Framed Shower Screen Waterstop Building Codes & Rules


- Framed Shower Screen Waterstop Tools™ simplifies the National Construction Code (NCC) with interactive graphics, including deemed to comply & best practices.


Fall to FW

Screed

Tools™ Best Practice

1 : 80Tools™ Best Practice

Fall to FW

Tools™ Best Practice

1 : 80Tools™ Best Practice

AS 3740:2021, 4.11.1

Sealant BeadAS 3740:2021, 4.11.1

AS 3740:2021, 4.11.1

Sealant / AdhesiveAS 3740:2021, 4.11.1

M

Screed

Adhesive

Bathroom Floor

Shower Screen Frame

Shower Floor

Adhesive

M

NCC 2022 HP, 10.2.21

AS 3740:2021, 4.2

MembraneNCC 2022 HP, 10.2.21AS 3740:2021, 4.2

Tools™ Best Practice

1 : 80Tools™ Best Practice

Do Not Seal

Falls to Drainage

M

M

M

NCC 2022 Vol 1, F2D4 (2)

NCC 2022 HP, 10.2.12 (a)

1 : 80 to 1 : 50NCC 2022 Vol 1, F2D4 (2)NCC 2022 HP, 10.2.12 (a)

NCC 2022 Vol 1, F2D4 (2)

NCC 2022 HP, 10.2.12 (a)

1 : 80 to 1 : 50NCC 2022 Vol 1, F2D4 (2)NCC 2022 HP, 10.2.12 (a)

Floor System

AS 3740:2021, 4.8.4 (a)

≥ 5AS 3740:2021, 4.8.4 (a)

AS 3740:2021, 4.8.4 (a)

≥ 5AS 3740:2021, 4.8.4 (a)

Waterstop Angle

Internal Waterproofing Overview

Substrate


  • Smooth, clean, dry & dust free surface[1]
  • In-situ falls to drainage preferred


Substrate MATERIALS


NCC 2022 V3


All Building Classes


NCC 2022 F2D2, S26C3, & HP10.2.24 [2019 F1.7, 3.8.1]


May 2023



AS 3740:2021, 3.3.2 (a)

AS 3740:2021, 3.3.2 (b)

NCC 2022 HP, 10.2.1

NCC 2022 Vol 1, F2D2

NCC 2022 Vol 1, S26C3 (1)

Substrate PREPARATION


NCC 2022 V4


All Building Classes


NCC 2022 F2D2, S26C3, & HP10.2.9 [2019 F1.7]


May 2023



AS 3740:2021, 4.4.1

  • Building elements in Wet Areas to be Waterproof or Water Resistant to the NCC
  • All surfaces to be prepared for Waterproofing System adhesionAS 3740:2021, 4.4.1
  • Smooth, dust-free, clean & dry surface
  • Fill voids
  • Grind smooth any protrusions
  • Free of formwork deformity
  • Prime substrate to prohibit pin-holing during the membrane curing process
  • Moisture test & apply primer as per Manufacturer's Recommendations

Substrate PREPARATION


NCC 2022 V1


AS 3740:2021, 4.4.1

Door Near Shower

Shower Screen


  • Door to shed water into the shower


Preventing Water Damage


NCC 2022 V1


  • Door to shed water into the shower

Membrane Above Screed

NCC 2022 HP, 10.2.21

AS 3740:2021, 4.2

MembraneNCC 2022 HP, 10.2.21AS 3740:2021, 4.2

NCC 2022 HP, 10.2.21

AS 3740:2021, 4.2

Sealer MembraneNCC 2022 HP, 10.2.21AS 3740:2021, 4.2

NCC 2022 HP, 10.2.21

AS 3740:2021, 4.2

Sealer MembraneNCC 2022 HP, 10.2.21AS 3740:2021, 4.2

AS 3740:2021, 4.11.1

SealantAS 3740:2021, 4.11.1

Screed


  • Bonded 15mm to 40mm thk[1]
  • Unbonded ≥ 40mm thk[2]


