Lift Pit with Toe Building Codes & Rules


- Lift Pit Tools™ simplifies the National Construction Code (NCC) with interactive graphics, including deemed to comply & best practices.


Membrane


  • Sheet Membrane by approved Manufacturer
  • Tap for options


Membrane


NCC 2022 V1


  • Sheet Membrane by approved Manufacturer
  • Tap for options

M

Toe if Designed

Integral Hob

Vertical Cold Joint

Earth Batter &

Fill to Engineer's Detail

Sump

Blinding if Specified

Optional Sheet Membrane

Membrane

Continuous Water Bar

PVC Water Bar

Builders Plastic

Fall

Fillet

Protection 

Board

Double Cast in

Fillet & Sealant

M

M

M

M

M

M

Industry Recommendation, -

150Industry Recommendation, -

Industry Recommendation, -

700Industry Recommendation, -

75

Industry Recommendation, -

75Industry Recommendation, -

75

150

700

Concrete


  • Class 3 Finish
  • Performance & Shrinkage to Structural Design[1]


Concrete COVER


NCC 2022 V3


All Building Classes


NCC 2022 4.2.11 [2019 3.2.3.2]


May 2023



AS 3600:2018, 4.10.3.2

AS 3600:2018, 4.3.1 (c)

  • Concrete must comply with the NCC
  • Cover for standard Formwork & compaction as per tableAS 3600:2018, 4.10.3.2
  • Add thickness where cast against ground
  • Embedded elements must be protected from corrosion or deteriorationAS 3600:2018, 4.3.1 (c)

NCC 2022 HP, 4.2.11

Membrane


  • Sheet Membrane by approved Manufacturer
  • Tap for options


Membrane


NCC 2022 V1


  • Sheet Membrane by approved Manufacturer
  • Tap for options

Membrane


  • Sheet Membrane by approved Manufacturer
  • Tap for options


Membrane


NCC 2022 V1


  • Sheet Membrane by approved Manufacturer
  • Tap for options
Redirecting... (5)
Please wait while we redirect you to the correct page.