Sealer Membrane (Stone finish Only)
Waterstop Angle - RCC Requirement
- 300mm mechanical Fixing centres
- Sealant wipe over heads
- 2mm gap to Wall to allow for Movement
- File smooth all edges
- Sealant to all edges & junctions
Shower Screen - RCC Requirement
- Grade A Safety Glass
- To shed water into Shower
- Anti-fungal Sealant
NCC 2022 Vol 1, F2D4 (2)
NCC 2022 HP, 10.2.12 (a)
Cover Angle - RCC Requirement
Sealer Membrane (Stone finish Only)
AS 3740:2021, 2.3.1
AS 3740:2021, 2.3.2
Set-down to shower area if required to maintain screed thickeness
NCC 2022 Vol 1, F2D4 (2)
NCC 2022 HP, 10.2.12 (a)
Shower Screen - Taylor Requirement
- Grade A Safety Glass
- To shed water into Shower
- Anti-fungal Sealant
Shower Screen
- Grade A Safety Glass
- To shed water into Shower
- Anti-fungal Sealant
AS 3740:2021, 2.3.1
AS 3740:2021, 2.3.2
Waterstop Angle - Taylor Requirement
- 300mm mechanical Fixing centres
- Sealant wipe over heads
- 2mm gap to Wall to allow for Movement
- File smooth all edges
- Sealant to all edges & junctions
Waterstop Angle
- 300mm mechanical Fixing centres
- Sealant wipe over heads
- 2mm gap to Wall to allow for Movement
- File smooth all edges
- Sealant to all edges & junctions
Door Near Shower
Unenclosed Shower
Screed
- Bonded 15mm to 40mm thk[1]
- Unbonded ≥ 40mm thk[2]
Screed RULES
NCC 2022 V1
All Building Classes
NCC 2022 F2D2 & S26C3
May 2023
AS 3958.1:2007, A.2.3 (a)
AS 3958.1:2007, A.2.3 (b)
AS 3958.1:2007, 3.3.1.1 (b) (i)
AS 3958.1:2007, 3.3.2.2 (b) (i)
NCC 2022 Vol 1, S26C3 (1)
NCC 2022 Vol 1, F2D2
AS 3958.1:2007, A.2.3 (a)
AS 3958.1:2007, A.2.3 (b)
Screed
- Bonded 15mm to 40mm thk[1]
- Unbonded ≥ 40mm thk[2]
Screed RULES
NCC 2022 V1
All Building Classes
NCC 2022 F2D2 & S26C3
May 2023
AS 3958.1:2007, A.2.3 (a)
AS 3958.1:2007, A.2.3 (b)
AS 3958.1:2007, 3.3.1.1 (b) (i)
AS 3958.1:2007, 3.3.2.2 (b) (i)
NCC 2022 Vol 1, S26C3 (1)
NCC 2022 Vol 1, F2D2
AS 3958.1:2007, A.2.3 (a)
AS 3958.1:2007, A.2.3 (b)
Shower Stepdown
- ≥ 15mm Step-down[1]
- Compliance option Class 1 & 10[2]
- ≥ 25mm to NCC HP 2022[3]
Compliance Pathways
NCC 2022 V2
Class 1 & 10
NCC 2022 Vol 2, H4D2 & H4D3
May 2023
NCC 2022 Vol 2, H4D2
NCC 2022 Vol 2, H4D3
NCC 2022 Vol 1, F2D2
NCC 2022 Vol 2, H4D3
NCC 2022 HP, 10.2.15
AS 3740:2021, 4.8.2
Membrane Substrate
- ≥ 1 : 100 fall required towards the Floor Waste[1]
- ≥ 1 : 80 fall required to entire room where Shower unscreened[2]
- Form falls in Structural Floor or Screed[3]
- Smooth, clean, dry & dust free surface[4]
Substrate PREPARATION
NCC 2022 V4
All Building Classes
NCC 2022 F2D2, S26C3, & HP10.2.9 [2019 F1.7]
May 2023
AS 3740:2021, 4.4.1
- Building elements in Wet Areas to be Waterproof or Water Resistant to the NCC
- All surfaces to be prepared for Waterproofing System adhesionAS 3740:2021, 4.4.1
- Smooth, dust-free, clean & dry surface
- Fill voids
- Grind smooth any protrusions
- Free of formwork deformity
- Prime substrate to prohibit pin-holing during the membrane curing process
- Moisture test & apply primer as per Manufacturer's Recommendations
Substrate PREPARATION
NCC 2022 V1
AS 3740:2021, 2.3
AS 3740:2021, 4.4.1
AS 3740:2021, 2.3.1
AS 3740:2021, 2.3.5
Waterstop Angle
- Adhere & / or mechanically fix to substrate[1][2]
- Sealant beads & fillets to protect membrane[3]
Showers
NCC 2022 V1
- Separate from main area to AS 3740 by either
- Hob, or
- ≥ 15mm Setdown, or
- ≥ 5mm Upstand Angle under Framed Screen
- ≥ 1 : 80 fall required, Transverse cut large format Tiles
Waterstop RULES
NCC 2022 V3
All Building Classes
NCC 2022 F2D2, S26C3, & Part 10.2.11 to 13 [2019 F1.7]
May 2023
AS 3740:2021, 3.3.1 (a)
AS 3740:2021, 3.3.3 (a) (iv)
AS 3740:2021, 4.9
AS 3740:2021, 3.3.3 (b) (ii)
AS 3740:2021, 3.3.1 (c)
NCC 2022 HP, 10.2.1
NCC 2022 Vol 1, S26C1 (a)
- Building elements in Wet Areas to be Waterproof or Water Resistant to NCC Specification 26, Part 10.2AS 3740:2021, 3.3.1 (a)AS 3740:2021, 3.3.3 (a) (iv)
