Steel Door Jamb Building Codes & Rules


- Steel Door Jamb Tools™ simplifies the National Construction Code (NCC) with interactive graphics, including deemed to comply & best practices.


Steel Door Jamb

  • Trim base to suit Setdown
  • Compatible primer
  • 3 to 5mm Membrane extension beyond Finishes
  • Paint finish

Sealant bead

Boxed Studs

Staggered Fixings

≤ 300

Sealant Fillet

8

≤ 3

2

3 to 5

3 to 5

M

2

≤ 300

Grout repair to any slab defects

Wet Area Finished floor level

≥ 150

≥ 25

Top of Membrane

Finished level

Non-shrink grout Packer if required to maintain height

M

M

Structural level

Waterstop Angle - RCC Requirement

  • 300mm mechanical Fixing centres
  • Sealant wipe over heads
  • 2mm gap to jamb to allow for movement
  • File smooth all edges
  • Sealant to all edges & junctions

≥ 1 : 100 / 1 : 80

Finished floor level

Fall to Drain

Aligned centreline of Door Leaf

≤ 3

Wet Area Finished floor level

- copy

8

Junctions


  • ≥ 12mm[1] Bond breaker Fillet to all Class III Membrane Junctions


Junction RULES


NCC 2022 V4


All Building Classes


NCC 2022 F2D2, S26C3, & Part 10.2.24 [2019 F1.7, 3.8.1]


May 2023



AS 3740:2021, 4.10

AS 3740:2021, 4.13.2.2

  • NCC 2022 F2D2, S26C3, & Part 10.2.24 [2019 F1.7, 3.8.1]
  • Building elements in Wet Areas to be Waterproof or Water Resistant to NCC Specification 26, NCC Part 10.2, & AS 3740
  • Backing rod, tape, or sealant should be installed when the membrane is bonded to the substrate
  • Type depending on membrane flexibility classAS 3740:2021, 4.10

Class I Membrane (low extensibility)

  • Resin systems, or water-based epoxies membranes
  • ≥ 6mm ØAS 3740:2021, 4.13.2.2 backing rod should be installed to allow the membranes to flex instead of stretch, with a continuous tape between backing rod and membrane to keep it in place

Class II Membrane (medium extensibility)

  • Acrylic membranes, bitumen-based emulsions or mastics membranes
  • Tape to allow the membrane to stretch

Class III Membrane (high extensibility)

  • Polyurethane, PVC, rubber, or EPDM membrane
  • Fillet or sealant to allow even thickness to the membrane

AS 3740:2021, 4.10

Wall linings


  • 6mm fibre cement for typical tile or paint finish
  • 8mm gap to structural floor


Wall Lining


NCC 2022 V2


  • 6mm fibre cement for typical tile or paint finish
  • 8mm gap to structural floor

Waterstop


  • ≥ 40mm set down
  • ≥ 25mm Screed depth to be maintained when calculating falls throughout the wet area
  • Sealant beads & fillets to protect membrane


Waterstop RULES


NCC 2022 V1


All Building Classes


NCC 2022 F2D2, S26C3, & Part 10.2.11 to 13 [2019 F1.7]


May 2023



Water Stop INSTALLATION


NCC 2022 V1


  • ≥ 40mm set down
  • ≥ 25mm Screed depth to be maintained when calculating falls throughout the wet area
  • Sealant beads & fillets to protect membrane

Membrane Substrate


  • ≥ 1 : 100 fall required towards the Floor Waste
  • ≥ 1 : 80 fall required to entire room where Shower unscreened
  • Form falls in Structural Floor or Screed
  • Smooth, clean, dry & dust free surface


Substrate FALLS


NCC 2022 V1


All Building Classes


NCC 2022 F2D2, S26C3, 10.2.9, & 10.2.12 [2019 F1.7]


May 2023



Substrate PREPARATION


NCC 2022 V1


Substrate PREPARATION


NCC 2022 V1


All Building Classes


NCC 2022 F2D2, S26C3, & 10.2.9 [2019 F1.7]


May 2023



  • ≥ 1 : 100 fall required towards the Floor Waste
  • ≥ 1 : 80 fall required to entire room where Shower unscreened
  • Form falls in Structural Floor or Screed
  • Smooth, clean, dry & dust free surface

Waterstop Angle

  • Preferred alignment to center of Door Leaf

Sealant over anchor screws