AS 4654.2:2012, 2.11
LocationAS 4654.2:2012, 2.11
- Above finished level & in a visible location
- Direct water away from building
- Visible so blockages can be easily detected
AS 4654.2:2012, 2.5.2
Bond Breaker
- Form radius with sealant into Overflow
Height of Overflow
- ≥ 25mm below top of Sill, or
- Lowest opening height
Bond Breaker
- 10 x 10mm cast in blockout
- Remove & form Sealant radius
Height of Overflow
- ≥ 25mm below top of Sill, or
- Lowest opening height
Height of Overflow
- ≥ 25mm below top of Sill, or
- Lowest opening height
Bond Breaker
- 10 x 10mm cast in blockout
- Remove & form Sealant radius
AS 4654.2:2012, 2.5.2
AS 4654.2:2012, 2.11
Overflow Pipe Through ParapetAS 4654.2:2012, 2.11
- Bond breaker bridge between outlet pipe & upstand
- Membrane turned into Overflow
AS 4654.2:2012, 2.11
Base of Parapet
Concrete Screeds
Perimeter Expansion Joint
Preformed Flange
Membrane Height
- Height varies with wind class[1][2]
- Terminate with flashing, reglet or at drip groove[3][4]
Membrane Height RULES
NCC 2022 V1
All Building Classes
NCC 2022 F1D5 [2019 Table F1.4]
May 2023
NCC 2022 Vol 1, F1D5
AS 4654.2:2012, 2.8.1.1
AS 4654.2:2012, A
- A roof, balcony, podium or similar horizontal surface part of a building must be provided with a waterproofing membraneNCC 2022 Vol 1, F1D5
- To AS 4654.1 & AS 4654.2
- Unless is a deck or perforated or directly above ground
- Measured from top of surface finish to height of membraneAS 4654.2:2012, 2.8.1.1
- Height sufficient to prevent wind-driven water entry
- Varies depending on wind class & level of protection
- Termination heights to AS 4654.2 2012, Table A1 are minimum & informative onlyAS 4654.2:2012, A
- Must be specified based on individual project wind classification
AS 4654.2:2012, 2.8.1.1
AS 4654.2:2012, A
AS 4654.2:2012, 2.8.1.3
AS 4654.2:2012, 2.8.2.1
Redirecting... (5)
Please wait while we redirect you to the correct page.