Overflow Relief
Suitable overflow with Screw Cap for inspection Finish height to be below upper edge of Membrane Overflow Relief NCC 2022 V1 All Building Classes
AS 4654.2 2012, 2.13
14 Sep 2012 to Current
The Planter Box should be provided with a suitable Overflow & be designed for an appropriate rainfall intensity Screw Cap for clearing access Suitable overflow with Screw Cap for inspection Finish height to be below upper edge of Membrane Fillet Surround
to Penetration
Pressure or Over Flashing
Install Protection Board to
minimise root damage to
the Membrane
AS 4654.2:2012, 2.13 AS 4654.2:2012, 2.5.2 AS 4654.2:2012, 2.13 AS 4654.2:2012, 2.5.2 AS 4654.2:2012, 2.13 Bond Breaker
≥ 12mm depth for Bond Breakers at Floor/Wall Junction & intersections AS 4654.2:2012, 2.13 Geo-Filter Fabric to
turn up & secure
Site Tools
Exposed Walls
Fully waterproofed to prevent failure of the internal Planter Box Membrane Terminate Membrane with Capping to provide protection for exposed top surface Planter Box Walls NCC 2022 V2 Concrete Wall ≥ r 12mm arrised edge all external corners Concrete Wall to structural engineers' details Blockwork Wall Elastomeric coating to rendered planter wall Capping Blockwork Wall to structural engineers' details Trim render short of Slab & Seal Sawn Reglet 20mm deep & filled with compatible SealantPVC coated Flashing sealed & mechanically fastened into Sawn Reglet Membrane termination under Flashing Polyester Bandage over Flashing to properly seal all gaps Fully waterproofed to prevent failure of the internal Planter Box Membrane Terminate Membrane with Capping to provide protection for exposed top surface Over Flashing
Membrane
≥ 100mm from top of the soil surface [1] Class III [2] Membrane has High Extensibility & allows for even thickness Movement NCC 2022 V1 All Building Classes
NCC 2022 F1D5, H2D8, & HP10.2 [2019 F1.4, 3.8.1.2, 3.8.1.3]
May 2023
AS 4654.2:2012, 2.3 NCC 2022 Vol 1, F1D5 NCC 2022 Vol 2, H2D8 NCC 2022 HP, 10.2.1 Membrane Application NCC 2022 V1 AS 4654.2:2012, 2.13 AS 4654.1:2012, A2 Pressure Flashing
Falls
≥ 1:100 to Drainage Outlet[1] Fall RULES NCC 2022 V3 All Building Classes
NCC 2022 F1D5, H2D8, & HP10.2 [2019 F1.4, 3.8.1.2, 3.8.1.3]
May 2023
AS 4654.2:2012, 2.5.2 NCC 2022 Vol 1, F1D5 NCC 2022 Vol 2, H2D8 NCC 2022 HP, 10.2.1 AS 4654.2:2012, 2.5.2 Fillet
40 x 40mm S heet Membrane[1] 15 x 15mm Liquid Membrane[2] Fillet RULES NCC 2022 V4 All Building Classes
NCC 2022 F1D5, H2D8, & HP10.2 [2019 F1.4, 3.8.1.2, 3.8.1.3]
May 2023
AS 4654.2:2012, 2.7 NCC 2022 Vol 1, F1D5 NCC 2022 Vol 2, H2D8 NCC 2022 HP, 10.2.1 Building elements in Wet Areas to be Waterproof or Water-resistant to the NCCAS 4654.2:2012, 2.7 NCC 2022 Vol 1, F1D5 NCC 2022 Vol 2, H2D8 Membrane transitions from horizontal to vertical, or vertical to vertical planes, require the implementation of a Fillet, Cove, or Bond BreakerNCC 2022 HP, 10.2.1 40 x 40mm Fillet or cove for Sheet Membrane 15 x 15mm Fillet or Bond Breaker for Liquid Membrane AS 4654.2:2012, 2.7 AS 4654.2:2012, 2.7 Drainage
Pipe perforation for vertical drainage slits[1] Discharge to the Storm Water Collection System [2] Drainage RULES NCC 2022 V1 All Building Classes
NCC 2022 F1D5, H2D8, & HP10.2 [2019 F1.4, 3.8.1.2, 3.8.1.3]
May 2023
AS 4654.2:2012, 2.13 NCC 2022 Vol 1, F1D5 NCC 2022 Vol 2, H2D8 NCC 2022 HP, 10.2.1 Building elements in Wet Areas to be Waterproof or Water-resistant to the NCCAS 4654.2:2012, 2.13 NCC 2022 Vol 1, F1D5 NCC 2022 Vol 2, H2D8 Drainage Outlet to be connected to Storm Water System for proper dischargeNCC 2022 HP, 10.2.1 Membranes shall be sealed to Drainage Outlet Pipe is perforated with vertical slots to function as drainage conduit Geo-filter fabric extends up & is fixed to the Pipe above the Drainage Outlet Finished base of Planter Box to be sloped with a gradual incline leading to Drainage Outlet Planter Drainage NCC 2022 V1 AS 4654.2:2012, 2.13 AS 4654.2:2012, 2.13 Penetrations
Conduit size to suit contents All Joints watertight Conduit size to suit contents All Joints watertight Redirecting... (5)