Screed RULES


NCC 2022 V2


All Building Classes


NCC 2022 F2D2 & S26C3


May 2023



AS 3958.1:2007, A.2.3 (a)

AS 3958.1:2007, A.2.3 (b)

AS 3958.1:2007, 3.3.1.1 (b) (i)

AS 3958.1:2007, 3.3.2.2 (b) (i)

NCC 2022 Vol 1, S26C3 (1)

NCC 2022 Vol 1, F2D2

AS 3958.1:2007, A.2.3 (a)

AS 3958.1:2007, A.2.3 (b)

Screed


  • Bonded 15mm to 40mm thk[1]
  • Unbonded ≥ 40mm thk[2]


Screed RULES


NCC 2022 V2


All Building Classes


NCC 2022 F2D2 & S26C3


May 2023



AS 3958.1:2007, A.2.3 (a)

AS 3958.1:2007, A.2.3 (b)

AS 3958.1:2007, 3.3.1.1 (b) (i)

AS 3958.1:2007, 3.3.2.2 (b) (i)

NCC 2022 Vol 1, S26C3 (1)

NCC 2022 Vol 1, F2D2

AS 3958.1:2007, A.2.3 (a)

AS 3958.1:2007, A.2.3 (b)

Floor Tiles


  • P3 or R10 Slip Rating[1]
  • Falls to FW & transverse cuts to minimise ponding


Tile TOLERANCE


NCC 2022 V6


All Building Classes


NCC 2022 F2D2, S26C3 [2019 F1.7]

NCC 2022 HP10.2.12


May 2023



NCC 2022 Vol 1, F2D4 (2)

AS 3740:2021, 2.3.1

AS 3740:2021, 2.3.5

NSW 2017 Guide to Standards & Tolerances, 12.6

AS 3958.1:2007, 5.4.6 (c)

AS 3958.1:2007, 5.4.6 (a)

NCC 2022 HP, 10.2.12

NCC 2022 Vol 1, S26C1 (a)

NCC 2022 HP, 10.2.1

Slip RATING


NCC 2022 V2


All Building Classes


NCC 2022 D1P2


May 2023



NCC 2022 Vol 1, D1P2

NCC 2022 Vol 1, D3D15

HB 198:2014, 4.3.2 (Table 3A)

HB 198:2014, 5.2 (Table 3B)

HB 198:2014, 5.1

  • P3 or R10 Slip RatingHB 198:2014, 5.1
  • Falls to FW & transverse cuts to minimise ponding

Waterstop Angle


  • ≥ 5mm[1] projection above FFL
  • Adhere & / or mechanically fix to substrate[2][3]
  • Sealant beads & fillets to protect membrane[4]


Showers


NCC 2022 V1


  • Separate from main area to AS 3740 by either
  • Hob, or
  • ≥ 15mm Setdown, or
  • ≥ 5mm Upstand Angle under Framed Screen
  • ≥ 1 : 80 fall required, Transverse cut large format Tiles

Waterstop RULES


NCC 2022 V3


All Building Classes


NCC 2022 F2D2, S26C3, & Part 10.2.11 to 13 [2019 F1.7]


May 2023



AS 3740:2021, 3.3.1 (a)

AS 3740:2021, 3.3.3 (a) (iv)

AS 3740:2021, 4.9

AS 3740:2021, 3.3.3 (b) (ii)

AS 3740:2021, 3.3.1 (c)

NCC 2022 HP, 10.2.1

NCC 2022 Vol 1, S26C1 (a)

Water Stop INSTALLATION


NCC 2022 V1


Showers


NCC 2022 V1


AS 3740:2021, 4.6.1

AS 3740:2021, 4.8.1

AS 3740:2021, A.5.3

AS 3740:2021, 4.8.4 (a)

Redirecting... (5)
Please wait while we redirect you to the correct page.