Floor Waste - Insert Type Building Codes & Rules


- Floor Waste - Insert Type Tools™ simplifies the National Construction Code (NCC) with interactive graphics, including deemed to comply & best practices.


Grout

Sealant Bead

≤ 2

NCC 2022 Vol 1, F2D4 (2)

NCC 2022 HP, 10.2.12 (a)

1 : 80 to 1 : 50NCC 2022 Vol 1, F2D4 (2)NCC 2022 HP, 10.2.12 (a)

NCC 2022 Vol 1, F2D4 (2)

NCC 2022 HP, 10.2.12 (a)

1 : 80 to 1 : 50NCC 2022 Vol 1, F2D4 (2)NCC 2022 HP, 10.2.12 (a)

Fall

Adhesive

Slip Resistance

HB 198:2014, 5.1

P3 or R10HB 198:2014, 5.1

Floor Tile

Membrane

Leak Control

Flange

Top of Floor / Top of Tile Inlay

Sealant

Substrate

Sealer Membrane

M

M

M

Top of Floor

M

Sealant Bead

M

Screed

Fall

Substrate


  • Smooth, clean, dry & dust free surface[1]
  • Class 2 concrete finish preferred
  • In-situ falls to drainage


Substrate FALLS


NCC 2022 V3


All Building Classes


NCC 2022 F2D2, S26C3, 10.2.9, & 10.2.12 [2019 F1.7]


May 2023



AS 3740:2021, 2.3.1

AS 3740:2021, 2.3.5

  • Building elements in Wet Areas to be Waterproof or Water Resistant to NCC Specification 26, Part 10.2, & AS 3740
  • ≥ 1 : 100 fall required approaching Floor WasteAS 3740:2021, 2.3.1
  • ≥ 1 : 80 fall required to entire room where Shower unscreenedAS 3740:2021, 2.3.5

Substrate PREPARATION


NCC 2022 V4


All Building Classes


NCC 2022 F2D2, S26C3, & HP10.2.9 [2019 F1.7]


May 2023



AS 3740:2021, 4.4.1

  • Building elements in Wet Areas to be Waterproof or Water Resistant to the NCC
  • All surfaces to be prepared for Waterproofing System adhesionAS 3740:2021, 4.4.1
  • Smooth, dust-free, clean & dry surface
  • Fill voids
  • Grind smooth any protrusions
  • Free of formwork deformity
  • Prime substrate to prohibit pin-holing during the membrane curing process
  • Moisture test & apply primer as per Manufacturer's Recommendations

Substrate PREPARATION


NCC 2022 V1


AS 3740:2021, 4.4.1

  • Smooth, clean, dry & dust free surfaceAS 3740:2021, 4.4.1
  • Class 2 concrete finish preferred
  • In-situ falls to drainage

Concrete Screeds

Cut Edges

  • Arris edge to remove hazards

Large Tiles

  • Transverse cut larger format tiles to create falls to drain

Drainage

Screed

Floor Tile

M

Floor Tiles


  • Tile selection[1]
  • P3 or R10 Slip Rating
  • Movement joints[2]
  • ≤ 4.5m CTS
  • Align with structural movement or Control Joints
  • Above load bearing Beams or Walls


Slip RATING


NCC 2022 V2


All Building Classes


NCC 2022 D1P2


May 2023



Tile TOLERANCE


NCC 2022 V2


All Building Classes


NCC 2022 F2D2, S26C3 [2019 F1.7]

NCC 2022 HP10.2.12


May 2023



NCC 2022 Vol 1, F2D4 (2)

AS 3740:2021, 2.3.1

AS 3740:2021, 2.3.5

NSW 2017 Guide to Standards & Tolerances, 12.6

AS 3958.1:2007, 5.4.6 (c)

AS 3958.1:2007, 5.4.6 (a)

NCC 2022 HP, 10.2.12

AS 3958.1:2007, 5.4.5.2 (b)

HB 198:2014, 5.1

Membrane


  • Turn the Membrane down into the Leak Control Flange[1]
  • Compatible to suit substrate & bedding / finishes[2]
  • Test & protect from damage[3]


Membrane AUDIT


NCC 2022 V2


All Building Classes


NCC 2022 F2D2, S26C3, 10.2.26 [2019 F1.7]


May 2023



AS 3740:2021, 4.5.4 (a)

AS 3740:2021, 4.5.4 (b)

AS 3740:2021, 4.5.4 (c)

AS 3740:2021, 4.5.2

  • Building elements in Wet Areas to be Waterproof or Water Resistant to NCC Specification 26, Part 10.2, & AS 3740
  • Curing & protectionAS 3740:2021, 4.5.4 (a)
  • Fully cured to manufacturers' recommendations
  • Protect from physical & chemical damage until covered by finishes
  • Flood testingAS 3740:2021, 4.5.4 (b)
  • If any leaks occur, these shall be repaired following the system design & retested
  • Electronic leak detectionAS 3740:2021, 4.5.4 (c)
  • If any discontinuities occur, these shall be repaired & retested only on the repaired areas
  • Seam probe testingAS 3740:2021, 4.5.2
  • If any seam failures occur, these shall be repaired & retested

AS 3740:2021, 4.3.1

AS 3740:2021, 3.2

AS 3740:2021, 4.5.4