Laying Membrane Building Codes & Rules


- Laying Membrane Tools™ simplifies the National Construction Code (NCC) with interactive graphics, including deemed to comply & best practices.


9

8

Multiple Membranes

6

5

Side Lap

End Lap

staggered

3

2

1

7

4

Membrane

Substrate

Fall

Fall

End Lap

Single Membrane or

Highest Point

Planning


  • Edge details must be carefully considered
  • Pads, penetrations & anchors installed prior to WPM


Preparation


NCC 2022 V1


  • Edge details must be carefully considered
  • Pads, penetrations & anchors installed prior to WPM

Lowest Point

End Lap

staggered

Laying Membrane


  • Placement from the lowest point on the longitudinal direction of fall[1]
  • Minimum overlap required
  • Ensure full curing


Membrane OVERLAP


NCC 2022 V3


All Building Classes


NCC 2022 F1D5, H2D8, & HP10.2 [2019 F1.4, 3.8.1.2, 3.8.1.3]


May 2023



AS 4654.2:2012, 2.6.1

NCC 2022 Vol 1, F1D5

NCC 2022 Vol 2, H2D8

NCC 2022 HP, 10.2.1

Application BEST PRACTICE


NCC 2022 V1


AS 4654.2:2012, 2.6.1

  • Placement from the lowest point on the longitudinal direction of fallAS 4654.2:2012, 2.6.1
  • Minimum overlap required
  • Ensure full curing