Type 2 Unenclosed Shower Waterstop Building Codes & Rules


- UnenclosedT Shower Waterstop Tools™ simplifies the National Construction Code (NCC) with interactive graphics, including deemed to comply & best practices.


NCC 2022 Vol 1, F2D4 (2)

NCC 2022 HP, 10.2.12 (a)

1 : 80 to 1 : 50NCC 2022 Vol 1, F2D4 (2)NCC 2022 HP, 10.2.12 (a)

Sealer Membrane

Screed

Sealant

3

M

Shower floor

M

Sealant

Sealant

M

Sealant bead

M

Adhesive

M

Sealant

Sealant Bead

NCC 2022 Vol 1, F2D4 (2)

NCC 2022 HP, 10.2.12 (a)

1 : 80 to 1 : 50NCC 2022 Vol 1, F2D4 (2)NCC 2022 HP, 10.2.12 (a)

Floor System

Screed

Fall to FW

Fall to FW

Membrane

Bathroom floor

Adhesive

Sealer Membrane

Sealant /

Adhesive

M

Sealant

Screed


  • Bonded 15mm to 40mm thk[1]
  • Unbonded ≥ 40mm thk[2]


Screed RULES


NCC 2022 V1


All Building Classes


NCC 2022 F2D2 & S26C3


May 2023



AS 3958.1:2007, A.2.3 (a)

AS 3958.1:2007, A.2.3 (b)

AS 3958.1:2007, 3.3.1.1 (b) (i)

AS 3958.1:2007, 3.3.2.2 (b) (i)

NCC 2022 Vol 1, S26C3 (1)

NCC 2022 Vol 1, F2D2

AS 3958.1:2007, A.2.3 (a)

AS 3958.1:2007, A.2.3 (b)

Screened Shower

Concrete Screeds

Finishes


  • Avoid stone & other absorbent materials
  • Isolate joinery from wet surfaces


Preventing Water Damage


NCC 2022 V1


  • Avoid stone & other absorbent materials
  • Isolate joinery from wet surfaces

Screed


  • Bonded 15mm to 40mm thk[1]
  • Unbonded ≥ 40mm thk[2]


Screed RULES


NCC 2022 V1


All Building Classes


NCC 2022 F2D2 & S26C3


May 2023



AS 3958.1:2007, A.2.3 (a)

AS 3958.1:2007, A.2.3 (b)

AS 3958.1:2007, 3.3.1.1 (b) (i)

AS 3958.1:2007, 3.3.2.2 (b) (i)

NCC 2022 Vol 1, S26C3 (1)

NCC 2022 Vol 1, F2D2

AS 3958.1:2007, A.2.3 (a)

AS 3958.1:2007, A.2.3 (b)

Substrate


  • Smooth, clean, dry & dust free surface[1]
  • In-situ falls to drainage preferred


Substrate MATERIALS


NCC 2022 V3


All Building Classes


NCC 2022 F2D2, S26C3, & HP10.2.24 [2019 F1.7, 3.8.1]


May 2023



AS 3740:2021, 3.3.2 (a)

AS 3740:2021, 3.3.2 (b)

NCC 2022 HP, 10.2.1

NCC 2022 Vol 1, F2D2

NCC 2022 Vol 1, S26C3 (1)

Substrate PREPARATION


NCC 2022 V4


All Building Classes


NCC 2022 F2D2, S26C3, & HP10.2.9 [2019 F1.7]


May 2023



AS 3740:2021, 4.4.1

  • Building elements in Wet Areas to be Waterproof or Water Resistant to the NCC
  • All surfaces to be prepared for Waterproofing System adhesionAS 3740:2021, 4.4.1
  • Smooth, dust-free, clean & dry surface
  • Fill voids
  • Grind smooth any protrusions
  • Free of formwork deformity
  • Prime substrate to prohibit pin-holing during the membrane curing process
  • Moisture test & apply primer as per Manufacturer's Recommendations

Substrate PREPARATION


NCC 2022 V1


AS 3740:2021, 4.4.1

Waterstop Angle

Floor Tiles


  • P3 or R10 Slip Rating[1]
  • Falls to FW & transverse cuts to minimise ponding


Slip RATING


NCC 2022 V1


All Building Classes


NCC 2022 D1P2


May 2023



Tile TOLERANCE


NCC 2022 V3


All Building Classes


NCC 2022 F2D2, S26C3 [2019 F1.7]

NCC 2022 HP10.2.12


May 2023



NCC 2022 Vol 1, F2D4 (2)

AS 3740:2021, 2.3.1

AS 3740:2021, 2.3.5

NSW 2017 Guide to Standards & Tolerances, 12.6

AS 3958.1:2007, 5.4.6 (c)

AS 3958.1:2007, 5.4.6 (a)

NCC 2022 HP, 10.2.12

NCC 2022 Vol 1, S26C1 (a)

NCC 2022 HP, 10.2.1

HB 198:2014, 5.1

  • P3 or R10 Slip RatingHB 198:2014, 5.1
  • Falls to FW & transverse cuts to minimise ponding

Waterstop Angle


  • ≥ 1.5m[1] from Shower outlet
  • Finish flush with Floor[2]
  • Intersection with wall fully waterproofed[3]


Waterstop Angle RULES


NCC 2022 V2


All Building Classes


NCC 2022 F2D2, S26C3, & 10.2.18 [2019 F1.7]



May 2023



NCC 2022 HP, 10.2.17

NCC 2022 Vol 1, S26C1 (a)

AS 3740:2021, 4.8.2 (b)

AS 3740:2021, 4.6.1

AS 3740:2021, 4.8.1

AS 3740:2021, 4.8.2

Water Stop INSTALLATION


NCC 2022 V1


AS 3740:2021, 4.8.2 (b)

AS 3740:2021, 4.8.2

AS 3740:2021, 4.8.2