilitate installation of membrane ≥ 100mm
  • Membrane turn up pipe at plinth base ≥ 50mm
  • ≥ 75mm spacing from plinth edges


Pipe Penetration


NCC 2022 V1


  • Space between pipes to facilitate installation of membrane ≥ 100mm
  • Membrane turn up pipe at plinth base ≥ 50mm
  • ≥ 75mm spacing from plinth edges

Post Base


  • Prime cut end & allow drainage gap under Post[1]
  • Upturn Membrane to prevent water penetration[2]
  • Clamped seal to Sheet Membrane
  • Chemical seal Liquid Membrane


Post INSTALLATION


NCC 2022 V1


Fixings


NCC 2022 V2


Post INSTALLATION


NCC 2022 V1


All Building Classes


NCC 2022 H2D8 [2019 3.8.1.3]


May 2023



NCC 2022 Vol 2, H2D8

AS 4654.2:2012, 2.8.4

  • A Roof, Balcony, Podium or similar horizontal surface must be waterproofed to the NCCNCC 2022 Vol 2, H2D8
  • Post Base InstallationAS 4654.2:2012, 2.8.4
  • Install Post Base before Membrane placement
  • If placed onto a completed Membrane, repair any damage
  • Durable timber or metal Post
  • Isolate Membrane from Vibration or Movement to prevent damage

AS 4654.2:2012, 2.8.4

AS 4654.2:2012, 2.8.4