- Materials
- Stainless Steel, AluminiumAS 3740:2021, 4.9
- Vinyl Sheet Flooring, welded & sealedAS 3740:2021, 3.3.3 (b) (ii)AS 3740:2021, 3.3.1 (c)NCC 2022 HP, 10.2.1
- Door openings & protection at Floor level require waterproofing for a watertight sealNCC 2022 Vol 1, S26C1 (a)
- Use adhesive or mechanically fix to Substrate
- Sealant continuous across Door Opening
- Sealant beads & bond breaking fillets to protect Membrane
Water Stop INSTALLATION
NCC 2022 V1
Showers
NCC 2022 V1
AS 3740:2021, 4.6.1
AS 3740:2021, 4.8.1
AS 3740:2021, A.5.3
Membrane
- Turn the Membrane down into the Leak Control Flange[1]
- Compatible to suit Substrate & bedding / finishes[2]
- Test & protect from damage[3]
Membrane AUDIT
NCC 2022 V2
All Building Classes
NCC 2022 F2D2, S26C3, 10.2.26 [2019 F1.7]
May 2023
AS 3740:2021, 4.5.4 (a)
AS 3740:2021, 4.5.4 (b)
AS 3740:2021, 4.5.4 (c)
AS 3740:2021, 4.5.2
- Building elements in Wet Areas to be Waterproof or Water Resistant to NCC Specification 26, Part 10.2, & AS 3740
- Curing & protectionAS 3740:2021, 4.5.4 (a)
- Fully cured to manufacturers' recommendations
- Protect from physical & chemical damage until covered by finishes
- Flood testingAS 3740:2021, 4.5.4 (b)
- If any leaks occur, these shall be repaired following the system design & retested
- Electronic leak detectionAS 3740:2021, 4.5.4 (c)
- If any discontinuities occur, these shall be repaired & retested only on the repaired areas
- Seam probe testingAS 3740:2021, 4.5.2
- If any seam failures occur, these shall be repaired & retested
Membrane Curing & Inspection RULES
NCC 2022 V2
All Building Classes
NCC 2022 F2D2, S26C3, 10.2.28 [2019 F1.7]
May 2023
AS 3740:2021, 4.5.2
AS 3740:2021, 4.5.3
- Building elements in Wet Areas to be Waterproof or Water Resistant to NCC Specification 26, Part 10.2, & AS 3740
- Fully cure prior to any testingAS 3740:2021, 4.5.2
- Visual inspection conducted prior to application of overlay finishesAS 3740:2021, 4.5.3
AS 3740:2021, 4.3.1 (a)
AS 3740:2021, 3.2
AS 3740:2021, 4.17 (b)
Floor Tiles
- P3 or R10 Slip Rating[1]
- Falls to FW & transverse cuts to minimise ponding
Slip RATING
NCC 2022 V1
All Building Classes
NCC 2022 D1P2
May 2023
Tile TOLERANCE
NCC 2022 V3
All Building Classes
NCC 2022 F2D2, S26C3 [2019 F1.7]
NCC 2022 HP10.2.12
May 2023
NCC 2022 Vol 1, F2D4 (2)
AS 3740:2021, 2.3.1
AS 3740:2021, 2.3.5
NSW 2017 Guide to Standards & Tolerances, 12.6
AS 3958.1:2007, 5.4.6 (c)
AS 3958.1:2007, 5.4.6 (a)
NCC 2022 HP, 10.2.12
NCC 2022 Vol 1, S26C1 (a)
NCC 2022 HP, 10.2.1
- Building elements in Wet Areas to be Waterproof or Water Resistant to NCC Specification 26, Part 10.2NCC 2022 Vol 1, F2D4 (2)AS 3740:2021, 2.3.1
- Falls to Substrate
- ≥ 1 : 100 typicallyAS 3740:2021, 2.3.5
- ≥ 1 : 80 if whole room is an Unenclosed ShowerNSW 2017 Guide to Standards & Tolerances, 12.6
- Falls to Floor Finish
- ≥ 1 : 80 to 1 : 50AS 3958.1:2007, 5.4.6 (c)AS 3958.1:2007, 5.4.6 (a)
- Ponding
- < 1.5mm deep surface tension after 15 minutes
- Installation tolerance
- Standards & Tolerance Guides (Various States)NCC 2022 HP, 10.2.12
- Grout JointsNCC 2022 Vol 1, S26C1 (a)
- 3 to 6mm floor grout joints
- 1 to 2mm wall grout joints
- Lippage for Joints & FlatnessNCC 2022 HP, 10.2.1
- ≤ 1mm lippage for joints ≤ 3mm
- ≤ 2mm lippage for joints ≥ 3mm
- ± 4mm in 2m flatness tolerance
HB 198:2014, 5.1
- P3 or R10 Slip RatingHB 198:2014, 5.1
- Falls to FW & transverse cuts to minimise ponding
Shower Screen
- Door to shed water into the shower
Preventing Water Damage
NCC 2022 V1
- Door to shed water into the shower
Concrete Screeds
Finishes
- Avoid stone & other absorbent materials
- Isolate joinery from wet surfaces
Preventing Water Damage
NCC 2022 V1
- Avoid stone & other absorbent materials
- Isolate joinery from wet surfaces
Framed Shower Screen