NCC 2022 Vol 1, F2D4 (2)
NCC 2022 HP, 10.2.12 (a)
AS 3958.1:2007, A.2.3
AS 3740:2021, 2.3.1
AS 3740:2021, 2.3.5
AS 1428.1:2009, 7.2 (a)
AS 3740:2021, 4.9.2 (b)
AS 3740:2021, 4.9.1 (c) (ii)
Sealer Membrane (Stone Finish only)
Grout repair to any slab defects
Jambs
- Never embed in Tiles
- Prime cut ends
- Seal under ends to Tiles
Waterstop Angle
- Preferred alignment to center of Door Leaf
Sealant over anchor screws
Waterstop Angle
Wall linings
- 6mm Fibre-cement for typical tile or paint finish
- 8mm gap to slab
Wall Lining INSTALLATION
NCC 2022 V1
Wall Lining SELECTION
NCC 2022 V5
- 6mm Fibre-cement for typical tile or paint finish
- 8mm gap to slab
Membrane
Membrane
- Turn the Membrane down into the Leak Control Flange[1]
- Compatible to suit Substrate & bedding / finishes[2]
- Test & protect from damage[3]
Membrane AUDIT
NCC 2022 V2
All Building Classes
NCC 2022 F2D2, S26C3, 10.2.26 [2019 F1.7]
May 2023
AS 3740:2021, 4.5.4 (a)
AS 3740:2021, 4.5.4 (b)
AS 3740:2021, 4.5.4 (c)
AS 3740:2021, 4.5.2
- Building elements in Wet Areas to be Waterproof or Water Resistant to NCC Specification 26, Part 10.2, & AS 3740
- Curing & protectionAS 3740:2021, 4.5.4 (a)
- Fully cured to manufacturers' recommendations
- Protect from physical & chemical damage until covered by finishes
- Flood testingAS 3740:2021, 4.5.4 (b)
- If any leaks occur, these shall be repaired following the system design & retested
- Electronic leak detectionAS 3740:2021, 4.5.4 (c)
- If any discontinuities occur, these shall be repaired & retested only on the repaired areas
- Seam probe testingAS 3740:2021, 4.5.2
- If any seam failures occur, these shall be repaired & retested
Membrane Curing & Inspection RULES
NCC 2022 V2
All Building Classes
NCC 2022 F2D2, S26C3, 10.2.28 [2019 F1.7]
May 2023
AS 3740:2021, 4.5.2
AS 3740:2021, 4.5.3
- Building elements in Wet Areas to be Waterproof or Water Resistant to NCC Specification 26, Part 10.2, & AS 3740
- Fully cure prior to any testingAS 3740:2021, 4.5.2
- Visual inspection conducted prior to application of overlay finishesAS 3740:2021, 4.5.3
AS 3740:2021, 4.3.1 (a)
AS 3740:2021, 3.2
AS 3740:2021, 4.17 (b)
Concrete Screeds
Cavity Slider
Membrane Substrate
- ≥ 1 : 100 fall required towards the Floor Waste[1]
- ≥ 1 : 80 fall required to entire room where Shower unscreened[2]
- Form falls in Structural Floor or Screed[3]
- Smooth, clean, dry & dust free surface[4]
Substrate PREPARATION
NCC 2022 V4
All Building Classes
NCC 2022 F2D2, S26C3, & HP10.2.9 [2019 F1.7]
May 2023
AS 3740:2021, 4.4.1
- Building elements in Wet Areas to be Waterproof or Water Resistant to the NCC
- All surfaces to be prepared for Waterproofing System adhesionAS 3740:2021, 4.4.1
- Smooth, dust-free, clean & dry surface
- Fill voids
- Grind smooth any protrusions
- Free of formwork deformity
- Prime substrate to prohibit pin-holing during the membrane curing process
- Moisture test & apply primer as per Manufacturer's Recommendations
Substrate PREPARATION
NCC 2022 V1
AS 3740:2021, 2.3
AS 3740:2021, 4.4.1
AS 3740:2021, 2.3.1
AS 3740:2021, 2.3.5
Floor Finish
- Tile selection
- P3 or R10 Slip Rating[1]
- Movement Joints[2]
- ≤ 4.5m CTS
- Align with Structural movement or Control Joints
- Above load bearing Beams or Walls
Tile TOLERANCE
NCC 2022 V2
All Building Classes
NCC 2022 F2D2, S26C3 [2019 F1.7]
NCC 2022 HP10.2.12
May 2023
NCC 2022 Vol 1, F2D4 (2)
AS 3740:2021, 2.3.1
AS 3740:2021, 2.3.5
NSW 2017 Guide to Standards & Tolerances, 12.6
AS 3958.1:2007, 5.4.6 (c)
AS 3958.1:2007, 5.4.6 (a)
NCC 2022 HP, 10.2.12
HB 198:2014, 5.1
AS 3958.1:2007, 5.4.5.2
Waterstop
- ≥ 40mm set down[1]
- ≥ 25mm Screed depth to be maintained when calculating Falls throughout the wet area[2]
- Sealant beads & fillets to protect Membrane[3]
Waterstop RULES
NCC 2022 V2
All Building Classes
NCC 2022 F2D2, S26C3, & Part 10.2.11 to 13 [2019 F1.7]
May 2023
AS 3740:2021, 3.3.1 (a)
AS 3740:2021, 3.3.3 (a) (iv)
AS 3740:2021, 4.9
AS 3740:2021, 3.3.3 (b) (ii)
AS 3740:2021, 3.3.1 (c)
Step up PROS & CONS
NCC 2022 V1
Water Stop INSTALLATION
NCC 2022 V1
Waterstop Angle
NCC 2022 V1
NCC 2022 HP, 10.2.2 (1) (c)
AS 3958.1:2007, 3.3.3.1 (e)
AS 3740:2021, 4.9.1 (d) (ii)
Internal Waterproofing Overview