Preformed Shower Base Building Codes & Rules


- Preformed Shower Base Tools™ simplifies the National Construction Code (NCC) with interactive graphics, including deemed to comply & best practices.


M

Membrane

Mortar bed

Wall Tiles

Rim

Nogging supporting edge of wall sheeting

Fall

Substrate

Fillet

Adhesive

Fillet

NCC 2022 Vol 1, F2D4 (2)

NCC 2022 HP, 10.2.12 (a)

1 : 80 to 1 : 50NCC 2022 Vol 1, F2D4 (2)NCC 2022 HP, 10.2.12 (a)

AS 3740:2021, 4.14

≥ 6AS 3740:2021, 4.14

Membrane

Fibre-

Cement

M

M

Sealant

Wall Frame

Preformed

Shower Base

M

M

M

Wall Lining

M

Leak Control

Flange

Sealant

Fall

AS 1684.2:2021, 4.6.3 (b)

≥ 150AS 1684.2:2021, 4.6.3 (b)

Fixings


  • Flush drive screws or Fibre-cement nails
  • Sealant wipe over head


Wall Lining SELECTION


NCC 2022 V4


  • Flush drive screws or Fibre-cement nails
  • Sealant wipe over head

Recessing


  • ≤ 25mm[1] to wall framing, or
  • Batten off studs


Rebating RULES


NCC 2022 V3


All Building Classes


NCC 2022 F2D2, S26C3, & HP10.2.19 [2019 F1.7, 3.8.1]


May 2023



NCC 2022 HP, 10.2.19

NCC 2022 Vol 1, F2D2

NCC 2022 Vol 1, S26C3 (1)

AS 3740:2021, 4.14 (b)

AS 1684.2:2021, 6.2.1.4

AS 3700:2018, 4.3

AS 1684.2:2021, 6.2.1.4

Preformed Shower Base


  • Support fully on mortar bed[1]
  • Recess behind wall lining[2]


Installation BEST PRACTICE


NCC 2022 V1


Installation RULES


NCC 2022 V2


All Building Classes


NCC 2022 F2D2, S26C3, & HP10.2.19 [2019 F1.7, 3.8.1]


May 2023



NCC 2022 HP, 10.2.19

NCC 2022 Vol 1, F2D2

NCC 2022 Vol 1, S26C3 (1)

AS 3740:2021, 4.14

AS 1684.2:2021, 4.6.3 (b)

AS 3740:2021, 4.14 (a)

AS 3740:2021, 4.14 (b)

Substrate


  • Form falls in Structural Floor or Screed[1]
  • Smooth, clean, dry & dust free surface[2]


Substrate FALLS


NCC 2022 V3


All Building Classes


NCC 2022 F2D2, S26C3, 10.2.9, & 10.2.12 [2019 F1.7]


May 2023



AS 3740:2021, 2.3.1

AS 3740:2021, 2.3.5

  • Building elements in Wet Areas to be Waterproof or Water Resistant to NCC Specification 26, Part 10.2, & AS 3740
  • ≥ 1 : 100 fall required approaching Floor WasteAS 3740:2021, 2.3.1
  • ≥ 1 : 80 fall required to entire room where Shower unscreenedAS 3740:2021, 2.3.5

Substrate PREPARATION


NCC 2022 V4


All Building Classes


NCC 2022 F2D2, S26C3, & HP10.2.9 [2019 F1.7]


May 2023



AS 3740:2021, 4.4.1

  • Building elements in Wet Areas to be Waterproof or Water Resistant to the NCC
  • All surfaces to be prepared for Waterproofing System adhesionAS 3740:2021, 4.4.1
  • Smooth, dust-free, clean & dry surface
  • Fill voids
  • Grind smooth any protrusions
  • Free of formwork deformity
  • Prime substrate to prohibit pin-holing during the membrane curing process
  • Moisture test & apply primer as per Manufacturer's Recommendations

Substrate PREPARATION


NCC 2022 V1


AS 3740:2021, 4.4.1

AS 3740:2021, 2.3

Redirecting... (5)
Please wait while we redirect you to the correct page.