Membrane
Compatible with[1] Vinyl Adhesive, or Cementitious Feather Coat with Bonding Additive Membrane NCC 2022 V1 Bonded Class III Membrane required for screed to adhere to Membrane ≥12mm depth Bond Breaker to all Floor Wall junctions & intersectionsStone Finishes require secondary Sealer Membrane to top of screed Bond Breakers required Include Acoustic Mat below Screed if required Movement NCC 2022 V3 All Building Classes
NCC 2022 F2D2, S26C6, & 10.2.6 [2019 F1.7, 3.8.1.3]
May 2023
AS 4654.2:2012, 2.3 Building elements in Wet Areas to be Waterproof or Water-resistant to NCC Specification 26, Part 10.2 & AS 4654.2 Membrane system shall be Class I, Class II or Class III Movement in accordance to AS 4654.1 Movement Risks areAS 4654.2:2012, 2.3 Deflection or Shrinkage before, during & after installation Temperature or Moisture changes Joint Movement Membrane NCC 2022 V2 Bonded Class III Membrane required for screed to adhere to Membrane Refer RCC Quality Alert #3 Concrete Finishes to Wet Areas ≥12mm depth Bond Breaker to all Floor Wall junctions & intersectionsStone Finishes require secondary Sealer Membrane to top of screed Bond Breakers required Include Acoustic Mat below Screed if required Membrane AUDIT NCC 2022 V2 All Building Classes
NCC 2022 F2D2, S26C3, 10.2.26 [2019 F1.7]
May 2023
AS 3740:2021, 4.5.4 (a) AS 3740:2021, 4.5.4 (b) AS 3740:2021, 4.5.4 (c) AS 3740:2021, 4.5.2 Building elements in Wet Areas to be Waterproof or Water Resistant to NCC Specification 26, Part 10.2, & AS 3740 Curing & protection AS 3740:2021, 4.5.4 (a) Fully cured to manufacturers' recommendations Protect from physical & chemical damage until covered by finishes Flood testing AS 3740:2021, 4.5.4 (b) If any leaks occur, these shall be repaired following the system design & retested Electronic leak detection AS 3740:2021, 4.5.4 (c) If any discontinuities occur, these shall be repaired & retested only on the repaired areas Seam probe testing AS 3740:2021, 4.5.2 If any seam failures occur, these shall be repaired & retested Membrane NCC 2022 V1 Bonded Class III Membrane required for screed to adhere to Membrane ≥12mm depth Bond Breaker to all Floor Wall junctions & intersectionsStone Finishes require secondary Sealer Membrane to top of screed Bond Breakers required Include Acoustic Mat below Screed if required AS 3740:2021, 3.2 Compatible withAS 3740:2021, 3.2 Vinyl Adhesive, or Cementitious Feather Coat with Bonding Additive Vinyl Floor
Ensure correct Slip Rating [1] for room usage Slip RATING NCC 2022 V2 All Building Classes
NCC 2022 D1P2
May 2023
HB 198:2014, 5.1 Engineered Screed to AS 1884
20MPa / 1.5MPa Comp / Tens strengthGrout repair to any slab defects
Redirecting... (5)
Please wait while we redirect you to the correct page.