- Roof Slab Penetrations Tools™ simplifies the National Construction Code (NCC) with interactive graphics, including deemed to comply & best practices.
≥ 100
Anchor Point
Fully waterproofed & fully sealed
Chemical anchor
Anchor Point
NCC 2022 V1
Fully waterproofed & fully sealed
Chemical anchor
M
Drainage Cell
Fillet
M
M
M
M
Ballast
Pipe
Install Fire Stopping / Collar if required
≥ 75mm embedment
to Chemical Anchor
or as Engineer requires
M
M
M
M
≥ 100
≥ 50
Geo-Filter Fabric
Reinforcement
- copy
Drainage Cell
≥ 100
Conduit
Slip Sheet
Fillet Around
Pipe
Fillet Around
Reinforcement
M
Fillet Around
Conduit
Stainless
Steel Anchor
Baseplate over neoprene Gasket
M
Fillet
Fillet Around
Reinforcement
Reinforcement
Avoid clashes with Services or Starter Bars
Locate Post Tensioned Tendons if applicable
M
M
M
M
M
M
M
Pipe Penetration
Space between pipes to facilitate installation of membrane ≥ 100mm
Membrane turn up pipe at plinth base≥ 50mm
≥ 75mm spacing from plinth edges
Pipe Penetration
NCC 2022 V1
Space between pipes to facilitate installation of membrane ≥ 100mm
Membrane turn up pipe at plinth base≥ 50mm
≥ 75mm spacing from plinth edges
Pipe Penetrations
≥ 100mm clearance between pipes to assist membrane installation
≥ 50mm Membrane turn up pipe at plinth base
≥ 75mm from plinth edges for larger penetrations
Pipe Penetration
NCC 2022 V1
≥ 50mm Waterproofing membrane and U.V. stable elastomeric coating returned up pipe
316 grade stainless steel jubilee clip
Falls to top of Plinth to shed water
≥ 100mm clearance between pipes to assist membrane installation
≥ 50mm Membrane turn up pipe at plinth base
≥ 75mm from plinth edges for larger penetrations
150
≥ 50
≥ 100
≥ 50
Conduit Penetrations
≥ 100mm spacing between conduits
Membrane turn-up to Conduit
≥ 25mmfor Primed & Liquid Applied Membrane, or
≥ 50mm for Stainless Steel clamped collar over either Liquid or Sheet type Membranes
≥ 50mm from plinth edges
Conduit Penetrations
NCC 2022 V1
Plastic conduits cast into hob and turned down 180°
After cables are pulled through seal the end
≥ 100mm spacing between conduits to assist installation of membrane
≥ 25mm waterproofing membrane up conduit
Seal base of conduits
≥ 50mm from plinth edges to prevent cracking
The base of conduit to be fully sealed
U.V. stable elastomeric coating to protect membrane
≥ 100mm spacing between conduits
Membrane turn-up to Conduit
≥ 25mmfor Primed & Liquid Applied Membrane, or
≥ 50mm for Stainless Steel clamped collar over either Liquid or Sheet type Membranes
≥ 50mm from plinth edges
Anchor Point
Fully waterproofed & fully sealed
Chemical anchor
Anchor Point
NCC 2022 V1
Fully waterproofed & fully sealed
Chemical anchor
Anchor Point
Fully waterproofed & fully sealed
Chemical anchor
Anchor Point
NCC 2022 V1
Chemical anchor as specified by structural engineer
First membrane, installed before anchor point
Primary membrane, applied after installation of anchor point